Find all School-related info fast with the new School-Specific MBA Forum

It is currently 25 May 2013, 00:14
Customize  |  Hide

Machine A and Machine B can produce 1 widget in 3 hours work

  Question banks Downloads My Bookmarks Reviews  
Author Message
TAGS:
1 KUDOS received
Intern
Intern
Joined: 15 Oct 2009
Posts: 12
Followers: 0

Kudos [?]: 3 [1] , given: 11

Machine A and Machine B can produce 1 widget in 3 hours work [#permalink] New post 03 Apr 2010, 13:22
1
This post received
KUDOS
00:00

Question Stats:

76% (02:27) correct 23% (01:51) wrong based on 5 sessions
Machine A and Machine B can produce 1 widget in 3 hours working together at their respective constant rates. If Machine A's speed were doubled, the two machines could produce 1 widget in 2 hours working together at their respective rates. How many hours does it currently take Machine A to produce 1 widget on its own?

A. 1/2
B. 2
C. 3
D. 5
E. 6
[Reveal] Spoiler: OA

Last edited by changhiskhan on 04 Apr 2010, 09:49, edited 1 time in total.
2 KUDOS received
Manager
Manager
Joined: 20 Mar 2010
Posts: 85
Followers: 2

Kudos [?]: 35 [2] , given: 1

Re: Help with a rate problem. [#permalink] New post 03 Apr 2010, 22:49
2
This post received
KUDOS
If Machine A takes a hours to produce 1 widget it produces 1/a th of widget every hour
Similarly If Machine B takes b hours to produce 1 widget it produces 1/b th of widget every hour

If Machine A and Machine B work together they can produce 1 widget in 3 hrs . So together they can produce 1/3rd of the widget in an hour

Work done by A in 1 hour + Work done by B in 1 hour = Work done by A and B together in 1 hour

1/a + 1/ b =1/3

If A's speed is doubled time it takes to produce 1 widget on it's own will reduce by 1/2
So 2/a + 1/b = 1/2

1/a =1/2-1/3
=1/6

a = 6 hrs. Answer D
_________________

___________________________________
Please give me kudos if you like my post

2 KUDOS received
Senior Manager
Senior Manager
Status: Yeah well whatever.
Joined: 18 Sep 2009
Posts: 351
Location: United States
GMAT 1: 660 Q42 V39
GMAT 2: 730 Q48 V42
GPA: 3.49
WE: Analyst (Insurance)
Followers: 4

Kudos [?]: 40 [2] , given: 17

GMAT Tests User
Re: Help with a rate problem. [#permalink] New post 03 Apr 2010, 22:52
2
This post received
KUDOS
It should be the second D that I think is supposed to be E. I've attached my work in a spreadsheet
Attachments

For GMAT CLUB.xlsx [11.63 KiB]
Downloaded 45 times

To download please login or register as a user


_________________

He that is in me > he that is in the world. - source 1 John 4:4

3 KUDOS received
Senior Manager
Senior Manager
User avatar
Affiliations: SPG
Joined: 15 Nov 2006
Posts: 327
Followers: 9

Kudos [?]: 180 [3] , given: 19

GMAT Tests User
Re: Help with a rate problem. [#permalink] New post 07 Jun 2010, 05:28
3
This post received
KUDOS
changhiskhan wrote:
Machine A and Machine B can produce 1 widget in 3 hours working together at their respective constant rates. If Machine A's speed were doubled, the two machines could produce 1 widget in 2 hours working together at their respective rates. How many hours does it currently take Machine A to produce 1 widget on its own?

a) 1/2
b) 2
c) 3
d) 5
e) 6

Thanks!


the quickest way to solve this problem is to know the following shortcuts ..

If machine A and B work together, then:
1 hour = (A+B)/AB of work done ..... (1)
AB/(A+B) hour = 1 job done ..... (2)


the questions discusses time, so we'll use (1) equation. plug in the values.

