|
Author |
Message |
|
TAGS:
|
|
|
Senior Manager
Joined: 19 Feb 2004
Posts: 477
Location: Lungi
Followers: 1
Kudos [?]:
1
[0], given: 0
|
The cost of the average computer logic device is falling at [#permalink]
01 Apr 2004, 07:16
Question Stats:
100% (01:47) correct
0% (00:00) wrong based on 0 sessions
The cost of the average computer logic device is falling at the
rate of 25 percent per year, and the cost of the average computer
memory device at the rate of 40 percent per year. It can be concluded
that if these ratess of cost decline remain constant for a period of
three years, at the end of that time the cost of the average computer
memory device will have declined by a greater amount than the cost of
the average computer logic device.5.
Accurate information about which of the following would be most
useful in evaluating the correctness of the conclusion above?
(A) The number of logic devices and memory devices projected to be purchased during the next three years
(B) The actual prices charged for the average computer logic device
and the average computer memory device
(C) The compatibility of different manufacturers' logic devices and
memory devices
(D) The relative durability of logic devices and memory devices
(E) The average number of logic devices and memory devices needed for
an average computer system
|
|
|
|
|
|
|
Senior Manager
Joined: 05 Feb 2004
Posts: 417
Location: USA
Followers: 1
Kudos [?]:
1
[0], given: 0
|
A??
|
|
|
|
|
|
Manager
Joined: 16 Oct 2003
Posts: 225
Location: India
Followers: 1
Kudos [?]:
0
[0], given: 0
|
I will go with B.
_________________
A 750 aspirant.
|
|
|
|
|
|
Director
Joined: 03 Jul 2003
Posts: 716
Followers: 2
Kudos [?]:
4
[0], given: 0
|
I'll go with B
|
|
|
|
|
|
Senior Manager
Joined: 23 Sep 2003
Posts: 327
Location: US
Followers: 1
Kudos [?]:
0
[0], given: 0
|
B here too. How can you tell without knowing the current costs?
|
|
|
|
|
|
Manager
Joined: 27 Feb 2004
Posts: 245
Location: illinois
Followers: 1
Kudos [?]:
1
[0], given: 0
|
B here....We need to know the costs to compare...
|
|
|
|
|
|
GMAT Club Legend
Joined: 15 Dec 2003
Posts: 4441
Followers: 10
Kudos [?]:
81
[0], given: 0
|
cbrf3 wrote: A??
The amount projected will have no bearing on the actual price charged for each of the 2 components. B has to be right
_________________
Best Regards,
Paul
|
|
|
|
|
|
SVP
Joined: 30 Oct 2003
Posts: 1963
Location: NewJersey USA
Followers: 3
Kudos [?]:
25
[0], given: 0
|
B obviously.
|
|
|
|
|
|
Senior Manager
Joined: 19 Feb 2004
Posts: 477
Location: Lungi
Followers: 1
Kudos [?]:
1
[0], given: 0
|
OA is B.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Moderators:
metallicafan, rajeevrks27, souvik101990, PTK, MacFauz, noboru, kissthegmat, carcass, willigetmylifeback, mikemcgarry, doe007, Vercules, Legendaddy, tuanquang269, RaviChandra, Marcab, Narenn
|