|
Author |
Message |
|
TAGS:
|
|
|
Director
Joined: 01 Apr 2008
Posts: 921
Followers: 8
Kudos [?]:
123
[0], given: 18
|
Question Stats:
53% (02:46) correct
46% (01:31) wrong based on 2 sessions
A pool can be filled in 4 hours and drained in 5 hours. The valve that fills the pool was opened at 1:00 pm and some time later the drain that empties the pool was also opened. If the pool was filled by 11:00 pm and not earlier, when was the drain opened? *at 2:00 pm * at 2:30 pm * at 3:00 pm * at 3:30 pm * at 4:00 pm Don't have the OA  I am interested in the approach. I did: 10/4 - x/5 = 1/10 ( x = number of hours drain pipe is opened ). But I cant find the answer.
|
|
|
|
|
|
|
GMAT Instructor
Joined: 24 Jun 2008
Posts: 973
Location: Toronto
Followers: 167
Kudos [?]:
443
[1] , given: 3
|
1
This post received KUDOS
Economist wrote: A pool can be filled in 4 hours and drained in 5 hours. The valve that fills the pool was opened at 1:00 pm and some time later the drain that empties the pool was also opened. If the pool was filled by 11:00 pm and not earlier, when was the drain opened? *at 2:00 pm * at 2:30 pm * at 3:00 pm * at 3:30 pm * at 4:00 pm Don't have the OA  I am interested in the approach. I did: 10/4 - x/5 = 1/10 ( x = number of hours drain pipe is opened ). But I cant find the answer. Imagine both the drain and the valve are on at the same time. You can use a formula here; I just convert each to the same amount of time (20 hours): valve will fill 5 pools in 20 hours drain will empty 4 pools in 20 hours valve+drain will fill 1 pool in 20 hours So we really have two 'workers' here; the valve, which fills one pool in 4 hours, is on for the first t hours, and the valve+drain combo, which fills one pool every 20 hours, which was on for the remaining 10 - t hours. While the valve was on, t/4 of the pool was filled, and while the valve+drain combo were on, (10-t)/20 of the pool was filled. Adding these, we must get 1 pool: t/4 + (10-t)/20 = 1 5t + 10 - t = 20 4t = 10 t = 2.5 So the drain was turned on 2.5 hours after 1pm, or at 3:30pm.
_________________
Nov 2011: After years of development, I am now making my advanced Quant books and high-level problem sets available for sale. Contact me at ianstewartgmat at gmail.com for details.
Private GMAT Tutor based in Toronto
|
|
|
|
|
|
Director
Joined: 01 Apr 2008
Posts: 921
Followers: 8
Kudos [?]:
123
[0], given: 18
|
Thanks Ian. Here you added the work in the last equation. Can we solve the same problem by adding rates instead? IanStewart wrote: Economist wrote: A pool can be filled in 4 hours and drained in 5 hours. The valve that fills the pool was opened at 1:00 pm and some time later the drain that empties the pool was also opened. If the pool was filled by 11:00 pm and not earlier, when was the drain opened? *at 2:00 pm * at 2:30 pm * at 3:00 pm * at 3:30 pm * at 4:00 pm Don't have the OA  I am interested in the approach. I did: 10/4 - x/5 = 1/10 ( x = number of hours drain pipe is opened ). But I cant find the answer. Imagine both the drain and the valve are on at the same time. You can use a formula here; I just convert each to the same amount of time (20 hours): valve will fill 5 pools in 20 hours drain will empty 4 pools in 20 hours valve+drain will fill 1 pool in 20 hours So we really have two 'workers' here; the valve, which fills one pool in 4 hours, is on for the first t hours, and the valve+drain combo, which fills one pool every 20 hours, which was on for the remaining 10 - t hours. While the valve was on, t/4 of the pool was filled, and while the valve+drain combo were on, (10-t)/20 of the pool was filled. Adding these, we must get 1 pool: t/4 + (10-t)/20 = 1 5t + 10 - t = 20 4t = 10 t = 2.5 So the drain was turned on 2.5 hours after 1pm, or at 3:30pm.
