RT=W Report (m07q03) [#permalink]
14 Nov 2007, 11:16
Question Stats:
58% (03:48) correct
41% (01:43) wrong based on 39 sessions
Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done? (A) 41.4 (B) 34.1 (C) 13.4 (D) 12.4 (E) 10.8 Source: GMAT Club Tests - hardest GMAT questions
|
|
|
|
|
|
|
|
|
Manager
Joined: 25 Jul 2007
Posts: 108
Followers: 1
Kudos [?]:
8
[2] , given: 0
|
2
This post received KUDOS
Let time taken by 'j' to type be 'j'.
We know that 1/m + 1/j = 1/12.5
i.e. 1/30 + 1/j = 1/12.5
i.e. (30+j)/30j = 1/12.5
i.e. 375 = 30j-12.5j=17.5j
i.e. j = 375/17.5=150/7
Let time taken by 'm' to edit be 'x' and that by 'j' be 'y'.
We know that 1/x + 1/y = 1/7.5
i.e. 1/x + 1/12 = 1/7.5
i.e. (12+x)/12x = 1/7.5
i.e. 90 = 12x-7.5x=4.5x
i.e. x = 90/4.5 = 20
Therefore answer = 150/7+20 = 41.4
|
|
|
|
|
|
Manager
Joined: 29 Nov 2009
Posts: 109
Location: United States
Followers: 1
Kudos [?]:
21
[0], given: 5
|
Re: RT=W Report (m07q03) [#permalink]
09 Dec 2009, 07:16
Right, and once you solve for either 150/7 or 20, you can immediately eliminate all possibilities other than A and B. This would give you a 50% guess for half the work if you're low on time.
|
|
|
|
|
|
Intern
Joined: 23 Nov 2009
Posts: 1
Followers: 0
Kudos [?]:
0
[0], given: 1
|
Re: RT=W Report (m07q03) [#permalink]
09 Dec 2009, 12:24
Hi I think the question should be re-written as a "which is the closest" or "approximately how long" question since 150/7 doesn't exactly equal 21.4... It's close to it: 21.42857... There would never be an approximate right answer on the GMAT on a question which asks for a specific quantity
|
|
|
|
|
|
Manager
Joined: 23 Oct 2010
Posts: 93
Location: India
Followers: 2
Kudos [?]:
15
[0], given: 6
|
Re: RT=W Report (m07q03) [#permalink]
16 Dec 2010, 06:02
A.
This is calculation intensive. What would be a shorter solution? I solved like this: 1/30 + 1/x = 1/12.5 => x = 21.4 1/12+1/y = 1/7.5 => y = 20
Total = 21.4 + 20 = 41.4
|
|
|
|
|
|
Manager
Joined: 23 Oct 2010
Posts: 93
Location: India
Followers: 2
Kudos [?]:
15
[3] , given: 6
|
Re: RT=W Report (m07q03) [#permalink]
16 Dec 2010, 06:11
3
This post received KUDOS
bmwhype2 wrote: Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done? * 41.4 * 34.1 * 13.4 * 12.4 * 10.8 Source: GMAT Club Tests - hardest GMAT questions Well, this is how I figured a shorter solution: M takes 30 hrs, two cons of equal cap take 12.5 *2 = 25 hrs each. Hence J will take less than 25 hrs (how much less --> guess above 20 at least?) J takes 12 hrs, two cons of equal cap take 7.5 * 2 = 15 hrs each. Hence M will take more than 15 hrs (how much greater --> guess around 18) Add them = GT20 + GT 15 = 35 . Only one option is above 35
|
|
|
|
|
|
SVP
Joined: 16 Jul 2009
Posts: 1634
Schools: CBS
WE 1: 4 years (Consulting)
Followers: 25
Kudos [?]:
122
[0], given: 2
|
Re: RT=W Report (m07q03) [#permalink]
16 Dec 2010, 12:28
sleekmover wrote: bmwhype2 wrote: Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done? * 41.4 * 34.1 * 13.4 * 12.4 * 10.8 Source: GMAT Club Tests - hardest GMAT questions Well, this is how I figured a shorter solution: M takes 30 hrs, two cons of equal cap take 12.5 *2 = 25 hrs each. Hence J will take less than 25 hrs (how much less --> guess above 20 at least?) J takes 12 hrs, two cons of equal cap take 7.5 * 2 = 15 hrs each. Hence M will take more than 15 hrs (how much greater --> guess around 18) Add them = GT20 + GT 15 = 35 . Only one option is above 35 why you dont guess 18 (< than 25) for J and 16,1 (> than 15) for M, and therefore you get 18+16,1=34,1 and get B??