(a+b)/ab = 3
(a/2+b)/(a/2*b) = 2 ....... [the speed is doubled so the time is halved]

solve the equations and you'll get a=6 hrs

_________________

press kudos, if you like the explanation, appreciate the effort or encourage people to respond.

Download the Ultimate SC Flashcards

1 KUDOS received
Manager
Manager
Status: Last few days....Have pressed the throttle
Joined: 20 Jun 2010
Posts: 75
WE 1: 6 years - Consulting
Followers: 2

Kudos [?]: 11 [1] , given: 27

Re: Help with a rate problem. [#permalink] New post 17 Aug 2010, 19:16
1
This post received
KUDOS
My way of doing it:
Check all the times given in Question-3 hr and 2 hr - take LCM = 6; SO 6 is the total units of work to be done.
W=6 units
now , a+b = 6units/3hr= 2u/hr -(I) (work done by a and b together in 1 hr)

with double speed of a:

2a+b=6u/2hr= 3u/hr (II)

by I & II a=1 units per hour -> so total time taken to complete the full work is 6*1 (6 units * 1 unit per hour) = 6 hours is the answer.

NOTE: This method helps to solve the problem orally !
_________________

Consider giving Kudos if my post helps in some way

Senior Manager
Senior Manager
User avatar
Status: Time to step up the tempo
Joined: 24 Jun 2010
Posts: 420
Location: Milky way
Schools: ISB, Tepper - CMU, Chicago Booth, LSB
Followers: 6

Kudos [?]: 75 [0], given: 50

GMAT Tests User
Re: Help with a rate problem. [#permalink] New post 17 Aug 2010, 19:30
changhiskhan wrote:
Machine A and Machine B can produce 1 widget in 3 hours working together at their respective constant rates. If Machine A's speed were doubled, the two machines could produce 1 widget in 2 hours working together at their respective rates. How many hours does it currently take Machine A to produce 1 widget on its own?

a) 1/2
b) 2
c) 3
d) 5
e) 6

Thanks!


My attempt:

Given rate at which A & B works at normal pace to complete 1 widget is (1/3).

Hence A's rate = B's rate = half of (1/3).

Hence A's rate is (1/6), so to complete 1 widget A requires 6 hours.

Any thoughts ?????
_________________

:good Support GMAT Club by putting a GMAT Club badge on your blog :thanks

Senior Manager
Senior Manager
Status: Yeah well whatever.
Joined: 18 Sep 2009
Posts: 351
Location: United States
GMAT 1: 660 Q42 V39
GMAT 2: 730 Q48 V42
GPA: 3.49
WE: Analyst (Insurance)
Followers: 4

Kudos [?]: 40 [0], given: 17

GMAT Tests User
Re: Help with a rate problem. [#permalink] New post 17 Aug 2010, 19:34
lol I put it in a spreadsheet... :) what a nerd I am. I forgot that I did that.
_________________

He that is in me > he that is in the world. - source 1 John 4:4

1 KUDOS received
Senior Manager
Senior Manager
Joined: 23 May 2010
Posts: 447
Followers: 5

Kudos [?]: 25 [1] , given: 112

Re: Help with a rate problem. [#permalink] New post 29 Aug 2010, 10:30
1
This post received
KUDOS
ezhilkumarank wrote:
changhiskhan wrote:
Machine A and Machine B can produce 1 widget in 3 hours working together at their respective constant rates. If Machine A's speed were doubled, the two machines could produce 1 widget in 2 hours working together at their respective rates. How many hours does it currently take Machine A to produce 1 widget on its own?

a) 1/2
b) 2
c) 3
d) 5
e) 6

Thanks!


My attempt:

Given rate at which A & B works at normal pace to complete 1 widget is (1/3).

Hence A's rate = B's rate = half of (1/3).

Hence A's rate is (1/6), so to complete 1 widget A requires 6 hours.

