Find all School-related info fast with the new School-Specific MBA Forum

It is currently 19 May 2013, 10:22
Customize  |  Hide

RT=W Report (m07q03)

  Question banks Downloads My Bookmarks Reviews  
Author Message
CEO
CEO
User avatar
Joined: 21 Jan 2007
Posts: 2797
Location: New York City
Followers: 5

Kudos [?]: 132 [0], given: 4

GMAT Tests User
RT=W Report (m07q03) [#permalink] New post 14 Nov 2007, 11:16
00:00

Question Stats:

58% (03:48) correct 41% (01:43) wrong based on 0 sessions
Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done?

(A) 41.4
(B) 34.1
(C) 13.4
(D) 12.4
(E) 10.8

[Reveal] Spoiler: OA
A

Source: GMAT Club Tests - hardest GMAT questions
[Reveal] Spoiler: OA
Kaplan Promo CodeKnewton GMAT Discount CodesGMAT Pill GMAT Discount Codes
2 KUDOS received
Manager
Manager
Joined: 25 Jul 2007
Posts: 108
Followers: 1

Kudos [?]: 8 [2] , given: 0

 [#permalink] New post 14 Nov 2007, 11:28
2
This post received
KUDOS
Let time taken by 'j' to type be 'j'.

We know that 1/m + 1/j = 1/12.5

i.e. 1/30 + 1/j = 1/12.5

i.e. (30+j)/30j = 1/12.5

i.e. 375 = 30j-12.5j=17.5j

i.e. j = 375/17.5=150/7

Let time taken by 'm' to edit be 'x' and that by 'j' be 'y'.

We know that 1/x + 1/y = 1/7.5

i.e. 1/x + 1/12 = 1/7.5

i.e. (12+x)/12x = 1/7.5

i.e. 90 = 12x-7.5x=4.5x

i.e. x = 90/4.5 = 20


Therefore answer = 150/7+20 = 41.4
Manager
Manager
Joined: 29 Nov 2009
Posts: 109
Location: United States
Followers: 1

Kudos [?]: 21 [0], given: 5

Re: RT=W Report (m07q03) [#permalink] New post 09 Dec 2009, 07:16
Right, and once you solve for either 150/7 or 20, you can immediately eliminate all possibilities other than A and B. This would give you a 50% guess for half the work if you're low on time.
Intern
Intern
Joined: 23 Nov 2009
Posts: 1
Followers: 0

Kudos [?]: 0 [0], given: 1

Re: RT=W Report (m07q03) [#permalink] New post 09 Dec 2009, 12:24
Hi
I think the question should be re-written as a "which is the closest" or "approximately how long" question since 150/7 doesn't exactly equal 21.4... It's close to it: 21.42857...
There would never be an approximate right answer on the GMAT on a question which asks for a specific quantity
Manager
Manager
Joined: 23 Oct 2010
Posts: 93
Location: India
Followers: 2

Kudos [?]: 15 [0], given: 6

Re: RT=W Report (m07q03) [#permalink] New post 16 Dec 2010, 06:02
A.

This is calculation intensive. What would be a shorter solution?
I solved like this:
1/30 + 1/x = 1/12.5 => x = 21.4
1/12+1/y = 1/7.5 => y = 20

Total = 21.4 + 20 = 41.4
3 KUDOS received
Manager
Manager
Joined: 23 Oct 2010
Posts: 93
Location: India
Followers: 2

Kudos [?]: 15 [3] , given: 6

Re: RT=W Report (m07q03) [#permalink] New post 16 Dec 2010, 06:11
3
This post received
KUDOS
bmwhype2 wrote:
Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done?