|
|
|
|
|
|
Senior Manager
Joined: 01 Mar 2009
Posts: 375
Location: PDX
Followers: 5
Kudos [?]:
53
[0], given: 24
|
A different approach : So in one hour V1 will fill 1/4th of the pool V2 will empty 1/5th of the pool. If the valves were opened at the same time: 1/20th of the pool will be full in 1 hour ( Difference of 1/4 and 1/5 ) So if both the valves were opened at 1 PM it would take 20 hours to fill the pool. That's not the case. Work from the answer choices. If V2 was opened at 3 PM. In 2 hours V1 would have filled : 1/2 of the tank. To fill the remaining half it would take 10 hours. 3 + 10 = 13. So the time should be after 3. If V2 was opened at 3.30 : in 2.5 hours, V1 would have filled 1/4*2.5 : 5/8th of the tank. From 3.30 to 11 : V1 and V2 have 7.5 hours to fill the remaining 3/8th of the tank. Operating together : 1/20 can be filled in 1 hour 3/8 can be filled in 3/8 *20 = 7.5 hours. Bingo  -pradeep
_________________
In the land of the night, the chariot of the sun is drawn by the grateful dead
|
|
|
|
|
|
GMAT Instructor
Joined: 24 Jun 2008
Posts: 973
Location: Toronto
Followers: 167
Kudos [?]:
443
[4] , given: 3
|
4
This post received KUDOS
I sent this via PM to Economist, but thought it might be useful to others: When you have workers working in sequence, you'd want to add the work done by each. It's when you have workers working simultaneously that you'd want to add their rates. I can illustrate with three different questions, all based on the same initial setup: Say, worker A can do 1 job in 10 hours, and worker B can do 1 job in 15 hours. a) If they work together for 30 hours, how many jobs will they complete? Here, you'd add their rates to determine how many jobs they can finish together. You should find they can complete one job every six hours working together, so in 30 hours they'd finish five jobs. b) If worker A works alone for 15 hours, and then stops, and then worker B works alone for 15 hours, how many jobs will they complete in the 30 hours? Here, you don't want to add their rates, because they never work simultaneously. Instead you'd want to add together the work each does during the 15 hours each works - in 15 hours, A will do 1.5 jobs, and in 15 hours, B will do 1 job, so combined they'll complete 2.5 jobs. c) If worker A works alone for 15 hours, and then B and A work together for 15 hours, how many jobs will they complete in the 30 hours? This question most resembles the one from the post above. A will complete 1.5 jobs in the first 15 hours. For the remaining 15 hours, A+B work together. We need to work out their combined rate, and we find they will complete 1 job every 6 hours, and will therefore complete 2.5 jobs in 15 hours. In total, over the 30 hours, 4 jobs will therefore be completed. _______________________ There are other approaches to the problems above, of course, but I've confined the discussion to work/rate principles to illustrate the differences between each question setup.
_________________
Nov 2011: After years of development, I am now making my advanced Quant books and high-level problem sets available for sale. Contact me at ianstewartgmat at gmail.com for details.
Private GMAT Tutor based in Toronto
|
|
|
|
|
|
Senior Manager
Joined: 01 Mar 2009
Posts: 375
Location: PDX
Followers: 5
Kudos [?]:
53
[0], given: 24
|
IanStewart wrote: I sent this via PM to Economist, but thought it might be useful to others:
When you have workers working in sequence, you'd want to add the work done by each. It's when you have workers working simultaneously that you'd want to add their rates.
I can illustrate with three different questions, all based on the same initial setup:
Say, worker A can do 1 job in 10 hours, and worker B can do 1 job in 15 hours.
a) If they work together for 30 hours, how many jobs will they complete?
Here, you'd add their rates to determine how many jobs they can finish together. You should find they can complete one job every six hours working together, so in 30 hours they'd finish five jobs.
b) If worker A works alone for 15 hours, and then stops, and then worker B works alone for 15 hours, how many jobs will they complete in the 30 hours?
Here, you don't want to add their rates, because they never work simultaneously. Instead you'd want to add together the work each does during the 15 hours each works - in 15 hours, A will do 1.5 jobs, and in 15 hours, B will do 1 job, so combined they'll complete 2.5 jobs.
c) If worker A works alone for 15 hours, and then B and A work together for 15 hours, how many jobs will they complete in the 30 hours?
This question most resembles the one from the post above. A will complete 1.5 jobs in the first 15 hours. For the remaining 15 hours, A+B work together. We need to work out their combined rate, and we find they will complete 1 job every 6 hours, and will therefore complete 2.5 jobs in 15 hours. In total, over the 30 hours, 4 jobs will therefore be completed.