Any thoughts ?????

hi
I dont think it wil give u a correct result everytime ..
I dont think 1/6+1/6= 1/3 ( where in A and B rate of work is same )

however these speeds may vary ad yet the totalmay be 1/3....not sure If i have explained u??
1 KUDOS received
Senior Manager
Senior Manager
User avatar
Status: Time to step up the tempo
Joined: 24 Jun 2010
Posts: 420
Location: Milky way
Schools: ISB, Tepper - CMU, Chicago Booth, LSB
Followers: 6

Kudos [?]: 75 [1] , given: 50

GMAT Tests User
Re: Help with a rate problem. [#permalink] New post 29 Aug 2010, 19:36
1
This post received
KUDOS
gauravnagpal wrote:
ezhilkumarank wrote:
changhiskhan wrote:
Machine A and Machine B can produce 1 widget in 3 hours working together at their respective constant rates. If Machine A's speed were doubled, the two machines could produce 1 widget in 2 hours working together at their respective rates. How many hours does it currently take Machine A to produce 1 widget on its own?

a) 1/2
b) 2
c) 3
d) 5
e) 6

Thanks!


My attempt:

Given rate at which A & B works at normal pace to complete 1 widget is (1/3).

Hence A's rate = B's rate = half of (1/3).

Hence A's rate is (1/6), so to complete 1 widget A requires 6 hours.

Any thoughts ?????

hi
I dont think it wil give u a correct result everytime ..
I dont think 1/6+1/6= 1/3 ( where in A and B rate of work is same )

however these speeds may vary ad yet the totalmay be 1/3....not sure If i have explained u??



I understand your point. A's rate could be 1/12 and B's rate be 1/4 but still working together they could end up with a combined rate of 1/3.

I believe the key mistake of my approach is not understanding the key part of the question -- "[highlight]working together at their respective constant rates[/highlight]"

Thanks for pointing this and correcting me. +1 from me.
_________________

:good Support GMAT Club by putting a GMAT Club badge on your blog :thanks

SVP
SVP
User avatar
Joined: 30 Apr 2008
Posts: 1900
Location: Oklahoma City
Schools: Hard Knocks
Followers: 25

Kudos [?]: 341 [0], given: 32

GMAT Tests User
Re: Help with a rate problem. [#permalink] New post 29 Aug 2010, 20:41
I just wanted to point out that answers A, B, and C don't even make sense.
_________________

------------------------------------
J Allen Morris
**I'm pretty sure I'm right, but then again, I'm just a guy with his head up his a$$.

Find out what's new at GMAT Club - latest features and updates

Manager
Manager
Joined: 02 Nov 2009
Posts: 144
Followers: 2

Kudos [?]: 4 [0], given: 97

GMAT Tests User
Re: Help with a rate problem. [#permalink] New post 07 Sep 2012, 21:15
Bunuel

can you please help vvith this problem I could not understand this

please explain
Director
Director
User avatar
Joined: 22 Mar 2011
Posts: 608
WE: Science (Education)
Followers: 43

Kudos [?]: 267 [0], given: 43

GMAT Tests User
Re: Help with a rate problem. [#permalink] New post 08 Sep 2012, 00:14
venmic wrote:
Bunuel

can you please help vvith this problem I could not understand this

please explain


crack700 already gave you the correct answer (6 is correct, so the answer is E and not D).

The two equations are:

\frac{1}{A}+\frac{1}{B}=\frac{1}{3}

\frac{2}{A}+\frac{1}{B}=\frac{1}{2}

Subtract the first equation from the second. You obtain \frac{1}{A}=\frac{1}{6} , so A=6.

Answer E
_________________

PhD in Applied Mathematics
Love GMAT Quant questions and running.

GMAT Club team member
User avatar
Joined: 02 Sep 2009
Posts: 11611
Followers: 1802

Kudos [?]: 9600 [0], given: 829

Re: Help with a rate problem. [#permalink] New post 08 Sep 2012, 02:20
venmic wrote:
Bunuel

can you please help vvith this problem I could not understand this

please explain


Machine A and Machine B can produce 1 widget in 3 hours working together at their respective constant rates. If Machine A's speed were doubled, the two machines could produce 1 widget in 2 hours working together at their respective rates. How many hours does it currently take Machine A to produce 1 widget on its own?