* 41.4
* 34.1
* 13.4
* 12.4
* 10.8

[Reveal] Spoiler: OA
A

Source: GMAT Club Tests - hardest GMAT questions


Well, this is how I figured a shorter solution:

M takes 30 hrs, two cons of equal cap take 12.5 *2 = 25 hrs each. Hence J will take less than 25 hrs (how much less --> guess above 20 at least?)
J takes 12 hrs, two cons of equal cap take 7.5 * 2 = 15 hrs each. Hence M will take more than 15 hrs (how much greater --> guess around 18)
Add them = GT20 + GT 15 = 35 . Only one option is above 35
SVP
SVP
User avatar
Joined: 16 Jul 2009
Posts: 1635
Schools: CBS
WE 1: 4 years (Consulting)
Followers: 25

Kudos [?]: 119 [0], given: 2

GMAT Tests User
Re: RT=W Report (m07q03) [#permalink] New post 16 Dec 2010, 12:28
sleekmover wrote:
bmwhype2 wrote:
Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done?

* 41.4
* 34.1
* 13.4
* 12.4
* 10.8

[Reveal] Spoiler: OA
A

Source: GMAT Club Tests - hardest GMAT questions


Well, this is how I figured a shorter solution:

M takes 30 hrs, two cons of equal cap take 12.5 *2 = 25 hrs each. Hence J will take less than 25 hrs (how much less --> guess above 20 at least?)
J takes 12 hrs, two cons of equal cap take 7.5 * 2 = 15 hrs each. Hence M will take more than 15 hrs (how much greater --> guess around 18)
Add them = GT20 + GT 15 = 35 . Only one option is above 35


why you dont guess 18 (< than 25) for J and 16,1 (> than 15) for M, and therefore you get 18+16,1=34,1 and get B??
_________________

The sky is the limit
800 is the limit


Find out what's new at GMAT Club - latest features and updates

Manager
Manager
Joined: 23 Oct 2010
Posts: 93
Location: India
Followers: 2

Kudos [?]: 15 [0], given: 6

Re: RT=W Report (m07q03) [#permalink] New post 16 Dec 2010, 13:20
noboru wrote:
sleekmover wrote:
bmwhype2 wrote:
Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done?

* 41.4
* 34.1
* 13.4
* 12.4
* 10.8

[Reveal] Spoiler: OA
A

Source: GMAT Club Tests - hardest GMAT questions


Well, this is how I figured a shorter solution:

M takes 30 hrs, two cons of equal cap take 12.5 *2 = 25 hrs each. Hence J will take less than 25 hrs (how much less --> guess above 20 at least?)
J takes 12 hrs, two cons of equal cap take 7.5 * 2 = 15 hrs each. Hence M will take more than 15 hrs (how much greater --> guess around 18)
Add them = GT20 + GT 15 = 35 . Only one option is above 35


why you dont guess 18 (< than 25) for J and 16,1 (> than 15) for M, and therefore you get 18+16,1=34,1 and get B??


Vaild question noburo: Here is the explanation->
J = 12, with same cap cons 1 = 15 and cons 2 = 15, Hence M needs to compensate for less hrs of J. at least 3 needs to be added to common hrs (assuming we are looking at Arithmetic mean)
M = 30, with same cap Cons 1 = 25 and Cons 2 = 25, , Hence J needs to compensate for more hrs of M. At lease 5 needs to be subtracted from common hrs (assuming we are looking at Arithmetic Mean)

We should also understand a bit about harmonic and arithmentic, a concept illustrated here: http://en.wikipedia.org/wiki/Harmonic_mean
Some points from the above post to consider:
For all positive data sets containing at least one pair of nonequal values, the harmonic mean is always the least of the three means, while the arithmetic mean is always the greatest of the three and the geometric mean is always in between
Since the harmonic mean of a list of numbers tends strongly toward the least elements of the list

In certain situations, especially many situations involving rates and ratios, the harmonic mean provides the truest average. For instance, if a vehicle travels a certain distance at a speed x (e.g. 60 kilometres per hour) and then the same distance again at a speed y (e.g. 40 kilometres per hour), then its average speed is the harmonic mean of x and y (48 kilometres per hour), and its total travel time is the same as if it had traveled the whole distance at that average speed

