Last visit was: 23 Apr 2024, 19:27 It is currently 23 Apr 2024, 19:27

Close
GMAT Club Daily Prep
Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Close
Request Expert Reply
Confirm Cancel
GMAT Instructor
Joined: 04 Jul 2006
Posts: 960
Own Kudos [?]: 693 [0]
Given Kudos: 6
Location: Madrid
 Q51  V50
Send PM
User avatar
Intern
Intern
Joined: 24 Aug 2006
Posts: 17
Own Kudos [?]: [0]
Given Kudos: 0
Send PM
avatar
Manager
Manager
Joined: 06 Jul 2004
Posts: 164
Own Kudos [?]: 1004 [0]
Given Kudos: 0
Location: united states
Send PM
avatar
Manager
Manager
Joined: 06 Jul 2004
Posts: 164
Own Kudos [?]: 1004 [0]
Given Kudos: 0
Location: united states
Send PM
Re: A shirt factory has a six-stage manufacturing process. Each [#permalink]
I'm sorry, i messed up.

If novices work on the shirt in all stages, it would take 190 minutes and if experts work on the shirt in all stages, it would take 98 minutes. We can see that the stage-3 is very much critical. If we use a novice in stage-3, there is no way we can complete the shirt in less than or equal to 120 minutes. So, we have

XXEXXX where X denotes either novice or expert. Now, besides the third stage, we need the experts in three more stages. So, the idea is that we must have the expert take care of the stage-3, and also take care of 3 or more stages of the remaining 5. The required probability is

(5C3 + 5C4 + 5C5)/2exp(6) = 0.25
avatar
Manager
Manager
Joined: 06 Jul 2004
Posts: 164
Own Kudos [?]: 1004 [0]
Given Kudos: 0
Location: united states
Send PM
Re: A shirt factory has a six-stage manufacturing process. Each [#permalink]
Kevin, i had miscalculated the number of minutes. I was under the impression that it will boil down to only two stages. The new answer/explanation has already been posted.
User avatar
Intern
Intern
Joined: 09 Aug 2005
Posts: 41
Own Kudos [?]: 2 [0]
Given Kudos: 0
Send PM
Re: A shirt factory has a six-stage manufacturing process. Each [#permalink]
This is a tough one.... how much time would you allocate to this?? Took me at least 5 mins to even think through!!! And I'm still not at the answer - this is a partial answer looking for help (I suck at probability and trying to work at it)

Here is what I did:

Total cases are of course 2 ^ 6 = 64.

Min time calculation (all experts) = 99 (best case scenario)
Time diff calculation at each stage = 15, 7, 30, 20, 10, 10.

Now starting from the minimum and seeing which ones have to be done by experts or can be left to the others... to reach a max of 120 (2 hrs).

The first stage, second and last two can be done by expert or non expert (as long as the others are all done by experts). Also 2 and 5 or 2 and 6 can be done togehter by non experts. Any other cases and we wont keep to the time limit.

At this point I'm at a loss how to convert these cases into numbers! But will keep plugging away and come back with a solution if I can.

MG
User avatar
Intern
Intern
Joined: 09 Aug 2005
Posts: 41
Own Kudos [?]: 2 [0]
Given Kudos: 0
Send PM
Re: A shirt factory has a six-stage manufacturing process. Each [#permalink]
Options are:

1. EEEEEE
2. NEEEEE
3. ENEEEE
4. EEEENE
5. EEEEEN
6. ENEENE
7. ENEEEN

Thats it, pretty much.
7/64 = 0.10

Too low for the answers - back to the drawing board, take 3.

MG
User avatar
Intern
Intern
Joined: 09 Aug 2005
Posts: 41
Own Kudos [?]: 2 [0]
Given Kudos: 0
Send PM
Re: A shirt factory has a six-stage manufacturing process. Each [#permalink]
The summing up was wrong... the expert total actually comes to 97 minutes, leaving us a leeway of 23 minutes and not 21 like I had assumed (infact I somehow managed to assume 19 mins... but this time I have it!!!)

So we can afford anything that will add under 23 mins to the process.
This will add the following cases:

8. NNEEEE (add 22 mins)
9. EEENEE (add 20 mins)
10.EEEENN (add 20 mins)

Thats it!
so its 10/64 = 0.16.

Is that it??

MG
User avatar
Intern
Intern
Joined: 09 Aug 2005
Posts: 41
Own Kudos [?]: 2 [0]
Given Kudos: 0
Send PM
Re: A shirt factory has a six-stage manufacturing process. Each [#permalink]
I just wanted to clarify since previous posts were a bit of a working mess :D

Total cases = 64.

Number of cases under 120 mins is what we need to find.

