Last visit was: 24 Apr 2024, 11:49 It is currently 24 Apr 2024, 11:49

Close
GMAT Club Daily Prep
Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Close
Request Expert Reply
Confirm Cancel
SORT BY:
Date
Tags:
Show Tags
Hide Tags
avatar
Intern
Intern
Joined: 22 Apr 2009
Posts: 2
Own Kudos [?]: 62 [62]
Given Kudos: 1
Send PM
Most Helpful Reply
Math Expert
Joined: 02 Sep 2009
Posts: 92902
Own Kudos [?]: 618789 [38]
Given Kudos: 81588
Send PM
avatar
Intern
Intern
Joined: 04 Oct 2005
Posts: 3
Own Kudos [?]: 40 [35]
Given Kudos: 0
Send PM
General Discussion
User avatar
VP
VP
Joined: 09 Dec 2008
Posts: 1221
Own Kudos [?]: 254 [4]
Given Kudos: 17
Concentration: Health Enterprise Management, Marketing, Strategy, Finance, Analytical Consulting, Economics
Schools:Kellogg Class of 2011
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
4
Kudos
johnnybravo86 wrote:
Please help me solve this problem

A husband and wife, started painting their house, but husband left painting 5 days before the completion of the work. How many days will it take to complete the work, which the husband alone would have completed in 20 days and wife in 15 days?

a) 40/7 b)50/7 c)75/7 d) 55/7


It's a multiple step problem: 1) figure out how many days (D) it would take the husband and wife to complete the job working together, 2) figure out how much of the house would be painted in D-5 days, 3) figure out how long it would take the wife to paint the remaining portion

1. How many days would it take the husband and wife to complete the house working together?

Each day, the husband can paint 1/20 of the house, and the wife can paint 1/15 of the house, so combined they can paint (1/20 + 1/15 = 7/60) of the house.

At that rate it would take them 60/7 days to complete the house. (7/60 house/day * 60/7 days = 1 house)

2. How much of the house can they paint in D-5 days?

(D-5 = 60/7 - 35/7 = 25/7) If working together they paint 7/60 of the house per day, then in D-5 days they could paint:

7/60 house/day * 25/7 days = 175/420 = 5/12 of the house will be painted in D-5 days.

3. How long will it take the wife, working alone, to paint this portion of the house?

The wife can paint 1/15 of the house each day, and there is 5/12 of the house that needs to be painted, so it would take her (5/12) / (1/15) = 25/4 days.

Well, I've checked my math a few times and came up with the same answer, which isn't one of the options presented. Where did the question come from?
User avatar
Manager
Manager
Joined: 08 Jan 2009
Posts: 144
Own Kudos [?]: 305 [19]
Given Kudos: 5
Concentration: International business
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
13
Kudos
6
Bookmarks
H take 20 days = 1
W take 15 days = 1
H one day work = 1/20 and W one day work = 1/15

H + W one day work = 1/20 + 1/15 = 7/60.

In a total of T day H+W worked for T-5 and W alone for 5

(7/60) (T-5) + 1/15 * 5 = 1 therefore T = 75/7

Ans : C
User avatar
Intern
Intern
Joined: 10 Jul 2009
Posts: 17
Own Kudos [?]: 36 [1]
Given Kudos: 4
 Q45  V38
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
1
Bookmarks
dhushan wrote:
tkarthi4u wrote:
H take 20 days = 1
W take 15 days = 1
H one day work = 1/20 and W one day work = 1/15

H + W one day work = 1/20 + 1/15 = 7/60.

In a total of T day H+W worked for T-5 and W alone for 5

(7/60) (T-5) + 1/15 * 5 = 1 therefore T = 75/7

Ans : C


Hey guys, can someone explain to my why it (1/5*5) since the question is asking how long it will take to complete the work. I would assume that if it is the women alone, it would now take longer than 5 days to complete the paint job?


I agree with you dhushan, the structure of the question is vague. It should have asked "how long did it take to complete the housing painting?" Cause my understanding of the question also narrowed down to how many days will it take the wife to complete the job.
I doubt that GMAC will structure the question the same way.
RC & DI Moderator
Joined: 02 Aug 2009
Status:Math and DI Expert
Posts: 11169
Own Kudos [?]: 31889 [9]
Given Kudos: 290
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
3
Kudos
6
Bookmarks
Expert Reply

consider this:-



husband 1 day work=1/20.....
wife 1 day work=1/15..
combined 1 day work=1/20+1/15=7/60

last 5 days wife worked alone , so fraction of work completed by her in those 5 days=5*1/15=1/3..
remaining work was completed by both ..
so time taken=(fraction of work left)/(combined 1 day work)=(2/3)/(7/60)..
or (2*60)/(3*7)=40/7...
total days=5+40/7=75/7...
User avatar
Intern
Intern
Joined: 11 Sep 2009
Posts: 34
Own Kudos [?]: 79 [2]
Given Kudos: 0
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
2
Kudos
Sol1 :
First, in 5 days, the wife work 5/15 or 1/3 of the job
Then, together, they use (2/3)(60/7) = 40/7 days to finish 2/3 of the job
Thus, in total, use 75/7