Hope this explains
1 KUDOS received
Intern
Intern
Joined: 08 Dec 2011
Posts: 1
Followers: 0

Kudos [?]: 1 [1] , given: 0

Re: RT=W Report (m07q03) [#permalink] New post 20 Dec 2011, 21:36
1
This post received
KUDOS
Here is my answer:

Since there two consultants, one consultant can type in 12.5*2=25 hours, and edit in 7.5*2=15 hours. To type and edit for one consultant it will take 25+15=40 hours.

Mary can type in 30 hours, which is 20% slower than let's say average.
Jim can edit in 12 hours, which is 20% faster than average.

If Jim types, it will take for Jim 25*0.8%=20 hours.
If Mary edits, it will take for Mary 15*1.2%=18 hours.

Together 38 hours, which is closer to A. Therefore the correct answer is A.
1 KUDOS received
GMAT Club team member
User avatar
Joined: 02 Sep 2009
Posts: 11515
Followers: 1791

Kudos [?]: 9534 [1] , given: 826

Re: RT=W Report (m07q03) [#permalink] New post 20 Dec 2012, 06:19
1
This post received
KUDOS
bmwhype2 wrote:
Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done?

(A) 41.4
(B) 34.1
(C) 13.4
(D) 12.4
(E) 10.8

[Reveal] Spoiler: OA
A

Source: GMAT Club Tests - hardest GMAT questions


Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, approximately how many hours will it take if Jim types the report and Mary edits it immediately after he is done?

A. 41.4
B. 34.1
C. 13.4
D. 12.4
E. 10.8

Break down the problem into two pieces: typing and editing.

"Mary needs 30 hours to type the report" --> Mary's typing rate = 1/30 job/hour;
"Mary and Jim can type up a report in 12.5" and --> 1/30+1/x=1/12.5=2/25, where x is the time needed for Jim to type the report alone --> x=150/7;

"Jim needs 12 hours to edit the report" --> Jim's editing rate = 1/12 job/hour;
"Mary and Jim can edit a report in 7.5" and --> 1/y+1/12=1/7.5=2/15, where y is the time needed for Mary to edit the report alone --> y=20;

"How many hours will it take if Jim types the report and Mary edits it immediately after he is done" --> x+y=150/7+20=~41.4

Answer: A.
_________________

PLEASE READ AND FOLLOW: 11 Rules for Posting!!!

RESOURCES: [GMAT MATH BOOK]; 1. Triangles; 2. Polygons; 3. Coordinate Geometry; 4. Factorials; 5. Circles; 6. Number Theory

COLLECTION OF QUESTIONS:
PS: 1. Tough and Tricky questions; 2. Hard questions; 3. Hard questions part 2; 4. Standard deviation; 5. Tough Problem Solving Questions With Solutions; 6. Probability and Combinations Questions With Solutions; 7 Tough and tricky exponents and roots questions; 8 12 Easy Pieces (or not?); 9 Bakers' Dozen; 10 Algebra set. NEW!!!

DS: 1. DS tough questions; 2. DS tough questions part 2; 3. DS tough questions part 3; 4. DS Standard deviation; 5. Inequalities; 6. 700+ GMAT Data Sufficiency Questions With Explanations; 7 Tough and tricky exponents and roots questions; 8 The Discreet Charm of the DS ; 9 Devil's Dozen!!!; 10 Number Properties set. NEW!!!


