Find all School-related info fast with the new School-Specific MBA Forum

It is currently 19 May 2013, 15:15
Customize  |  Hide

Micheal and Adam can do together a piece of work in 20 days.

  Question banks Downloads My Bookmarks Reviews  
Author Message
TAGS:
Director
Director
Joined: 05 Jan 2008
Posts: 715
Followers: 2

Kudos [?]: 69 [0], given: 0

GMAT Tests User
Micheal and Adam can do together a piece of work in 20 days. [#permalink] New post 11 Mar 2008, 04:47
Micheal and Adam can do together a piece of work in 20 days. After they have worked together for 12 days Micheal stops and Adam completes the remaining work in 10 days. In how many days Micheal complete the work separately.

80 days

100 days

120 days

110 days

90 days
_________________

Persistence+Patience+Persistence+Patience=G...O...A...L

Director
Director
Joined: 10 Sep 2007
Posts: 958
Followers: 5

Kudos [?]: 151 [0], given: 0

GMAT Tests User
Re: Time & Work-2 [#permalink] New post 11 Mar 2008, 07:06
Suppose rate of work for per day Mike = M & Rate of work per day for Adam = A
Together in a Day they can finish = A + M units
Total Work Done in 20 Days = 20(A+M)
Total Work Done in 12 Days = 12(A+M)
Work Done by Adam in 10 Days = 10A

Since total work is same we can say that 20(A+M) = 12(A+M) + 10A => 8M = 2A => A = 4M
So total work done by them together in 20 Days = 20(4M+M) = 100M
Since Mike does M unit of work per day, it will take him 100 Days to finish up the work.

Answer B.
1 KUDOS received
Director
Director
User avatar
Status: GMAT Learner
Joined: 14 Jul 2010
Posts: 672
Followers: 21

Kudos [?]: 108 [1] , given: 31

GMAT Tests User
Re: Time & Work-2 [#permalink] New post 30 Nov 2011, 21:49
1
This post received
KUDOS
Rate of both = 1/20
Together they do = 1/20*12 = 3/5

Left work = 1 - 3/5 = 2/5

Adam completes 2/5 work in 10 day
so he took 10*5/2 = 25 days to complete the left work alone.
Thus the rate of adam is 1/25

Rate of Micheal = 1/20 - 1/25 = 1/100
Thus micheal takes 100 days to complete the whole work.
ans. B.
_________________

I am student of everyone-baten
Collections:-
PSof OG solved by GC members: http://gmatclub.com/forum/collection-ps-with-solution-from-gmatclub-110005.html
DS of OG solved by GC members: http://gmatclub.com/forum/collection-ds-with-solution-from-gmatclub-110004.html
100 GMAT PREP Quantitative collection http://gmatclub.com/forum/gmat-prep-problem-collections-114358.html
Collections of work/rate problems with solutions http://gmatclub.com/forum/collections-of-work-rate-problem-with-solutions-118919.html
Mixture problems in a file with best solutions: http://gmatclub.com/forum/mixture-problems-with-best-and-easy-solutions-all-together-124644.html

1 KUDOS received
Director
Director
User avatar
Status: GMAT Learner
Joined: 14 Jul 2010
Posts: 672
Followers: 21

Kudos [?]: 108 [1] , given: 31

GMAT Tests User
Re: Time & Work-2 [#permalink] New post 18 Dec 2011, 10:24
1
This post received
KUDOS
I got another way of the same problem
1/20*12+10x=1 [Rate of Adam is x]
x = 1/25
so, rate of Micheal =1/20-1/25 = 1/100

So Micheal take 100 days
Ans. B
_________________

I am student of everyone-baten
Collections:-
PSof OG solved by GC members: http://gmatclub.com/forum/collection-ps-with-solution-from-gmatclub-110005.html
DS of OG solved by GC members: http://gmatclub.com/forum/collection-ds-with-solution-from-gmatclub-110004.html
100 GMAT PREP Quantitative collection http://gmatclub.com/forum/gmat-prep-problem-collections-114358.html
Collections of work/rate problems with solutions http://gmatclub.com/forum/collections-of-work-rate-problem-with-solutions-118919.html
Mixture problems in a file with best solutions: http://gmatclub.com/forum/mixture-problems-with-best-and-easy-solutions-all-together-124644.html

Re: Time & Work-2   [#permalink] 18 Dec 2011, 10:24
    Similar topics Author Replies Last post
Similar
Topics:
New posts If 12 men and 16 women can do a piece of work in 5 days and smcgrath12 4 17 Aug 2004, 15:19
New posts Working together, A and B can do a job in 6 days. B and C GMATT73 6 29 Oct 2005, 10:21
New posts A and B together can do a piece of work in 72/5 days ; B and jyotsnasarabu 1 08 Oct 2006, 04:37
Popular new posts A and B together can do a peace of work in 12 days,which B sravan_m444 13 05 Feb 2007, 11:30
Popular new posts 2 EXPERTS_POSTS_IN_THIS_TOPIC Matt and Peter can do together a piece of work in 20 days prasannar 12 11 Mar 2008, 03:56
Display posts from previous: Sort by

Micheal and Adam can do together a piece of work in 20 days.

  Question banks Downloads My Bookmarks Reviews  


GMAT Club MBA Forum Home| About| Privacy Policy| Terms and Conditions| GMAT Club Rules| Contact| Sitemap

Powered by phpBB © phpBB Group and phpBB SEO

Kindly note that the GMAT® test is a registered trademark of the Graduate Management Admission Council®, and this site has neither been reviewed nor endorsed by GMAC®.