Sol2: together, they use 60/7 days to finish the job. Thus, if the husband stops working, it has to take more than 60/7 days to finish the job.
avatar
Intern
Intern
Joined: 27 Jan 2012
Posts: 1
Own Kudos [?]: 1 [1]
Given Kudos: 0
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
1
Kudos
x = total time of work

x-5/20 = husband's work time
x/15 = wife's work time

x-5/20 + x/15 = total work time for wife, when working together

3x-15/60 + 4x/60= 1

7x-15=60

7x=75

x=75/7
User avatar
Intern
Intern
Joined: 17 Jan 2012
Posts: 39
Own Kudos [?]: 807 [0]
Given Kudos: 16
GMAT 1: 610 Q43 V31
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
Bunuel wrote:
A husband and wife, started painting their house, but husband left painting 5 days before the completion of the work. How many days will it take to complete the work, which the husband alone would have completed in 20 days and wife in 15 days?
A. 40/7
B. 50/7
C. 75/7
D. 55/7

As pointed out above there are several ways to solve this problem. Below are probably two shortest approaches:

Approach #1:
Rate of husband \(\frac{1}{20}\) job/day;
Rate of wife \(\frac{1}{15}\) job/day;
Combined rate: \(\frac{1}{20}+\frac{1}{15}=\frac{7}{60}\) job/day;

During the last 5 days, when the wife worked alone, she completed \(\frac{5}{15}=\frac{1}{3}\)rd of the job;
Hence, remaining \(\frac{2}{3}\)rd of the job was done by them working together in \(time=\frac{job'}{rate}=\frac{(\frac{2}{3})}{(\frac{7}{60})}=\frac{40}{7}\) days;

Total time needed to complete the whole job: \(5+\frac{40}{7}=\frac{75}{7}\) days.

Answer: C.

Approach #2:
It's based on observing the answer choices. On the PS section always look at the answer choices before you start to solve a problem. They might often give you a clue on how to approach the question.

Combined rate of the husband and wife is \(\frac{7}{60}\) job/day, which means that working together they'll complete the job in \(\frac{60}{7}\) days (time is reciprocal of rate). As they worked together only some part of the total time, then actual time would be more than \(\frac{60}{7}\) days. Only \(\frac{75}{7}\) is more than this value (answer choice C), so it must be correct.

Answer: C.

Hope it helps.


The question say the husband left the job 5 days back. Then it is never mentioned that he has re-joined. WIth the current wording, doesn't it imply that its only the wife who is going to complete the job . And if thats the case it would take her 15 days as the question itself mentions... May be its just some missing part in the question.
Math Expert
Joined: 02 Sep 2009
Posts: 92902
Own Kudos [?]: 618789 [0]
Given Kudos: 81588
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
Expert Reply
docabuzar wrote:
The question say the husband left the job 5 days back. Then it is never mentioned that he has re-joined. WIth the current wording, doesn't it imply that its only the wife who is going to complete the job . And if thats the case it would take her 15 days as the question itself mentions... May be its just some missing part in the question.


It seems that you misinterpreted the question. We are told that: "a husband and wife, started painting, but husband left 5 days before the completion of the work". So the husband worked 5 fewer days than the wife (he didn't rejoin).

Next, part of the question just tells us the individual rates of the husband and the wife: the husband alone can complete the painting in 20 days and wife in 15 days.

The actual time it took for them to complete the painting would obviously be less than 15 as the part of the time they were working together.

Hope it's clear.
User avatar
Intern
Intern
Joined: 17 Jan 2012
Posts: 39
Own Kudos [?]: 807 [0]
Given Kudos: 16
GMAT 1: 610 Q43 V31
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
Bunuel wrote:
docabuzar wrote:
The question say the husband left the job 5 days back. Then it is never mentioned that he has re-joined. WIth the current wording, doesn't it imply that its only the wife who is going to complete the job . And if thats the case it would take her 15 days as the question itself mentions... May be its just some missing part in the question.


It seems that you misinterpreted the question. We are told that: "a husband and wife, started painting, but husband left 5 days before the completion of the work". So the husband worked 5 fewer days than the wife (he didn't rejoined).

Next, part of the question just tells us the individual rates of the husband and the wife: the husband alone can complete the painting in 20 days and wife in 15 days.

The actual time it took for them to complete the painting would obviously be less than 15 as the part of the time they were working together.

Hope it's clear.


Thanks for the explanation.