What are GMAT Club Tests?
25 extra-hard Quant Tests

Find out what's new at GMAT Club - latest features and updates

Manager
Manager
User avatar
Joined: 04 Nov 2012
Posts: 63
Location: United States
Concentration: Finance, International Business
Schools: Tuck '16, Jones '16
GMAT Date: 02-23-2013
GPA: 3.7
WE: Science (Pharmaceuticals and Biotech)
Followers: 0

Kudos [?]: 21 [0], given: 69

Re: RT=W Report (m07q03) [#permalink] New post 20 Dec 2012, 08:57
I got the correct answer, but it took me >5 minutes! Did any of you solve it in 2 or less?
_________________

kudos are appreciated

Manager
Manager
User avatar
Joined: 04 Nov 2012
Posts: 63
Location: United States
Concentration: Finance, International Business
Schools: Tuck '16, Jones '16
GMAT Date: 02-23-2013
GPA: 3.7
WE: Science (Pharmaceuticals and Biotech)
Followers: 0

Kudos [?]: 21 [0], given: 69

Re: RT=W Report (m07q03) [#permalink] New post 20 Dec 2012, 09:01
Also, I don't believe this question is GMAT quality. It took me a few minutes to figure out what they were asking and that the two consultants were Mary and Jim since it wasn't stated. A correction is in order.
_________________

kudos are appreciated

Intern
Intern
Joined: 24 Nov 2012
Posts: 3
Followers: 0

Kudos [?]: 0 [0], given: 13

plz provide your explanations [#permalink] New post 20 Dec 2012, 16:28
Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done?

(A) 41.4
(B) 34.1
(C) 13.4
(D) 12.4
(E) 10.8
1 KUDOS received
Magoosh GMAT Instructor
User avatar
Joined: 28 Dec 2011
Posts: 823
Followers: 211

Kudos [?]: 573 [1] , given: 14

Re: plz provide your explanations [#permalink] New post 20 Dec 2012, 19:06
1
This post received
KUDOS
david1983 wrote:
Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done?
(A) 41.4
(B) 34.1
(C) 13.4
(D) 12.4
(E) 10.8


This is a very hard question, in part because it is not phrased particularly well. In particular, I believe the question wants us to understand that the "two consultant" mentioned in the first sentence are not two consultants in general, but rather, quite specifically, Mary & Jim.

Let's consider the typing rates.
Mary's rate = 1/30 (papers per hour)
Jim's rate = 1/X ----- where X = the hours it would take Jim to type one paper
Combined rate = 1/12.5 = 2/25
Big Idea: We can always add rates.
(Mary's rate) + (Jim's rate) = (combined rate)
(1/30) + (1/X) = 2/25
1/X = 2/25 - 1/30 = 12/150 - 5/150 = 7/150

X = 150/7 = 21 3/7

Now, let's consider the editing rates:
Mary's rate = 1/Y ------ where Y = the hours it would take Mary to edit one paper
Jim's rate = 1/12
Combined rate = 1/7.5 = 2/15
(Mary's rate) + (Jim's rate) = (combined rate)
1/Y + 1/12 = 2/15
1/Y = 2/15 - 1/12 = 8/60 - 5/60 = 3/60 = 1/20
Y = 20

Combined time = X + Y = 21 3/7 + 20 = 41 3/7 = 41.42857
Answer = A

Here's a related blog you may find helpful:
http://magoosh.com/gmat/2012/gmat-work-rate-questions/

Does all this make sense?

Mike :-)
_________________

Mike McGarry
Magoosh Test Prep

Image

Image

1 KUDOS received
Senior Manager
Senior Manager
User avatar
Joined: 13 Aug 2012
Posts: 468
Followers: 12

Kudos [?]: 74 [1] , given: 11

GMAT ToolKit User GMAT Tests User
Re: plz provide your explanations [#permalink] New post 20 Dec 2012, 21:16
1
This post received
KUDOS
david1983 wrote:
Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done?

