Find all School-related info fast with the new School-Specific MBA Forum

It is currently 20 Oct 2014, 16:35

Close

GMAT Club Daily Prep

Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History

Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.

Events & Promotions

Events & Promotions in June
Open Detailed Calendar

Working Machines

  Question banks Downloads My Bookmarks Reviews Important topics  
Author Message
TAGS:
Manager
Manager
User avatar
Joined: 22 Jul 2008
Posts: 95
Location: Bangalore,Karnataka
Followers: 3

Kudos [?]: 59 [0], given: 11

Working Machines [#permalink] New post 30 Nov 2009, 06:57
00:00
A
B
C
D
E

Difficulty:

(N/A)

Question Stats:

50% (08:34) correct 50% (02:11) wrong based on 12 sessions
I guess a similar question was posted by Bunuel sometime back.. anyhow here it is

Machines A, B, and C can either load nails into a bin or unload nails from that bin. Each machine works at a constant rate that is the same for loading and for unloading, although the individual machines may have different rates. Working together to load at their respective constant rates, machines A and B can load the bin in 6 minutes. Likewise, working together to load at their respective constant rates, machines B and C can load the bin in 9 minutes. How long will it take machine A to load the bin if machine C is simultaneously unloading the bin?
(A) 12 minutes
(B) 15 minutes
(C) 18 minutes
(D) 36 minutes
(E) 54 minutes

Last edited by kirankp on 30 Nov 2009, 08:01, edited 1 time in total.
VP
VP
avatar
Joined: 05 Mar 2008
Posts: 1477
Followers: 11

Kudos [?]: 201 [0], given: 31

Re: Working Machines [#permalink] New post 30 Nov 2009, 07:18
kirankp wrote:
I guess a similar question was posted by Bunel sometime back.. anyhow here it is

Machines A, B, and C can either load nails into a bin or unload nails from that bin. Each machine works at a constant rate that is the same for loading and for unloading, although the individual machines may have different rates. Working together to load at their respective constant rates, machines A and B can load the bin in 6 minutes. Likewise, working together to load at their respective constant rates, machines B and C can load the bin in 9 minutes. How long will it take machine A to load the bin if machine C is simultaneously unloading the bin?
(A) 12 minutes
(B) 15 minutes
(C) 18 minutes
(D) 36 minutes
(E) 54 minutes


answer C

A and B together = 1/a + 1/b = 1/6

B and C together = 1/b + 1/c = 1/9

We need to know the answer to 1/a - 1/c

From equation 2: 1/b = 1/9 - 1/c
substitute into equation 1

1/a + 1/9 - 1/c = 1/6
1/a - 1/c = 1/18

18 minutes
Re: Working Machines   [#permalink] 30 Nov 2009, 07:18
    Similar topics Author Replies Last post
Similar
Topics:
If two copying machines work simultaneously at their gurpreet07 9 08 Sep 2009, 11:35
Six machines each working at the same ritula 5 13 Nov 2008, 02:46
Work Problem - Machines above720 1 16 May 2007, 17:26
If two cappachino machines work simultaneously at their joemama142000 2 16 Jan 2006, 00:12
If two copying machines work simultaneously at their pb_india 7 23 Feb 2005, 19:31
Display posts from previous: Sort by

Working Machines

  Question banks Downloads My Bookmarks Reviews Important topics  


GMAT Club MBA Forum Home| About| Privacy Policy| Terms and Conditions| GMAT Club Rules| Contact| Sitemap

Powered by phpBB © phpBB Group and phpBB SEO

Kindly note that the GMAT® test is a registered trademark of the Graduate Management Admission Council®, and this site has neither been reviewed nor endorsed by GMAC®.