A. 1/2
B. 2
C. 3
D. 5
E. 6

Say the rate of machine A is a widgets per hour and the rate of machine B is b widgets per hour. Since working together they can produce 1 widget in 3 hours, then their combined rate is \frac{1}{3} widgets per hour. So, we have that:

a+b=\frac{1}{3}.

Similarly the second equation would be:

2a+b=\frac{1}{2}.

Subtract the first equation from the second: a=\frac{1}{6} widgets per hour. So, machine A needs 6 hours to produce 1 widget.

Answer: E.
_________________

PLEASE READ AND FOLLOW: 11 Rules for Posting!!!

RESOURCES: [GMAT MATH BOOK]; 1. Triangles; 2. Polygons; 3. Coordinate Geometry; 4. Factorials; 5. Circles; 6. Number Theory

COLLECTION OF QUESTIONS:
PS: 1. Tough and Tricky questions; 2. Hard questions; 3. Hard questions part 2; 4. Standard deviation; 5. Tough Problem Solving Questions With Solutions; 6. Probability and Combinations Questions With Solutions; 7 Tough and tricky exponents and roots questions; 8 12 Easy Pieces (or not?); 9 Bakers' Dozen; 10 Algebra set. NEW!!!

DS: 1. DS tough questions; 2. DS tough questions part 2; 3. DS tough questions part 3; 4. DS Standard deviation; 5. Inequalities; 6. 700+ GMAT Data Sufficiency Questions With Explanations; 7 Tough and tricky exponents and roots questions; 8 The Discreet Charm of the DS ; 9 Devil's Dozen!!!; 10 Number Properties set. NEW!!!


What are GMAT Club Tests?
25 extra-hard Quant Tests

Find out what's new at GMAT Club - latest features and updates

Senior Manager
Senior Manager
User avatar
Joined: 13 Aug 2012
Posts: 468
Followers: 12

Kudos [?]: 75 [0], given: 11

GMAT ToolKit User GMAT Tests User
Re: Machine A and Machine B can produce 1 widget in 3 hours work [#permalink] New post 15 Nov 2012, 05:45
\frac{1}{A}+\frac{1}{B}=\frac{1}{3}
\frac{2}{A}+\frac{1}{B}=\frac{1}{2}

Combine the two eq:

\frac{2}{A}-\frac{1}{A}=\frac{1}{2}-\frac{1}{3}
\frac{1}{A}=\frac{1}{6}

t=6
Re: Machine A and Machine B can produce 1 widget in 3 hours work   [#permalink] 15 Nov 2012, 05:45
    Similar topics Author Replies Last post
Similar
Topics:
New posts Machine A & B working together can produce X rivets in 4 day92 4 11 Oct 2005, 13:52
New posts Machine A and Machine B can produce 1 widget in 3 hours above720 3 18 May 2007, 17:44
New posts EXPERTS_POSTS_IN_THIS_TOPIC Machine A can process 6000 envelopes in 3 hours. Machines B shash 5 25 Nov 2010, 08:25
New posts 1 EXPERTS_POSTS_IN_THIS_TOPIC Machine A working alone can complete a job in 3 1/2 hours Lolaergasheva 2 08 Mar 2011, 02:23
New posts 4 Machine A can fill an order of widgets in a hours. Machine B nshang 2 17 Sep 2011, 02:36
Display posts from previous: Sort by

Machine A and Machine B can produce 1 widget in 3 hours work

  Question banks Downloads My Bookmarks Reviews  


GMAT Club MBA Forum Home| About| Privacy Policy| Terms and Conditions| GMAT Club Rules| Contact| Sitemap

Powered by phpBB © phpBB Group and phpBB SEO

Kindly note that the GMAT® test is a registered trademark of the Graduate Management Admission Council®, and this site has neither been reviewed nor endorsed by GMAC®.