Cases where all Experts work on it = 15+8+25+5+25+20 = 97 mins. This is the minimum time it will take in the case EEEEEE.

We now have a leeway of 23 minutes for novices to work on the system (120-97)

Novices working on the system add the following minutes at each stage.
15, 7, 30, 20, 10, 10.

So any combination that allows us to add 23 minutes at most will satisfy the condition.

EEEEEE (0 mins), NEEEEE(15 mins), ENEEEE(7mins), EEENEE(20mins), EEEENE(10 mins), EEEEEN (10 mins) all work.
Other than this, NNEEEE(22 mins), ENEENE (17 mins), ENEEEN (17 mins), and EEEENN (20 mins) also fit.

Total cases - 10
10/64 = 1.56, approx 1.6

MG
User avatar
Director
Director
Joined: 02 Jun 2006
Posts: 664
Own Kudos [?]: 213 [0]
Given Kudos: 0
Send PM
Re: A shirt factory has a six-stage manufacturing process. Each [#permalink]
Tough one... thought for a while.

Max processing time = 120 mins.

Note the following deltas between the expert timing and novice timing (calculated as expert timing -novice timing) :

d1 = +15, d2 = +7, d3= +30, d4 = +20, d5= +10, d6= +10

Sum of times of all experts = 98
Excess time = 120-98 = 22 mins.

We increase the time of processing up to a max of 22 mins.

P = {e1, e2, e3, e4, e5, e6} .............. (1)

Start with all experts, and look at the delta's to replace the experts with the novices, to increase the processing time, upto a max of 22 mins.

d1 = +15, d2 = +7, d3= +30, d4 = +20, d5= +10, d6= +10

a. {n1, e2-e6} (n1=>e1 i.e. n1 replaced e1)ExcessTime: 7mins
b. {n1, n2, e3-e6} (n1=>e1, n2=> e2) ET: 0mins
c. {e1-e3, n4, e5, e6} {n4=>e4} ET: 2 mins
d. {e1, n2, e3, e4, n5, e6} {n2=>e2, n5=> e5} ET: 5 mins
e. {e1, n2, e3, e4, e5, n6} {n2=> e2, n6=>e6} ET: 5 mins
f. {e1-e4, n5, n6} {n5=>e5, n6=>e6} ET: 2 mins
g. {e1, n2, e3-e6} {n2=>e2} ET: 15mins
h. {e1-e4, n5, e6} {n5=>e5} ET: 12mins
i. {e1-e5, n6} {n6=> e6} ET : 12 mins
j. {e1-e6} ET: 22 mins <<< Thanks to Mikki!! >>>>


Total number of ways: 10 for processing in atmost 120mins

Possible # of ways = 64

Prob = 10/64= 0.16

Answer: A

Originally posted by haas_mba07 on 29 Aug 2006, 11:22.
Last edited by haas_mba07 on 29 Aug 2006, 11:29, edited 1 time in total.
User avatar
Intern
Intern
Joined: 09 Aug 2005
Posts: 41
Own Kudos [?]: 2 [0]
Given Kudos: 0
Send PM
Re: A shirt factory has a six-stage manufacturing process. Each [#permalink]
Thats almost exactly how I did it... think you may have missed out the case in which all stages are completed by experts :)

Leads to 10 cases.

Cheers
MG
User avatar
Director
Director
Joined: 02 Jun 2006
Posts: 664
Own Kudos [?]: 213 [0]
Given Kudos: 0
Send PM
Re: A shirt factory has a six-stage manufacturing process. Each [#permalink]
Aha!!! :P

Thanks mikki!!


mikki0000 wrote:
Thats almost exactly how I did it... think you may have missed out the case in which all stages are completed by experts :)

Leads to 10 cases.

Cheers
MG
GMAT Instructor
Joined: 04 Jul 2006
Posts: 960
Own Kudos [?]: 693 [0]
Given Kudos: 6
Location: Madrid
 Q51  V50
Send PM
Re: A shirt factory has a six-stage manufacturing process. Each [#permalink]
Good work OA=0.16 I was beginning to think that nobody liked this question!



Archived Topic
Hi there,
This topic has been closed and archived due to inactivity or violation of community quality standards. No more replies are possible here.
Where to now? Join ongoing discussions on thousands of quality questions in our Problem Solving (PS) Forum
Still interested in this question? Check out the "Best Topics" block above for a better discussion on this exact question, as well as several more related questions.
Thank you for understanding, and happy exploring!
GMAT Club Bot
Re: A shirt factory has a six-stage manufacturing process. Each [#permalink]
Moderators:
Math Expert
92883 posts
Senior Moderator - Masters Forum
3137 posts

Powered by phpBB © phpBB Group | Emoji artwork provided by EmojiOne