Find all School-related info fast with the new School-Specific MBA Forum

It is currently 27 Aug 2015, 23:31
GMAT Club Tests

Close

GMAT Club Daily Prep

Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History

Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.

Events & Promotions

Events & Promotions in June
Open Detailed Calendar

What is the median number of employees assigned per project

  Question banks Downloads My Bookmarks Reviews Important topics  
Author Message
TAGS:
1 KUDOS received
Intern
Intern
avatar
Joined: 03 Nov 2011
Posts: 11
Followers: 0

Kudos [?]: 15 [1] , given: 6

What is the median number of employees assigned per project [#permalink] New post 04 May 2012, 01:20
1
This post received
KUDOS
18
This post was
BOOKMARKED
00:00
A
B
C
D
E

Difficulty:

  35% (medium)

Question Stats:

62% (01:59) correct 38% (01:00) wrong based on 601 sessions
What is the median number of employees assigned per project for the projects at Company Z?

(1) 25 percent of the projects at Company Z have 4 or more employees assigned to each project.
(2) 35 percent of the projects at Company Z have 2 or fewer employees assigned to each project
[Reveal] Spoiler: OA

Last edited by Bunuel on 04 May 2012, 01:26, edited 1 time in total.
Moved to DS subforum
Expert Post
9 KUDOS received
Math Expert
User avatar
Joined: 02 Sep 2009
Posts: 29090
Followers: 4720

Kudos [?]: 49594 [9] , given: 7395

Re: What is the median number of employees assigned per project [#permalink] New post 04 May 2012, 01:46
9
This post received
KUDOS
Expert's post
9
This post was
BOOKMARKED
ITIZCODE wrote:
What is the median number of employees assigned per project for the projects at Company Z?

(1) 25 percent of the projects at Company Z have 4 or more employees assigned to each project.
(2) 35 percent of the projects at Company Z have 2 or fewer employees assigned to each project


What is the median number of employees assigned per project for the projects at Company Z?

(1) 25 percent of the projects at Company Z have 4 or more employees assigned to each project. Not sufficient on its own.

(2) 35 percent of the projects at Company Z have 2 or fewer employees assigned to each project. Not sufficient on its own.

(1)+(2) Since 35% of of the projects have 2 or fewer (\(\leq{2}\))employees and 25% of the projects have 4 or more (\(\geq{4}\)) employees, then 100%-(25%+35%)=40% of the projects have exactly 3 employees assigned to each of them. So, the median number of employees assigned per project is 3. Sufficient.

Answer: C.

To elaborate more: consider there are 100 projects: \(\{p_1, \ p_2, \ ... , \ p_{100}\}\). The values of \(p_1\) to \(p_{35}\) will be 0, 1, or 2; the values of \(p_{36}\) to \(p_{75}\) will be exactly 3; the values of \(p_{76}\) to \(p_{100}\) will be 4 or more. \(Median=\frac{p_{50}+p_{51}}{2}=\frac{3+3}{2}=3\).

For example list can be: \(\{2, \ 2, \ 2, \ ..., \ (p_{35}=2), \ (p_{36}=3), \ 3, \ ..., \ (p_{75}=3), \ (p_{76}=4), \ 4, \ ..., \ (p_{100}=4)\}\);
OR:
\(\{0, \ 0, \ 1, \ 1, \ 1, \ 2, \ 2, \ ..., \ (p_{35}=2), \ (p_{36}=3), \ 3, \ ..., \ (p_{75}=3), \ (p_{76}=4), \ 5, \ 7, \ 27, \ ..., \ (p_{100}=10000)\}\) (of course there are a lot of other breakdowns).

In any case median=3.

Hope it's clear.

P.S. Please post PS questions in the PS subforum: gmat-problem-solving-ps-140/ and DS questions in the DS subforum: gmat-data-sufficiency-ds-141/ No posting of PS/DS questions is allowed in the main Math forum.
_________________

NEW TO MATH FORUM? PLEASE READ THIS: ALL YOU NEED FOR QUANT!!!

PLEASE READ AND FOLLOW: 12 Rules for Posting!!!

RESOURCES: [GMAT MATH BOOK]; 1. Triangles; 2. Polygons; 3. Coordinate Geometry; 4. Factorials; 5. Circles; 6. Number Theory; 7. Remainders; 8. Overlapping Sets; 9. PDF of Math Book; 10. Remainders; 11. GMAT Prep Software Analysis ; 12. SEVEN SAMURAI OF 2012 (BEST DISCUSSIONS) ; 12. Tricky questions from previous years.