_________________
The sky is the limit 800 is the limit
Find out what's new at GMAT Club - latest features and updates
|
|
|
|
|
|
Manager
Joined: 23 Oct 2010
Posts: 93
Location: India
Followers: 2
Kudos [?]:
15
[0], given: 6
|
Re: RT=W Report (m07q03) [#permalink]
16 Dec 2010, 13:20
noboru wrote: sleekmover wrote: bmwhype2 wrote: Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done? * 41.4 * 34.1 * 13.4 * 12.4 * 10.8 Source: GMAT Club Tests - hardest GMAT questions Well, this is how I figured a shorter solution: M takes 30 hrs, two cons of equal cap take 12.5 *2 = 25 hrs each. Hence J will take less than 25 hrs (how much less --> guess above 20 at least?) J takes 12 hrs, two cons of equal cap take 7.5 * 2 = 15 hrs each. Hence M will take more than 15 hrs (how much greater --> guess around 18) Add them = GT20 + GT 15 = 35 . Only one option is above 35 why you dont guess 18 (< than 25) for J and 16,1 (> than 15) for M, and therefore you get 18+16,1=34,1 and get B?? Vaild question noburo: Here is the explanation-> J = 12, with same cap cons 1 = 15 and cons 2 = 15, Hence M needs to compensate for less hrs of J. at least 3 needs to be added to common hrs (assuming we are looking at Arithmetic mean) M = 30, with same cap Cons 1 = 25 and Cons 2 = 25, , Hence J needs to compensate for more hrs of M. At lease 5 needs to be subtracted from common hrs (assuming we are looking at Arithmetic Mean) We should also understand a bit about harmonic and arithmentic, a concept illustrated here: http://en.wikipedia.org/wiki/Harmonic_meanSome points from the above post to consider: For all positive data sets containing at least one pair of nonequal values, the harmonic mean is always the least of the three means, while the arithmetic mean is always the greatest of the three and the geometric mean is always in between Since the harmonic mean of a list of numbers tends strongly toward the least elements of the list In certain situations, especially many situations involving rates and ratios, the harmonic mean provides the truest average. For instance, if a vehicle travels a certain distance at a speed x (e.g. 60 kilometres per hour) and then the same distance again at a speed y (e.g. 40 kilometres per hour), then its average speed is the harmonic mean of x and y (48 kilometres per hour), and its total travel time is the same as if it had traveled the whole distance at that average speed Hope this explains
|
|
|
|
|
|
Intern
Joined: 08 Dec 2011
Posts: 1
Followers: 0
Kudos [?]:
1
[1] , given: 0
|
Re: RT=W Report (m07q03) [#permalink]
20 Dec 2011, 21:36
1
This post received KUDOS
Here is my answer:
Since there two consultants, one consultant can type in 12.5*2=25 hours, and edit in 7.5*2=15 hours. To type and edit for one consultant it will take 25+15=40 hours.
Mary can type in 30 hours, which is 20% slower than let's say average. Jim can edit in 12 hours, which is 20% faster than average.
If Jim types, it will take for Jim 25*0.8%=20 hours. If Mary edits, it will take for Mary 15*1.2%=18 hours.
