|
Author |
Message |
|
SVP
Joined: 04 May 2006
Posts: 1946
Schools: CBS, Kellogg
Followers: 10
Kudos [?]:
168
[0], given: 1
|
With both valves open, the pool will be filled with water in 48 minutes. The first valve alone would fill the pool in 2 hours. What is the capacity of the pool if every minute the second valve admits 50 cubic meters of water more than the first? (A) 9000 cubic meters (B) 10500 cubic meters (C) 11750 cubic meters (D) 12000 cubic meters (E) 12500 cubic meters Source: GMAT Club Tests - hardest GMAT questions I sweated when time gone!
_________________
Find out what's new at GMAT Club - latest features and updates
|
|
|
|
|
|
|
|
|
Manager
Joined: 27 Jul 2007
Posts: 115
Followers: 1
Kudos [?]:
5
[0], given: 0
|
I get D
let x mcube be the vol
then 60*x/(x+3000) = 48 => x = 12000
|
|
|
|
|
|
Manager
Joined: 10 Mar 2008
Posts: 68
Followers: 2
Kudos [?]:
23
[4] , given: 0
|
4
This post received KUDOS
sondenso wrote: With both valves open, the pool will be filled with water in 48 minutes. The first valve alone would fill the pool in 2 hours. What is the capacity of the pool if every minute the second valve admits 50 cubic meters of water more than the first?
9000 cubic meters 10500 cubic meters 11750 cubic meters 12000 cubic meters 12500 cubic meters
I sweated when time gone! let first taps speed be x cu/min then second taps speed be x+50 cu/min then 48(x+(x+50))= total capacity---------(1) since first tap can fill in 2 hrs 60*2(x) is total capacity------------(2) equating x=100 total capacity=100*2*60 =12000 hope this is clear
|
|
|
|
|
|
Retired Moderator
Joined: 18 Jul 2008
Posts: 1003
Followers: 7
Kudos [?]:
40
[1] , given: 5
|
1
This post received KUDOS
I'm confused here:
Shouldn't we add the quantity of valve1 + quantity of valve2 = total quantity? Please tell me where I'm going wrong.
For example:
This is what I did:
1. Figure out the time Valve 2 took to fill the pool by itself
1/Valve1 + 1/Valve2 = 1/48 1/120 mins (or 2 hours) + 1/Valve2 = 1/48 mins Valve2 = 80 mins
2. Find the Quantity to fill the pool X
120(X) + 80 (X+50) = 48 (2x + 50)
So this is where it goes down hill... not sure why we don't include 80 (X+50) in the equation?
|
|
|
|
|
|
Senior Manager
Joined: 30 Nov 2008
Posts: 498
Schools: Fuqua
Followers: 9
Kudos [?]:
101
[2] , given: 15
|
2
This post received KUDOS
bigfernhead wrote: I'm confused here:
Shouldn't we add the quantity of valve1 + quantity of valve2 = total quantity? Please tell me where I'm going wrong.
For example:
This is what I did:
1. Figure out the time Valve 2 took to fill the pool by itself
1/Valve1 + 1/Valve2 = 1/48 1/120 mins (or 2 hours) + 1/Valve2 = 1/48 mins Valve2 = 80 mins
2. Find the Quantity to fill the pool X
120(X) + 80 (X+50) = 48 (2x + 50)
So this is where it goes down hill... not sure why we don't include 80 (X+50) in the equation? Step 1 is correct in that you found that Valve 2 can fill a tank in 80 min. Step 2 is wrong. Valve 1 can fill the tank in 120 Min with x being the volume filled per min - So total volume = 120*x ----> Eq1 Valve 2 can fill the tank in 80 min with (x+50) being the volume filled per min. So the total volume = 80(x+50) ---> Eq2 Together can fill the tank in 48 min with (x + (x + 5)) being the volume filled per min. So the total volume = 48(x + (x + 5)) ---> Eq 3. To solve for x, pick any of the 2 of the 3 eq, ie either equate Eq 1 = Eq 2 or Eq 1 = Eq 3 or Eq2 = Eq 3 and get the ie 120X = 80(x + 50) ==> x = 100. We get x = 100. Now substitute value of x in any of the 3 eq and you should get the total volume.
|
|
|
|
|
|
SVP
Joined: 07 Nov 2007
Posts: 1842
Location: New York
Followers: 20
Kudos [?]:
291
[2] , given: 5
|
2
This post received KUDOS
sondenso wrote: rohit929 wrote: sondenso wrote: With both valves open, the pool will be filled with water in 48 minutes. The first valve alone would fill the pool in 2 hours. What is the capacity of the pool if every minute the second valve admits 50 cubic meters of water more than the first?
