Engineer X, Y, Z each assemble computers at their respecitve constant rates. If Rx is the ratio of Engineer X's constant rate to Engineer Z's constant rate and Ry is the ratio of Engineer Y's constant rate to Engineer Z's constant rate, is Engineer Z's constant rate the greatest of the three?
1) Rx < Ry
2) Ry < 1
|
|
|
|
|
|
|
Manager
Joined: 13 Aug 2005
Posts: 140
Followers: 1
Kudos [?]:
1
[0], given: 0
|
It looks like C.
from 1 => Vx<Vy=> not suf
from 2=>Vy<Vz => not suf
Together Vx<Vy<Vz suf.
|
|
|
|
|
|
VP
Joined: 21 Sep 2003
Posts: 1079
Location: USA
Followers: 2
Kudos [?]:
17
[0], given: 0
|
Re: Engineers work [#permalink]
05 Feb 2006, 03:33
C it is.
Rx = X/Z
Ry = Y/Z
1) X/Z < Y/Z, Only X < Y can be concluded. No info about Z. INSUFF
2) Y/Z < 1. No indo about X. INSUFF
Combining:
X/Z < Y/Z < Z/Z (=1)
=> X < Y < Z
Hence C!
_________________
"To dream anything that you want to dream, that is the beauty of the human mind. To do anything that you want to do, that is the strength of the human will. To trust yourself, to test your limits, that is the courage to succeed."
- Bernard Edmonds
|
|
|
|
|
|
Director
Joined: 19 Feb 2005
Posts: 508
Location: Milan Italy
Followers: 1
Kudos [?]:
2
[0], given: 0
|
Agree with (C).
Nice explanation giddi
_________________
Please allow me to introduce myself: I'm a man of wealth and taste
|
|
|
|
|
|
Senior Manager
Joined: 11 Jan 2006
Posts: 277
Location: Chennai,India
Followers: 1
Kudos [?]:
3
[0], given: 0
|
Giddi , excellant explanation...  i got C too ... same approach!
_________________
vazlkaiye porkalam vazltuthan parkanum.... porkalam maralam porkalthan maruma
|
|
|
|
|
|
SVP
Joined: 28 Dec 2005
Posts: 1612
Followers: 1
Kudos [?]:
54
[0], given: 2
|
late but C. happy that i actually got it !!
Rx = X/Z
Ry = Y/Z
1) Rx<Ry. Since Z is the same in both cases, this must mean that X<Y, but doesnt tell us anything about Z. INSUFF, so eliminate A and D
2) Ry<1. This tells us that Y must be less than Z, but still no comparison with X. INSUFF, so eliminate B.
Putting together, we know that X<Y, and Y<Z, therefore it must follow that X<Y<Z, so yes, Z is the greatest rate.
C is the answer
|
|
|
|
|
|
GMAT Club Legend
Joined: 07 Jul 2004
Posts: 5134
Location: Singapore
Followers: 9
Kudos [?]:
89
[0], given: 0
|
X/Z = Rx
Y/Z = Ry
1) Insufficient.
If X/Z = Rx = 1, then X = 2. If Y/Z = 2, then Y = 2Z. In this case, Y is the fastest.
But if X/Z = Rx = 1/4 = 4X = Z. If Y/Z = 1/2 then 2Y = Z. In this case, Z is the fastest.
2) Ry is less than 1, but information about Rx. Insufficient.
Using 1) and 2), Z is the fastest.
Ans C
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Similar topics |
Author |
Replies |
Last post |
|
Similar Topics:
|
|
|
|
Robots X, Y and Z each assemble components at their
|
buckkitty |
2 |
12 Mar 2006, 13:09 |
|
1
|
|
Robots X, Y, and Z each assemble components at their
|
mrsmarthi |
7 |
31 Mar 2009, 17:00 |
|
3
|
|
Robots X, Y, and Z each assemble components at their
|
ajit257 |
3 |
03 Jan 2011, 18:30 |
|
5
|
|
Robots X, Y, and Z each assemble components at their respect
|
Bunuel |
6 |
24 Sep 2012, 05:16 |
|
|
|
|
|
|