Together 38 hours, which is closer to A. Therefore the correct answer is A.
|
|
|
|
|
|
GMAT Club team member
Joined: 02 Sep 2009
Posts: 12104
Followers: 1879
Kudos [?]:
10116
[1] , given: 961
|
Re: RT=W Report (m07q03) [#permalink]
20 Dec 2012, 06:19
1
This post received KUDOS
bmwhype2 wrote: Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done? (A) 41.4 (B) 34.1 (C) 13.4 (D) 12.4 (E) 10.8 Source: GMAT Club Tests - hardest GMAT questions Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, approximately how many hours will it take if Jim types the report and Mary edits it immediately after he is done?A. 41.4 B. 34.1 C. 13.4 D. 12.4 E. 10.8 Break down the problem into two pieces: typing and editing. "Mary needs 30 hours to type the report" --> Mary's typing rate = 1/30 job/hour; "Mary and Jim can type up a report in 12.5" and --> 1/30+1/x=1/12.5=2/25, where x is the time needed for Jim to type the report alone --> x=150/7; "Jim needs 12 hours to edit the report" --> Jim's editing rate = 1/12 job/hour; "Mary and Jim can edit a report in 7.5" and --> 1/y+1/12=1/7.5=2/15, where y is the time needed for Mary to edit the report alone --> y=20; "How many hours will it take if Jim types the report and Mary edits it immediately after he is done" --> x+y=150/7+20=~41.4 Answer: A.
_________________
PLEASE READ AND FOLLOW: 11 Rules for Posting!!!
RESOURCES: [GMAT MATH BOOK]; 1. Triangles; 2. Polygons; 3. Coordinate Geometry; 4. Factorials; 5. Circles; 6. Number Theory; 7. Remainders; 8. Overlapping Sets; 9. PDF of Math Book; 10. Remainders
COLLECTION OF QUESTIONS: PS: 1. Tough and Tricky questions; 2. Hard questions; 3. Hard questions part 2; 4. Standard deviation; 5. Tough Problem Solving Questions With Solutions; 6. Probability and Combinations Questions With Solutions; 7 Tough and tricky exponents and roots questions; 8 12 Easy Pieces (or not?); 9 Bakers' Dozen; 10 Algebra set. NEW!!! ,11 Mixed Questions NEW!!!, 12 Fresh Meat NEW!!!
DS: 1. DS tough questions; 2. DS tough questions part 2; 3. DS tough questions part 3; 4. DS Standard deviation; 5. Inequalities; 6. 700+ GMAT Data Sufficiency Questions With Explanations; 7 Tough and tricky exponents and roots questions; 8 The Discreet Charm of the DS ; 9 Devil's Dozen!!!; 10 Number Properties set. NEW!!!, 11 New DS set. NEW!!!
 What are GMAT Club Tests? 25 extra-hard Quant Tests
Find out what's new at GMAT Club - latest features and updates
|
|
|
|
|
|
Manager
Joined: 04 Nov 2012
Posts: 65
Location: United States
Concentration: Finance, International Business
GMAT 1: Q44 V38
GPA: 3.7
WE: Science (Pharmaceuticals and Biotech)
Followers: 0
Kudos [?]:
22
[0], given: 72
|
Re: RT=W Report (m07q03) [#permalink]
20 Dec 2012, 08:57
I got the correct answer, but it took me >5 minutes! Did any of you solve it in 2 or less?
_________________
kudos are appreciated
|
|
|
|
|
|
Manager
Joined: 04 Nov 2012
Posts: 65
Location: United States
Concentration: Finance, International Business
GMAT 1: Q44 V38
GPA: 3.7
WE: Science (Pharmaceuticals and Biotech)
Followers: 0
Kudos [?]:
22
[0], given: 72
|
Re: RT=W Report (m07q03) [#permalink]
20 Dec 2012, 09:01
Also, I don't believe this question is GMAT quality. It took me a few minutes to figure out what they were asking and that the two consultants were Mary and Jim since it wasn't stated. A correction is in order.
_________________
kudos are appreciated
|
|
|
|
|
|
Intern
Joined: 24 Nov 2012
Posts: 3
Followers: 0
Kudos [?]:
0
[0], given: 13
|
plz provide your explanations [#permalink]
20 Dec 2012, 16:28
Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done?