9000 cubic meters 10500 cubic meters 11750 cubic meters 12000 cubic meters 12500 cubic meters
I sweated when time gone! let first taps speed be x cu/min then second taps speed be x+50 cu/min then 48(x+(x+50))= total capacity---------(1) since first tap can fill in 2 hrs 60*2(x) is total capacity------------(2) equating x=100 total capacity=100*2*60 =12000 hope this is clear So sooooooo great, rohit! Thanks! I lost many basic, I think. I approach this by using work rate = work/time. And stucked!  Indeed "rate = work/time" approach is same as rohit used. capacity=work = rate*time = (x +x+50)*48 capacity= rate*time = x*120
_________________
Your attitude determines your altitude Smiling wins more friends than frowning
|
|
|
|
|
|
Manager
Joined: 13 Aug 2009
Posts: 208
Followers: 3
Kudos [?]:
60
[5] , given: 16
|
5
This post received KUDOS
Here is how I solved the problem:
9. With both valves open, the pool will be filled with water in 48 minutes. The first valve alone would fill the pool in 2 hours. What is the capacity of the pool if every minute the second valve admits 50 cubic meters of water more than the first? * 9000 cubic meters * 10500 cubic meters * 11750 cubic meters * 12000 cubic meters * 12500 cubic meters
let B = # of mins for the second valve alone to fill the pool
1/(time it takes first valve to fill the pool) + 1/B = 1/(total time its takes to fill the pool) 1/120 + 1/B = 1/48 B = 80
let C = the capacity of the pool C/80 - C/120 = 50 C = 12000
ANSWER: D. 12000
|
|
|
|
|
|
Director
Joined: 01 Apr 2008
Posts: 921
Followers: 8
Kudos [?]:
123
[0], given: 18
|
Here x and x+50 are nothing but the rates of the pipes. R1 + R2 = R ( R=combined rate )
x+x+50 = Capacity/48, Now capacity = 120x => 2x+50 = 120x/48 => x=100
|
|
|
|
|
|
Intern
Joined: 15 Nov 2009
Posts: 31
Location: Moscow, Russia
Followers: 0
Kudos [?]:
8
[0], given: 0
|
48 min = 0.8 hrs, then if x is pool's volume both pipes open for 0.8 hrs - x cubic m (multiply both sides by 5) for 4 hrs - 5x cubic m Within 4 hrs the first pipe alone could fill 2 pools, the second 3 pools. So, the second could fill one pool more than the 1st being open for 4hrs. x=4*60*50=12000 (D).
Last edited by nvgroshar on 26 Jan 2011, 11:03, edited 1 time in total.
|
|
|
|
|
|
Manager
Joined: 20 Oct 2009
Posts: 115
Schools: MIT LGO (Admitted), Harvard (Admitted))
Followers: 6
Kudos [?]:
14
[0], given: 0
|
It's actually an easy word question - just take your time to set up the x variable - let x be the amount of water in cube meter the first valve admits per minute, x+50 will be for the second valve 48(x+(x+50))=60*2x => x=100 substitute back to the right hand side of the equation => total capacity=100*120 =12,000 Usually when I have enough time, I put the x value in the left side to see if I get 12,000 as well - just for sanity check
_________________
Dream the impossible and do the incredible.
Live. Love. Laugh.
|
|
|
|
|
|
Manager
Joined: 26 Nov 2009
Posts: 180
Followers: 3
Kudos [?]:
49
[0], given: 5
|
from the given info we know that
1/x+1/y=48 ( both valve will fill in 48 mins) 1/x=1/120 (fist valve will fill in 2 hrs or 120 mins)
so by solving 1/y=1/80 (second valve will take 80 mins)
first valve =1/120 second valve =1/80
if the tank can be filled by first valve in 120 minutes and the second one by 80 mins
then answer should be exactly divided by 120 and 80 only choice D satisfies this criterion so I picked ans D ( of courseif it contains more than one choice divisble by 120 and 80 then you'll have to solve it precisely)
or you can solve this by solving for x tradionaly by applying formula as everyone stated above
1/120(x)+1/80(x+5)=1/48(2x+5)
|
|
|
|
|
|
Manager
Joined: 16 Feb 2010
Posts: 236
Followers: 2
Kudos [?]:
22
[0], given: 16
|
With both valves open, the pool will be filled with water in 48 minutes. The first valve alone would fill the pool in 2 hours. If the second valve emits 50 cubic meters of water more than the first every minute, then what is the capacity of the pool?
(C) 2008 GMAT Club - m12#10
* 9000 cubic meters * 10500 cubic meters * 11750 cubic meters * 12000 cubic meters * 12500 cubic meters |
still puzzled how to do it my way.... found out that the rate of V1 is 1/120 and V2 is 1/100....correct? if yes, then how to find volume? thanks.....
|
|
|
|
|
|
GMAT Club team member
Joined: 02 Sep 2009
Posts: 11582
Followers: 1797
Kudos [?]:
9581
[1] , given: 826
|
1
This post received KUDOS
zisis wrote: With both valves open, the pool will be filled with water in 48 minutes. The first valve alone would fill the pool in 2 hours. If the second valve emits 50 cubic meters of water more than the first every minute, then what is the capacity of the pool?