COLLECTION OF QUESTIONS:
PS: 1. Tough and Tricky questions; 2. Hard questions; 3. Hard questions part 2; 4. Standard deviation; 5. Tough Problem Solving Questions With Solutions; 6. Probability and Combinations Questions With Solutions; 7 Tough and tricky exponents and roots questions; 8 12 Easy Pieces (or not?); 9 Bakers' Dozen; 10 Algebra set. ,11 Mixed Questions, 12 Fresh Meat

DS: 1. DS tough questions; 2. DS tough questions part 2; 3. DS tough questions part 3; 4. DS Standard deviation; 5. Inequalities; 6. 700+ GMAT Data Sufficiency Questions With Explanations; 7 Tough and tricky exponents and roots questions; 8 The Discreet Charm of the DS ; 9 Devil's Dozen!!!; 10 Number Properties set., 11 New DS set.


What are GMAT Club Tests?
25 extra-hard Quant Tests

GMAT Club Premium Membership - big benefits and savings

1 KUDOS received
Manager
Manager
User avatar
Joined: 28 Jul 2011
Posts: 224
Followers: 1

Kudos [?]: 66 [1] , given: 14

Re: What is the median number of employees assigned per project [#permalink] New post 06 May 2012, 15:08
1
This post received
KUDOS
Will vote for C

let total be "x" projects i.e 100% projec

(A) 25% projects has number of employees >= 4

- we dont know anything about other 75% projects

(B) 35% project has number of employees <= 2


- we dont know anything about other 65% projects

(C)

for 35% --> No. of emp <= 2
for 25% --> No. of emp >= 4

based on above data we can calculate that
Remaining 40% of projects --> No. of emp = 3 (which is between 2 < no. of emp < 4)
Intern
Intern
avatar
Joined: 14 Aug 2012
Posts: 6
Followers: 0

Kudos [?]: 0 [0], given: 0

Re: What is the median number of employees assigned per project [#permalink] New post 28 Aug 2012, 12:30
Thanks for the reply! Finally got this one.
Manager
Manager
avatar
Status: exam is close ... dont know if i ll hit that number
Joined: 06 Jun 2011
Posts: 207
Location: India
Concentration: International Business, Marketing
GMAT Date: 10-09-2012
GPA: 3.2
Followers: 2

Kudos [?]: 10 [0], given: 1

Re: What is the median number of employees assigned per project [#permalink] New post 30 Aug 2012, 19:42
bunuel sir great reply ...
your approach to the answers by taking apt samples scare me

i feel like i just cant do it without error
_________________

just one more month for exam...

Manager
Manager
User avatar
Joined: 01 Sep 2012
Posts: 129
Followers: 1

Kudos [?]: 58 [0], given: 19

What is the median number of employees assigned per project [#permalink] New post 10 Dec 2012, 13:11
What is the median number of employees assigned per project for the projects at Company Z?

(1) 25 percent of the projects at Company Z have 4 or more employees assigned to each project.
(2) 35 percent of the projects at Company Z have 2 or fewer employees assigned to each project


Ruled out quickly A,B,D.
remained with C, E.
chose E.
then looked here:
what-is-the-median-number-of-employees-assigned-per-project-131892.html

and i still dont understand bunuel's way.
why the employees who are not in the 25% or 35% must have exactly 3 employees?
thanks
_________________

If my answer helped, dont forget KUDOS! :)


IMPOSSIBLE IS NOTHING

1 KUDOS received
Senior Manager
Senior Manager
avatar
Joined: 06 Aug 2011
Posts: 408
Followers: 2

Kudos [?]: 105 [1] , given: 82

Re: What is the median number of employees assigned per project [#permalink] New post 11 Dec 2012, 02:47
1
This post received
KUDOS
roygush wrote:
What is the median number of employees assigned per project for the projects at Company Z?

(1) 25 percent of the projects at Company Z have 4 or more employees assigned to each project.
(2) 35 percent of the projects at Company Z have 2 or fewer employees assigned to each project


Ruled out quickly A,B,D.
remained with C, E.
chose E.
then looked here:
what-is-the-median-number-of-employees-assigned-per-project-131892.html

and i still dont understand bunuel's way.
why the employees who are not in the 25% or 35% must have exactly 3 employees?
thanks


25% of company Z projects have 4 or more that (4,5,6,....)