_______________________
There are other approaches to the problems above, of course, but I've confined the discussion to work/rate principles to illustrate the differences between each question setup. Great explanation !!! Thanks Ian -pradeep
_________________
In the land of the night, the chariot of the sun is drawn by the grateful dead
|
|
|
|
|
|
Manager
Joined: 13 Aug 2009
Posts: 208
Followers: 3
Kudos [?]:
60
[0], given: 16
|
A pool can be filled in 4 hours and drained in 5 hours. The valve that fills the pool was opened at 1:00 pm and some time later the drain that empties the pool was also opened. If the pool was filled by 11:00 pm and not earlier, when was the drain opened? *at 2:00 pm * at 2:30 pm * at 3:00 pm * at 3:30 pm * at 4:00 pm
Here is how I solved the problem:
let A = the number of hours the filling valve is open by itself let B = the number of hours the filling and draining valve are open together
Filling rate: 1 pool / 4 hrs Draining rate: 1 pool / 5 hrs
therefore,
(1 pool / 4 hrs)*(A+B hrs) - (1 pool / 5 hrs)*(B hrs) = 1 pool
and we know that the pool was filled in 10 hours:
A + B = 10
so now we have two equations and two unknowns; solve for A:
(A+B)/4 - B/5 = 1 5*(A+B) - 4*5 = 20 5*A + B = 20
substitute B for 10-A:
5*A + 10 - A = 20 A = 2.5
So the pool was filled 2 and half hours after 1 PM or 3:30 PM
ANSWER: E. 3:30 PM
|
|
|
|
|
|
Manager
Joined: 25 Feb 2009
Posts: 57
Followers: 1
Kudos [?]:
7
[0], given: 0
|
My solution is similar to h2polo's:
Filling rate : ¼ Draining rate: 1/5 From 1.00 pm to 11 pm → 10 hours Let’s say X is the hours that Draining valve works → 10/4 – 1/5 * X = 1 (pool is filled) → X = 7,5 → The filling valve works 10-7,5 = 2,5 hours before the draining valve is started 1.00 pm + 2.5 = 3.30 pm → D
Cheers, Cheryl
|
|
|
|
|
|
Manager
Joined: 15 Apr 2010
Posts: 174
Followers: 4
Kudos [?]:
19
[0], given: 3
|
We know that Rate x Time = Work done
Here, Ri = Rate of the inlet valve Ro = Rate of the outlet valve Ti = Time for which the inlet valve was open To = Time for which the outlet valve was open x = Time after which the outlet valve is open
The time taken for pool to fill to capacity is 10 hours.
RiTi - RoTo = 1 (1/4)(10) - (1/5)(10-x) = 1
Solving the above equation gives x = 2.5 hours
Hence the outlet valve was opened 2.5 hours after 1pm i.e., 3:30pm
|
|
|
|
|
|
Manager
Joined: 14 Apr 2010
Posts: 241
Followers: 2
Kudos [?]:
7
[0], given: 1
|
Ok.....why is it that i can't understand any of the explanations??????? Guys, i am really weak with these kind of work problems. Would anyone care to provide a solution to this problem once again??? please
|
|
|
|
|
|
Intern
Affiliations: NYSSA
Joined: 07 Jun 2010
Posts: 35
Location: New York City
Schools: Wharton, Stanford, MIT, NYU, Columbia, LBS, Berkeley (MFE program)
WE 1: Senior Associate - Thomson Reuters
WE 2: Analyst - TIAA CREF
Followers: 0
Kudos [?]:
3
[1] , given: 2
|
1
This post received KUDOS
bibha wrote: Ok.....why is it that i can't understand any of the explanations??????? Guys, i am really weak with these kind of work problems. Would anyone care to provide a solution to this problem once again??? please  You can fill 1 pool in 4 hours. However we have a drain that drains at a rate of 1 pool in 5 hours. Lets set up a basic rate equation. we know the rate of the pump is 1pool/4hours. We also know this pump operated from 1PM to 11PM, thus 10 hours. Thus the pump filled 1pool/4hours*10hours or 10/4pools. But the drain drained the pool at 1pool/5hours * t hours. t is our unknown value and is the number of hours the drain was on. The total work was one pool, or represented as 10/4+1/5t = 1. Now we just solve for t. t=15/2 = 7.5 hours or the number of hours the drain was on. Thus we have to make one final step of 10-7.5hrs = 2.5hrs, which is the number of hours the drain was turned on after the pump. 1PM +2.5hrs = 3:30PM D
|
|
|
|
|
|
Manager
Joined: 14 Apr 2010
Posts: 241