(C) 2008 GMAT Club - m12#10
* 9000 cubic meters * 10500 cubic meters * 11750 cubic meters * 12000 cubic meters * 12500 cubic meters |
still puzzled how to do it my way.... found out that the rate of V1 is 1/120 and V2 is 1/100....correct? if yes, then how to find volume? thanks..... Let the rate of the first valve be x cubic meters per minute, then the rate of the second valve will be x+50 cubic meters per minute. As both valves open fill the pool in 48 minutes then the capacity of the pool equals to C=time*combined \ rate=48(x+x+50)=48(2x+50); But as the first valve alone fills the pool in 2 hours (120 minutes) then the capacity of the pool also equals to C=time*rate=120x; So, 120x=48(2x+50) --> x=100 --> C=120x=12,000. Answer: D. Hope it's clear.
_________________
PLEASE READ AND FOLLOW: 11 Rules for Posting!!!
RESOURCES: [GMAT MATH BOOK]; 1. Triangles; 2. Polygons; 3. Coordinate Geometry; 4. Factorials; 5. Circles; 6. Number Theory
COLLECTION OF QUESTIONS: PS: 1. Tough and Tricky questions; 2. Hard questions; 3. Hard questions part 2; 4. Standard deviation; 5. Tough Problem Solving Questions With Solutions; 6. Probability and Combinations Questions With Solutions; 7 Tough and tricky exponents and roots questions; 8 12 Easy Pieces (or not?); 9 Bakers' Dozen; 10 Algebra set. NEW!!!
DS: 1. DS tough questions; 2. DS tough questions part 2; 3. DS tough questions part 3; 4. DS Standard deviation; 5. Inequalities; 6. 700+ GMAT Data Sufficiency Questions With Explanations; 7 Tough and tricky exponents and roots questions; 8 The Discreet Charm of the DS ; 9 Devil's Dozen!!!; 10 Number Properties set. NEW!!!
 What are GMAT Club Tests? 25 extra-hard Quant Tests
Find out what's new at GMAT Club - latest features and updates
|
|
|
|
|
|
Director
Status: GMAT Learner
Joined: 14 Jul 2010
Posts: 672
Followers: 21
Kudos [?]:
108
[0], given: 31
|
Total Volume = x First valve and second valve take 48 minutes to fill the pool The both valves filled x/48 in 1 minute First valve filled x/120 part in 1 minute So, Second valve filled in 1 minute = x/48 - x/120 = 3x/240 part Given that 3x/240 - x/120 = 50 x =12000 Ans. D.
_________________
I am student of everyone-baten Collections:- PSof OG solved by GC members: http://gmatclub.com/forum/collection-ps-with-solution-from-gmatclub-110005.html DS of OG solved by GC members: http://gmatclub.com/forum/collection-ds-with-solution-from-gmatclub-110004.html 100 GMAT PREP Quantitative collection http://gmatclub.com/forum/gmat-prep-problem-collections-114358.html Collections of work/rate problems with solutions http://gmatclub.com/forum/collections-of-work-rate-problem-with-solutions-118919.html Mixture problems in a file with best solutions: http://gmatclub.com/forum/mixture-problems-with-best-and-easy-solutions-all-together-124644.html
|
|
|
|
|
|
Director
Joined: 28 Jul 2011
Posts: 596
Location: United States
Concentration: International Business, General Management
GPA: 3.86
WE: Accounting (Commercial Banking)
Followers: 1
Kudos [?]:
25
[0], given: 16
|
good question..........and an amazing explanation
_________________
+1 Kudos If found helpful..
|
|
|
|
|
|
Intern
Joined: 03 Dec 2011
Posts: 2
Followers: 0
Kudos [?]:
0
[0], given: 0
|
Gurus,
With both valves open, the pool will be filled with water in 48 minutes. The first valve alone would fill the pool in 2 hours. What is the capacity of the pool if every minute the second valve admits 50 cubic meters of water more than the first?
(A) 9000 cubic meters (B) 10500 cubic meters (C) 11750 cubic meters (D) 12000 cubic meters (E) 12500 cubic meters
I tried this question and tried this approach but did not get me the answer? Please could you tell me what I did wrong? W= RT R=w/t c/120 +x =C/48 X( rate at which second valve fills up) .I got stuck here cos i had two many unknowns
|
|
|
|
|
|
Intern
Joined: 20 Dec 2011
Posts: 20
Followers: 0
Kudos [?]:
1
[0], given: 2
|
Jiggyjee1
X is C/120+50 which is given so only 1 unknown.
+1 D
|
|
|
|
|
|
Intern
Joined: 29 Jan 2013
Posts: 1
Followers: 0
Kudos [?]:
0
[0], given: 1
|
We can use plugin approach also here.
From the options given, assume that capacity of tank is = 12000
Tap 1 fills 12000 in 2 hrs. In 1 min = 100 cu/m Tap 2 in 1 min = 100 + 50 = 150.
So in 48 mins = 48(100 (t1) + 150 (t2) = 12000.
|
|
|
|
|
|
Intern
Joined: 23 Jan 2013
Posts: 15
Concentration: Technology, Other
Followers: 0
Kudos [?]:
0
[0], given: 9
|
Consider the time the second pipe takes to fill the tank as 1/x = 1/48 - 1/120 = 1/80 .
therefore x takes 80 mins to fill the pipe . But since each minute pipe B fills in an extra 50 from A using a smart number 100 B takes = 80 * 150 = 12000 would be the capacity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|