35% of company z projects have 2 or less (0,1,2 )...

there must b 3 employees per project of company z which consists of (25+35=60) and 100-60=40%..

0,1,2 must be first 35 projects
3 employees for next 40 project
and 4 or more than 4 employees for remaning 25 projects..
_________________

Bole So Nehal.. Sat Siri Akal.. Waheguru ji help me to get 700+ score !

1 KUDOS received
Intern
Intern
User avatar
Joined: 24 Apr 2012
Posts: 48
Followers: 0

Kudos [?]: 18 [1] , given: 1

Re: What is the median number of employees assigned per project [#permalink] New post 11 Dec 2012, 03:43
1
This post received
KUDOS
ITIZCODE wrote:
What is the median number of employees assigned per project for the projects at Company Z?

(1) 25 percent of the projects at Company Z have 4 or more employees assigned to each project.
(2) 35 percent of the projects at Company Z have 2 or fewer employees assigned to each project


Ans: : Median is the middle value. Statements 1 and 2 alone give us insufficient data but when we combine both of them we see that 25 % have 4 or more and 35% have 2 or less therefore 40 %have 3 employees. Therefore the median would be 3 and the answer is (C). :lol:
_________________

www.mnemoniceducation.com

TURN ON YOUR MINDS!!!

Senior Manager
Senior Manager
User avatar
Status: Prevent and prepare. Not repent and repair!!
Joined: 13 Feb 2010
Posts: 277
Location: India
Concentration: Technology, General Management
GPA: 3.75
WE: Sales (Telecommunications)
Followers: 9

Kudos [?]: 48 [0], given: 282

Re: What is the median number of employees assigned per project [#permalink] New post 27 Dec 2012, 08:24
Bunuel wrote:
ITIZCODE wrote:
What is the median number of employees assigned per project for the projects at Company Z?

(1) 25 percent of the projects at Company Z have 4 or more employees assigned to each project.
(2) 35 percent of the projects at Company Z have 2 or fewer employees assigned to each project


What is the median number of employees assigned per project for the projects at Company Z?

(1) 25 percent of the projects at Company Z have 4 or more employees assigned to each project. Not sufficient on its own.

(2) 35 percent of the projects at Company Z have 2 or fewer employees assigned to each project. Not sufficient on its own.

(1)+(2) Since 35% of of the projects have 2 or fewer (\(\leq{2}\))employees and 25% of the projects have 4 or more (\(\geq{4}\)) employees, then 100%-(25%+35%)=40% of the projects have exactly 3 employees assigned to each of them. So, the median number of employees assigned per project is 3. Sufficient.

Answer: C.




To elaborate more: consider there are 100 projects: \(\{p_1, \ p_2, \ ... , \ p_{100}\}\). The values of \(p_1\) to \(p_{35}\) will be 0, 1, or 2; the values of \(p_{36}\) to \(p_{75}\) will be exactly 3; the values of \(p_{76}\) to \(p_{100}\) will be 4 or more. \(Median=\frac{p_{50}+p_{51}}{2}=\frac{3+3}{2}=3\).

For example list can be: \(\{2, \ 2, \ 2, \ ..., \ (p_{35}=2), \ (p_{36}=3), \ 3, \ ..., \ (p_{75}=3), \ (p_{76}=4), \ 4, \ ..., \ (p_{100}=4)\}\);
OR:
\(\{0, \ 0, \ 1, \ 1, \ 1, \ 2, \ 2, \ ..., \ (p_{35}=2), \ (p_{36}=3), \ 3, \ ..., \ (p_{75}=3), \ (p_{76}=4), \ 5, \ 7, \ 27, \ ..., \ (p_{100}=10000)\}\) (of course there are a lot of other breakdowns).

In any case median=3.

Hope it's clear.

P.S. Please post PS questions in the PS subforum: gmat-problem-solving-ps-140/ and DS questions in the DS subforum: gmat-data-sufficiency-ds-141/ No posting of PS/DS questions is allowed in the main Math forum.



