|
Author |
Message |
|
TAGS:
|
|
|
SVP
Joined: 03 Feb 2003
Posts: 1683
Followers: 4
Kudos [?]:
16
[0], given: 0
|
Six qualified workers can cast 10.000 tons of raw copper in [#permalink]
28 Jun 2003, 23:20
Question Stats:
0% (00:00) correct
100% (00:00) wrong based on 0 sessions
Six qualified workers can cast 10.000 tons of raw copper in 2 hours. Two apprentices who work 2/3 as fast as a qualified worker are added to the group. Finally, the work is done. How much time has been saved due to the apprentices?
|
|
|
|
|
|
|
Manager
Joined: 24 Jun 2003
Posts: 150
Location: India
Followers: 1
Kudos [?]:
1
[0], given: 0
|
With the new workers, the 10.000 tons of raw copper can be cast in 1,63 hours as compared to 2 hours earlier. Therefore 0,37 hours have been saved
|
|
|
|
|
|
SVP
Joined: 03 Feb 2003
Posts: 1683
Followers: 4
Kudos [?]:
16
[0], given: 0
|
10000=6R2=(6R+4/3R)T, where T=18/11
The time saving = 2–(18/11)=4/11
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Similar topics |
Author |
Replies |
Last post |
|
Similar Topics:
|
|
|
|
In repousse, a method of sculpture, workers lay copper
|
becoolja |
4 |
29 Jul 2004, 11:13 |
|
|
|
In repousse, a method of sculpture, workers lay copper
|
becoolja |
3 |
29 Jul 2004, 11:22 |
|
|
|
A qualified worker digs a well in 5 hours. He invites 2
|
Hermione |
5 |
04 Oct 2006, 08:14 |
|
|
|
Six qualified workers can cast 100 tons of raw copper in 2
|
prasannar |
3 |
26 May 2008, 02:35 |
|
|
|
In repousse, a method of sculpture, workers lay copper
|
TomB |
3 |
21 Jul 2011, 16:49 |
|
|
|
|
|
|