(A) 41.4
(B) 34.1
(C) 13.4
(D) 12.4
(E) 10.8


Given:
\frac{1}{M_{edit}}+\frac{1}{J_{edit}}=\frac{1}{7.5}=\frac{2}{15}
\frac{1}{M_{type}}+\frac{1}{J_{type}}=\frac{1}{12.5}=\frac{2}{25}
\frac{1}{M_{type}}=\frac{1}{30}
\frac{1}{J_{edit}}=\frac{1}{12}

Solve for M_{edit} + J_{edit}:

\frac{1}{M_{edit}}+\frac{1}{J_{edit}} - \frac{1}{J_{edit}}=\frac{2}{15}-\frac{1}{12}=\frac{1}{20}

\frac{1}{M_{type}}+\frac{1}{J_{type}}-\frac{1}{M_{type}}=\frac{2}{25}-\frac{1}{30}=\frac{7}{150}

M_{edit} + J_{type} = 20 + 21.4=41.4
Director
Director
Status: Struggling with GMAT prep
Affiliations: NYK Line
Joined: 21 Sep 2012
Posts: 894
Location: India
WE: Engineering (Transportation)
Followers: 12

Kudos [?]: 78 [0], given: 55

CAT Tests
Re: RT=W Report (m07q03) [#permalink] New post 20 Dec 2012, 22:11
The question was not really difficult.....But lot of calculation involved...Can anyone suggest a shorter method
GMAT Club team member
User avatar
Joined: 02 Sep 2009
Posts: 11515
Followers: 1791

Kudos [?]: 9534 [0], given: 826

Re: plz provide your explanations [#permalink] New post 21 Dec 2012, 03:06
david1983 wrote:
Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done?

(A) 41.4
(B) 34.1
(C) 13.4
(D) 12.4
(E) 10.8


Merging similar topics. Please refer to the solutions above.
_________________

PLEASE READ AND FOLLOW: 11 Rules for Posting!!!

RESOURCES: [GMAT MATH BOOK]; 1. Triangles; 2. Polygons; 3. Coordinate Geometry; 4. Factorials; 5. Circles; 6. Number Theory

COLLECTION OF QUESTIONS:
PS: 1. Tough and Tricky questions; 2. Hard questions; 3. Hard questions part 2; 4. Standard deviation; 5. Tough Problem Solving Questions With Solutions; 6. Probability and Combinations Questions With Solutions; 7 Tough and tricky exponents and roots questions; 8 12 Easy Pieces (or not?); 9 Bakers' Dozen; 10 Algebra set. NEW!!!

DS: 1. DS tough questions; 2. DS tough questions part 2; 3. DS tough questions part 3; 4. DS Standard deviation; 5. Inequalities; 6. 700+ GMAT Data Sufficiency Questions With Explanations; 7 Tough and tricky exponents and roots questions; 8 The Discreet Charm of the DS ; 9 Devil's Dozen!!!; 10 Number Properties set. NEW!!!


What are GMAT Club Tests?
25 extra-hard Quant Tests

Find out what's new at GMAT Club - latest features and updates

Re: plz provide your explanations   [#permalink] 21 Dec 2012, 03:06
    Similar topics Author Replies Last post
Similar
Topics:
New posts Score Report sunniboy007 1 20 Dec 2003, 17:39
New posts GMAT Reporting cs77 1 13 Sep 2004, 17:30
New posts to report, or not to report... asdert 4 12 Dec 2007, 23:32
New posts Report ritula 6 22 Jan 2009, 04:15
Moved topic 9 EXPERTS_POSTS_IN_THIS_TOPIC RT=W Report (m07q03) bmwhype2 16 14 Nov 2007, 11:16
Display posts from previous: Sort by

RT=W Report (m07q03)

  Question banks Downloads My Bookmarks Reviews  

Moderator: Bunuel



GMAT Club MBA Forum Home| About| Privacy Policy| Terms and Conditions| GMAT Club Rules| Contact| Sitemap

Powered by phpBB © phpBB Group and phpBB SEO

Kindly note that the GMAT® test is a registered trademark of the Graduate Management Admission Council®, and this site has neither been reviewed nor endorsed by GMAC®.