I Did not understand this. How can you deduce about the 40% of the projects based on the information given. The problem just says 25% of the projects have 4 or more. 35% of the projects have 2 or less. So it does not talk anything about 40%. 40 % can be 5,6,7 or anything right?? Could you explain it in detail.
_________________

I've failed over and over and over again in my life and that is why I succeed--Michael Jordan
Kudos drives a person to better himself every single time. So Pls give it generously
Wont give up till i hit a 700+

Expert Post
1 KUDOS received
Math Expert
User avatar
Joined: 02 Sep 2009
Posts: 29090
Followers: 4720

Kudos [?]: 49594 [1] , given: 7395

Re: What is the median number of employees assigned per project [#permalink] New post 27 Dec 2012, 09:37
1
This post received
KUDOS
Expert's post
1
This post was
BOOKMARKED
rajathpanta wrote:
Bunuel wrote:
ITIZCODE wrote:
What is the median number of employees assigned per project for the projects at Company Z?

(1) 25 percent of the projects at Company Z have 4 or more employees assigned to each project.
(2) 35 percent of the projects at Company Z have 2 or fewer employees assigned to each project


What is the median number of employees assigned per project for the projects at Company Z?

(1) 25 percent of the projects at Company Z have 4 or more employees assigned to each project. Not sufficient on its own.

(2) 35 percent of the projects at Company Z have 2 or fewer employees assigned to each project. Not sufficient on its own.

(1)+(2) Since 35% of of the projects have 2 or fewer (\(\leq{2}\))employees and 25% of the projects have 4 or more (\(\geq{4}\)) employees, then 100%-(25%+35%)=40% of the projects have exactly 3 employees assigned to each of them. So, the median number of employees assigned per project is 3. Sufficient.

Answer: C.




To elaborate more: consider there are 100 projects: \(\{p_1, \ p_2, \ ... , \ p_{100}\}\). The values of \(p_1\) to \(p_{35}\) will be 0, 1, or 2; the values of \(p_{36}\) to \(p_{75}\) will be exactly 3; the values of \(p_{76}\) to \(p_{100}\) will be 4 or more. \(Median=\frac{p_{50}+p_{51}}{2}=\frac{3+3}{2}=3\).

For example list can be: \(\{2, \ 2, \ 2, \ ..., \ (p_{35}=2), \ (p_{36}=3), \ 3, \ ..., \ (p_{75}=3), \ (p_{76}=4), \ 4, \ ..., \ (p_{100}=4)\}\);
OR:
\(\{0, \ 0, \ 1, \ 1, \ 1, \ 2, \ 2, \ ..., \ (p_{35}=2), \ (p_{36}=3), \ 3, \ ..., \ (p_{75}=3), \ (p_{76}=4), \ 5, \ 7, \ 27, \ ..., \ (p_{100}=10000)\}\) (of course there are a lot of other breakdowns).

In any case median=3.

Hope it's clear.

P.S. Please post PS questions in the PS subforum: gmat-problem-solving-ps-140/ and DS questions in the DS subforum: gmat-data-sufficiency-ds-141/ No posting of PS/DS questions is allowed in the main Math forum.



I Did not understand this. How can you deduce about the 40% of the projects based on the information given. The problem just says 25% of the projects have 4 or more. 35% of the projects have 2 or less. So it does not talk anything about 40%. 40 % can be 5,6,7 or anything right?? Could you explain it in detail.


35 of the projects have 2 or fewer employees.
25 of the projects have 4 or more employees.

How many employees can be assigned to the remaining 40 projects? The ranges \(\leq{2}\) and \(\geq{4}\) are covered, thus the remaining 40 projects have 3 employees assigned to them.

Hope it's clear.
_________________

NEW TO MATH FORUM? PLEASE READ THIS: ALL YOU NEED FOR QUANT!!!

PLEASE READ AND FOLLOW: 12 Rules for Posting!!!

RESOURCES: [GMAT MATH BOOK]; 1. Triangles; 2. Polygons; 3. Coordinate Geometry; 4. Factorials; 5. Circles; 6. Number Theory; 7. Remainders; 8. Overlapping Sets; 9. PDF of Math Book; 10. Remainders; 11. GMAT Prep Software Analysis ; 12. SEVEN SAMURAI OF 2012 (BEST DISCUSSIONS) ; 12. Tricky questions from previous years.