Actually what I interpreted from the last part of the question is - the times given (20 days & 15 days) would be required to complete the "remaining part of job" and not the complete job.

Do you think what i interpreted can be the case. ?
Math Expert
Joined: 02 Sep 2009
Posts: 92902
Own Kudos [?]: 618789 [0]
Given Kudos: 81588
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
Expert Reply
docabuzar wrote:
Thanks for the explanation.

Actually what I interpreted from the last part of the question is - the times given (20 days & 15 days) would be required to complete the "remaining part of job" and not the complete job.

Do you think what i interpreted can be the case. ?


We are told that " husband left painting 5 days before the completion of the work (by wife)", so wife needed 5 days to complete the remaining job, not 15. So, your interpretation can not be correct.
Math Expert
Joined: 02 Sep 2009
Posts: 92902
Own Kudos [?]: 618789 [0]
Given Kudos: 81588
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
Expert Reply
Bumping for review and further discussion*. Get a kudos point for an alternative solution!

*New project from GMAT Club!!! Check HERE

To find DS questions by Kudos, sort by Kudos here: gmat-data-sufficiency-ds-141/
To find PS questions by Kudos, sort by Kudos here: gmat-problem-solving-ps-140/
Director
Director
Joined: 17 Dec 2012
Posts: 589
Own Kudos [?]: 1519 [1]
Given Kudos: 20
Location: India
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
1
Kudos
Expert Reply
johnnybravo86 wrote:
A husband and wife, started painting their house, but husband left painting 5 days before the completion of the work. How many days will it take to complete the work, which the husband alone would have completed in 20 days and wife in 15 days?

A. 40/7
B. 50/7
C. 75/7
D. 55/7


1. In a normal scenario both the husband and wife would have taken 1/ (1/15+ 1/20) days = 60/7 days to complete the task
2. what did not happen was they definitely did not work together for 5 days. So subtract 5 days work together =5*7/60 = 7/12 th of the work
3. what did happen was the wife definitely worked alone for 5 days. So add 5 days of work of the wife = 5/15 = 1/3 rd of the work= 4/12 th of the work
4. From (2) and (3) we see 7/12- 4/12 = 3/12 th or 1/4 th of the work still remains.
5. this additional 1/4 th work would have been done by both because the wife worked alone for only 5 days which we have accounted for. So time taken for this work is 1/4 * 60/7 =15/7
6. Total time taken to complete the whole work in the altered scenario is 60/7 + 15/7 = 75/7
User avatar
Manager
Manager
Joined: 26 Sep 2013
Posts: 151
Own Kudos [?]: 598 [0]
Given Kudos: 40
Concentration: Finance, Economics
GMAT 1: 670 Q39 V41
GMAT 2: 730 Q49 V41
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
Bunuel wrote:
A husband and wife, started painting their house, but husband left painting 5 days before the completion of the work. How many days will it take to complete the work, which the husband alone would have completed in 20 days and wife in 15 days?
A. 40/7
B. 50/7
C. 75/7
D. 55/7

As pointed out above there are several ways to solve this problem. Below are probably two shortest approaches:

Approach #1:
Rate of husband \(\frac{1}{20}\) job/day;
Rate of wife \(\frac{1}{15}\) job/day;
Combined rate: \(\frac{1}{20}+\frac{1}{15}=\frac{7}{60}\) job/day;

During the last 5 days, when the wife worked alone, she completed \(\frac{5}{15}=\frac{1}{3}\)rd of the job;
Hence, remaining \(\frac{2}{3}\)rd of the job was done by them working together in \(time=\frac{job'}{rate}=\frac{(\frac{2}{3})}{(\frac{7}{60})}=\frac{40}{7}\) days;

Total time needed to complete the whole job: \(5+\frac{40}{7}=\frac{75}{7}\) days.

Answer: C.

Approach #2:
It's based on observing the answer choices. On the PS section always look at the answer choices before you start to solve a problem. They might often give you a clue on how to approach the question.

Combined rate of the husband and wife is \(\frac{7}{60}\) job/day, which means that working together they'll complete the job in \(\frac{60}{7}\) days (time is reciprocal of rate). As they worked together only some part of the total time, then actual time would be more than \(\frac{60}{7}\) days. Only \(\frac{75}{7}\) is more than this value (answer choice C), so it must be correct.

Answer: C.

Hope it helps.