Followers: 2
Kudos [?]:
7
[0], given: 1
|
oh WOW!!! great . thanks for the explanation
|
|
|
|
|
|
Director
Status: GMAT Learner
Joined: 14 Jul 2010
Posts: 672
Followers: 21
Kudos [?]:
108
[3] , given: 31
|
3
This post received KUDOS
Filled rate= 1/4, Drained rate = 1/5 Total hours took = 10 [Given] Let drained valve work for x hours so, (1/4)(10) - (1/5)(10-x) = 1 x = 2.5 hours Thus, the outlet valve was opened 2.5 hours after 1pm i.e., 3:30pm Ans. D
_________________
I am student of everyone-baten Collections:- PSof OG solved by GC members: http://gmatclub.com/forum/collection-ps-with-solution-from-gmatclub-110005.html DS of OG solved by GC members: http://gmatclub.com/forum/collection-ds-with-solution-from-gmatclub-110004.html 100 GMAT PREP Quantitative collection http://gmatclub.com/forum/gmat-prep-problem-collections-114358.html Collections of work/rate problems with solutions http://gmatclub.com/forum/collections-of-work-rate-problem-with-solutions-118919.html Mixture problems in a file with best solutions: http://gmatclub.com/forum/mixture-problems-with-best-and-easy-solutions-all-together-124644.html
|
|
|
|
|
|
Senior Manager
Joined: 12 Oct 2011
Posts: 283
Followers: 0
Kudos [?]:
13
[0], given: 110
|
D is the answer. Nice problem. Thanks a ton. I got the solution but it took me about 2.5 minutes to get to the correct answer. Is that reasonable for such problems or is it a little over the limit?
_________________
Consider KUDOS if you feel the effort's worth it
|
|
|
|
|
|
GMAT Instructor
Joined: 24 Jun 2008
Posts: 973
Location: Toronto
Followers: 167
Kudos [?]:
443
[0], given: 3
|
siddharthmuzumdar wrote: D is the answer. Nice problem. Thanks a ton. I got the solution but it took me about 2.5 minutes to get to the correct answer. Is that reasonable for such problems or is it a little over the limit? This is not an official question, so you shouldn't be so concerned about solving it in under 2 minutes. I think it is a bit of a lengthy problem anyway. On the real test, you need to average 2 minutes per question - if you can solve some questions in 1.5 minutes, then it's okay to spend 2.5 minutes sometimes. Normally I wouldn't recommend ever spending more than 3 minutes on a question (and if you do, you better be sure you'll get the right answer) unless you know you have extra time.
_________________
Nov 2011: After years of development, I am now making my advanced Quant books and high-level problem sets available for sale. Contact me at ianstewartgmat at gmail.com for details.
Private GMAT Tutor based in Toronto
|
|
|
|
|
|
Senior Manager
Joined: 12 Oct 2011
Posts: 283
Followers: 0
Kudos [?]:
13
[0], given: 110
|
IanStewart wrote: siddharthmuzumdar wrote: D is the answer. Nice problem. Thanks a ton. I got the solution but it took me about 2.5 minutes to get to the correct answer. Is that reasonable for such problems or is it a little over the limit? This is not an official question, so you shouldn't be so concerned about solving it in under 2 minutes. I think it is a bit of a lengthy problem anyway. On the real test, you need to average 2 minutes per question - if you can solve some questions in 1.5 minutes, then it's okay to spend 2.5 minutes sometimes. Normally I wouldn't recommend ever spending more than 3 minutes on a question (and if you do, you better be sure you'll get the right answer) unless you know you have extra time. Thank you for the advice Sir. Will keep a tab on the easier ones and try to finish them off (correctly) in as less as time as possible so that I have sufficient time for the tougher problems.
|
|
|
|
|
|
Manager
Joined: 26 Apr 2011
Posts: 232
Followers: 0
Kudos [?]:
26
[0], given: 12
|
after x hrs B was opened so work done by A = 10 hrs and work done by B = 10-X hrs so as per question 10/4 - (10-x)/5 =1 gives x=2.5
so time of opening B = 1+2.5 =3.5 or u may say 3.30 PM
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|