COLLECTION OF QUESTIONS:
PS: 1. Tough and Tricky questions; 2. Hard questions; 3. Hard questions part 2; 4. Standard deviation; 5. Tough Problem Solving Questions With Solutions; 6. Probability and Combinations Questions With Solutions; 7 Tough and tricky exponents and roots questions; 8 12 Easy Pieces (or not?); 9 Bakers' Dozen; 10 Algebra set. ,11 Mixed Questions, 12 Fresh Meat

DS: 1. DS tough questions; 2. DS tough questions part 2; 3. DS tough questions part 3; 4. DS Standard deviation; 5. Inequalities; 6. 700+ GMAT Data Sufficiency Questions With Explanations; 7 Tough and tricky exponents and roots questions; 8 The Discreet Charm of the DS ; 9 Devil's Dozen!!!; 10 Number Properties set., 11 New DS set.


What are GMAT Club Tests?
25 extra-hard Quant Tests

GMAT Club Premium Membership - big benefits and savings

2 KUDOS received
Manager
Manager
avatar
Joined: 13 Oct 2012
Posts: 78
Concentration: General Management, Leadership
Schools: IE '15 (A)
GMAT 1: 760 Q49 V46
Followers: 1

Kudos [?]: -13 [2] , given: 0

Re: What is the median number of employees assigned per project [#permalink] New post 03 Jan 2013, 22:06
2
This post received
KUDOS
1st 35% are either 1 or 2 and last 25% are 4 and above
hence 35 - 75% should be 3
Current Student
avatar
Joined: 10 Oct 2012
Posts: 4
Followers: 0

Kudos [?]: 0 [0], given: 5

GMAT ToolKit User
Re: What is the median number of employees assigned per project [#permalink] New post 13 Apr 2013, 02:02
Aren't we assuming here that, statement 1 and 2 refer to highest 25 and bottom 35 percent of the employees, couldn't it be first 35 % then the next 25% and the remaining 40% with unknown number of employees per project, then the median will lie in 4 or more employees, we do not have any particular value and hence E as the correct answer.
2 KUDOS received
VP
VP
User avatar
Status: Far, far away!
Joined: 02 Sep 2012
Posts: 1125
Location: Italy
Concentration: Finance, Entrepreneurship
GPA: 3.8
Followers: 149

Kudos [?]: 1481 [2] , given: 219

GMAT ToolKit User
Re: What is the median number of employees assigned per project [#permalink] New post 13 Apr 2013, 02:14
2
This post received
KUDOS
raxsin12 wrote:
Aren't we assuming here that, statement 1 and 2 refer to highest 25 and bottom 35 percent of the employees, couldn't it be first 35 % then the next 25% and the remaining 40% with unknown number of employees per project, then the median will lie in 4 or more employees, we do not have any particular value and hence E as the correct answer.


Statement 2 and 1 must refer to the bottom and to the highest part.
"couldn't it be first 35 % then the next 25% and the remaining 40%"? NO.
The first 35% have 2 or fewer (till here correct), but then your reasoning goes against the info in statement 1.
What you are saying is that 25%+40%=65% has 4 or more employees => wrong, look at statement 1:
(1) 25 percent of the projects at Company Z have 4 or more employees assigned to each project.

Hope it's clear

P.S: Welcome to GMAT Club!
_________________

It is beyond a doubt that all our knowledge that begins with experience.

Kant , Critique of Pure Reason

Tips and tricks: Inequalities , Mixture | Review: MGMAT workshop
Strategy: SmartGMAT v1.0 | Questions: Verbal challenge SC I-II- CR New SC set out !! , My Quant

Rules for Posting in the Verbal Forum - Rules for Posting in the Quant Forum[/size][/color][/b]

Current Student
avatar
Joined: 10 Oct 2012
Posts: 4
Followers: 0

Kudos [?]: 0 [0], given: 5

GMAT ToolKit User
Re: What is the median number of employees assigned per project [#permalink] New post 13 Apr 2013, 02:37
Thanks for the welcome and the explanation! Its clear now.....
Intern
Intern
avatar
Joined: 19 Oct 2013
Posts: 6
GMAT Date: 01-13-2014
Followers: 0

Kudos [?]: 1 [0], given: 2

Re: What is the median number of employees assigned per project [#permalink] New post 19 Oct 2013, 10:02
Hi,

i understand the answers, although i must say there is no information that says that no percentage has more than for example 5 employees per project. It could be possible to have a 25% with 4 or more, and from there a group that has 5 or more. Both equalities would still be right. For example a 25% thats has 4 or more, and only 15% that has 5 or more. A group within a group. I hope i made myself clear...
In that case the answer for me would be "e"

thank you in advance,
Intern
Intern
avatar
Joined: 19 Oct 2013
Posts: 6
GMAT Date: 01-13-2014
Followers: 0