(A) 41.4 (B) 34.1 (C) 13.4 (D) 12.4 (E) 10.8
|
|
|
|
|
|
Magoosh GMAT Instructor
Joined: 28 Dec 2011
Posts: 858
Followers: 222
Kudos [?]:
616
[1] , given: 14
|
Re: plz provide your explanations [#permalink]
20 Dec 2012, 19:06
1
This post received KUDOS
david1983 wrote: Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done? (A) 41.4 (B) 34.1 (C) 13.4 (D) 12.4 (E) 10.8 This is a very hard question, in part because it is not phrased particularly well. In particular, I believe the question wants us to understand that the "two consultant" mentioned in the first sentence are not two consultants in general, but rather, quite specifically, Mary & Jim. Let's consider the typing rates. Mary's rate = 1/30 (papers per hour) Jim's rate = 1/X ----- where X = the hours it would take Jim to type one paper Combined rate = 1/12.5 = 2/25 Big Idea: We can always add rates. (Mary's rate) + (Jim's rate) = (combined rate) (1/30) + (1/X) = 2/25 1/X = 2/25 - 1/30 = 12/150 - 5/150 = 7/150 X = 150/7 = 21 3/7 Now, let's consider the editing rates: Mary's rate = 1/Y ------ where Y = the hours it would take Mary to edit one paper Jim's rate = 1/12 Combined rate = 1/7.5 = 2/15 (Mary's rate) + (Jim's rate) = (combined rate) 1/Y + 1/12 = 2/15 1/Y = 2/15 - 1/12 = 8/60 - 5/60 = 3/60 = 1/20 Y = 20 Combined time = X + Y = 21 3/7 + 20 = 41 3/7 = 41.42857 Answer = AHere's a related blog you may find helpful: http://magoosh.com/gmat/2012/gmat-work-rate-questions/Does all this make sense? Mike
_________________
Mike McGarry Magoosh Test Prep
|
|
|
|
|
|
Senior Manager
Joined: 13 Aug 2012
Posts: 468
Followers: 13
Kudos [?]:
88
[1] , given: 11
|
Re: plz provide your explanations [#permalink]
20 Dec 2012, 21:16
1
This post received KUDOS
david1983 wrote: Two consultants can type up a report in 12.5 hours and edit it in 7.5 hours. If Mary needs 30 hours to type the report and Jim needs 12 hours to edit it alone, how many hours will it take if Jim types the report and Mary edits it immediately after he is done?
(A) 41.4 (B) 34.1 (C) 13.4 (D) 12.4 (E) 10.8 Given:\frac{1}{M_{edit}}+\frac{1}{J_{edit}}=\frac{1}{7.5}=\frac{2}{15}\frac{1}{M_{type}}+\frac{1}{J_{type}}=\frac{1}{12.5}=\frac{2}{25}\frac{1}{M_{type}}=\frac{1}{30}\frac{1}{J_{edit}}=\frac{1}{12}Solve for M_{edit} + J_{edit}:\frac{1}{M_{edit}}+\frac{1}{J_{edit}} - \frac{1}{J_{edit}}=\frac{2}{15}-\frac{1}{12}=\frac{1}{20}\frac{1}{M_{type}}+\frac{1}{J_{type}}-\frac{1}{M_{type}}=\frac{2}{25}-\frac{1}{30}=\frac{7}{150}M_{edit} + J_{type} = 20 + 21.4=41.4
|
|
|
|
|
|
Director
Status: Final Lap Up!!!
Affiliations: NYK Line
Joined: 21 Sep 2012
Posts: 981
Location: India
GMAT 1: 410 Q35 V11 GMAT 2: 530 Q44 V20 GMAT 3: 630 Q45 V31
GPA: 3.2
WE: Engineering (Transportation)
Followers: 15
Kudos [?]:
105
[0], given: 58
|
Re: RT=W Report (m07q03) [#permalink]
20 Dec 2012, 22:11
The question was not really difficult.....But lot of calculation involved...Can anyone suggest a shorter method
|
|
|
|
|
|
GMAT Club team member
Joined: 02 Sep 2009
Posts: 12104
Followers: 1879
Kudos [?]:
10116
[0], given: 961
|
Re: plz provide your explanations [#permalink]
21 Dec 2012, 03:06
|
|
|
|
|
|
|
Re: plz provide your explanations
[#permalink]
21 Dec 2012, 03:06
|
|
|
|
|
|
|
|
|
|
|