Kudos [?]: 1 [0], given: 2

Re: What is the median number of employees assigned per project [#permalink] New post 19 Oct 2013, 10:13
versuchmachtklug wrote:
Hi,

i understand the answers, although i must say there is no information that says that no percentage has more than for example 5 employees per project. It could be possible to have a 25% with 4 or more, and from there a group that has 5 or more. Both equalities would still be right. For example a 25% thats has 4 or more, and only 15% that has 5 or more. A group within a group. I hope i made myself clear...
In that case the answer for me would be "e"

thank you in advance,



JUST GOT IT!! saying it loud helped me..thanks anyways
1 KUDOS received
Manager
Manager
avatar
Joined: 18 May 2014
Posts: 63
Location: United States
Concentration: General Management, Other
GMAT Date: 07-31-2014
GPA: 3.99
WE: Analyst (Consulting)
Followers: 0

Kudos [?]: 9 [1] , given: 6

Re: What is the median number of employees assigned per project [#permalink] New post 18 May 2014, 09:57
1
This post received
KUDOS
Statement (1) by itself is insufficient because we have no clue how the rest of the employees are assigned... same problem with statement (2).

When we combine the statement, we know that all the other projects have 3 employees assigned to each of them. If we were to write out the list, "3" would cover the middle terms, so it will end up being the median of the set.
Hence C.
GMAT Club Legend
GMAT Club Legend
User avatar
Joined: 09 Sep 2013
Posts: 6079
Followers: 340

Kudos [?]: 68 [0], given: 0

Premium Member
Re: What is the median number of employees assigned per project [#permalink] New post 16 Jun 2015, 11:13
Hello from the GMAT Club BumpBot!

Thanks to another GMAT Club member, I have just discovered this valuable topic, yet it had no discussion for over a year. I am now bumping it up - doing my job. I think you may find it valuable (esp those replies with Kudos).

Want to see all other topics I dig out? Follow me (click follow button on profile). You will receive a summary of all topics I bump in your profile area as well as via email.
_________________

GMAT Books | GMAT Club Tests | Best Prices on GMAT Courses | GMAT Mobile App | Math Resources | Verbal Resources

Senior Manager
Senior Manager
User avatar
Joined: 10 Mar 2013
Posts: 292
Location: Germany
Concentration: Finance, Entrepreneurship
GMAT Date: 05-27-2015
GPA: 3.88
WE: Information Technology (Consulting)
Followers: 2

Kudos [?]: 31 [0], given: 194

GMAT ToolKit User
Re: What is the median number of employees assigned per project [#permalink] New post 20 Aug 2015, 13:36
I've solved it this way (see attachment) -> the mid section of 40% =3 (it must be an integer, you cannot have fractions when dealing with persons ;) So Statement 1+2 are sufficient (C)
Attachments

PS 139.png
PS 139.png [ 22.89 KiB | Viewed 240 times ]


_________________

When you’re up, your friends know who you are. When you’re down, you know who your friends are.

Share some Kudos, if my posts help you. Thank you !

Re: What is the median number of employees assigned per project   [#permalink] 20 Aug 2015, 13:36
    Similar topics Author Replies Last post
Similar
Topics:
5 Experts publish their posts in the topic What is the median number of books purchased per student in goodyear2013 4 24 Mar 2014, 14:29
3 What is the median number of employees assigned per project GMATD11 4 27 Jul 2011, 07:10
5 Experts publish their posts in the topic What is the median number of employees assigned per project MitDavidDv 5 29 Jun 2011, 11:04
1 Experts publish their posts in the topic What is the median number of employees assigned per project nilesh376 16 17 Apr 2010, 08:00
4 Experts publish their posts in the topic What is the median number of employees assigned per project TheBigCheese 7 05 Jul 2008, 11:01
Display posts from previous: Sort by

What is the median number of employees assigned per project

  Question banks Downloads My Bookmarks Reviews Important topics  


GMAT Club MBA Forum Home| About| Privacy Policy| Terms and Conditions| GMAT Club Rules| Contact| Sitemap

Powered by phpBB © phpBB Group and phpBB SEO

Kindly note that the GMAT® test is a registered trademark of the Graduate Management Admission Council®, and this site has neither been reviewed nor endorsed by GMAC®.