Could you possibly help me figure out why my method didn't work for solving:

I combined their two rates, and came up with \(\frac{7}{60}\) per day, so the whole job, combined, would have taken them \(\frac{60}{7}\), or 8 4/7 days to complete. The husband left 5 days before this, so they worked together for 3 4/7 days, or \(\frac{25}{7}\). The amount of work they completed was \(\frac{7}{60}\)* \(\frac{25}{7}\)=25/60 of the job. This leaves \(\frac{35}{60}\)of the job for the wife to complete alone. She can work at a rate of 4/60 per day. So that means she completed the remaining 35/60 in 8 3/4 days, not 5. This combined with the 3 4/7 that they worked on it together gives you a number of about 12.32, which is obviously not correct. Where did I go wrong? I'm having trouble reconciling how the wife only needed 5 days working at the rate given, when we can see how much work they did combined, and it leaves more than 5 days worth of work for her.
Math Expert
Joined: 02 Sep 2009
Posts: 92902
Own Kudos [?]: 618789 [1]
Given Kudos: 81588
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
1
Kudos
Expert Reply
AccipiterQ wrote:
Bunuel wrote:
A husband and wife, started painting their house, but husband left painting 5 days before the completion of the work. How many days will it take to complete the work, which the husband alone would have completed in 20 days and wife in 15 days?
A. 40/7
B. 50/7
C. 75/7
D. 55/7

As pointed out above there are several ways to solve this problem. Below are probably two shortest approaches:

Approach #1:
Rate of husband \(\frac{1}{20}\) job/day;
Rate of wife \(\frac{1}{15}\) job/day;
Combined rate: \(\frac{1}{20}+\frac{1}{15}=\frac{7}{60}\) job/day;

During the last 5 days, when the wife worked alone, she completed \(\frac{5}{15}=\frac{1}{3}\)rd of the job;
Hence, remaining \(\frac{2}{3}\)rd of the job was done by them working together in \(time=\frac{job'}{rate}=\frac{(\frac{2}{3})}{(\frac{7}{60})}=\frac{40}{7}\) days;

Total time needed to complete the whole job: \(5+\frac{40}{7}=\frac{75}{7}\) days.

Answer: C.

Approach #2:
It's based on observing the answer choices. On the PS section always look at the answer choices before you start to solve a problem. They might often give you a clue on how to approach the question.

Combined rate of the husband and wife is \(\frac{7}{60}\) job/day, which means that working together they'll complete the job in \(\frac{60}{7}\) days (time is reciprocal of rate). As they worked together only some part of the total time, then actual time would be more than \(\frac{60}{7}\) days. Only \(\frac{75}{7}\) is more than this value (answer choice C), so it must be correct.

Answer: C.

Hope it helps.



Could you possibly help me figure out why my method didn't work for solving:

I combined their two rates, and came up with \(\frac{7}{60}\) per day, so the whole job, combined, would have taken them \(\frac{60}{7}\), or 8 4/7 days to complete. The husband left 5 days before this, so they worked together for 3 4/7 days, or \(\frac{25}{7}\). The amount of work they completed was \(\frac{7}{60}\)* \(\frac{25}{7}\)=25/60 of the job. This leaves \(\frac{35}{60}\)of the job for the wife to complete alone. She can work at a rate of 4/60 per day. So that means she completed the remaining 35/60 in 8 3/4 days, not 5. This combined with the 3 4/7 that they worked on it together gives you a number of about 12.32, which is obviously not correct. Where did I go wrong? I'm having trouble reconciling how the wife only needed 5 days working at the rate given, when we can see how much work they did combined, and it leaves more than 5 days worth of work for her.


If they work together they can complete the job in 60/7 days. But if one of them does not work for all that period then the time to complete would increase. Thus you cannot say that when husband left 5 days before, then they worked together for 60/7-5 days.

Hope it's clear.
Current Student
Joined: 09 Jul 2015
Posts: 25
Own Kudos [?]: 72 [0]
Given Kudos: 53
Location: India
Concentration: Finance
GMAT 1: 690 Q50 V32
GMAT 2: 750 Q51 V40
GPA: 3.58
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
Bunuel wrote:
Bumping for review and further discussion*. Get a kudos point for an alternative solution!

*New project from GMAT Club!!! Check HERE

To find DS questions by Kudos, sort by Kudos here: gmat-data-sufficiency-ds-141/
To find PS questions by Kudos, sort by Kudos here: gmat-problem-solving-ps-140/



Hi Bunuel

Please help !!

Together they will finish the work in 60/7 days

Husband left 5 days before the completion. Therefore, he left 5/20 = 1/4 of the work for his wife.

Wife will complete 1/4 of the work in 15/4 days

Total days needed to complete the work = 60/7 + 15/4 = 345/28 days
RC & DI Moderator
Joined: 02 Aug 2009
Status:Math and DI Expert
Posts: 11169
Own Kudos [?]: 31889 [1]
Given Kudos: 290
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
1
Kudos
Expert Reply
subhamgarg91 wrote:
Bunuel wrote:
Bumping for review and further discussion*. Get a kudos point for an alternative solution!

*New project from GMAT Club!!! Check HERE

To find DS questions by Kudos, sort by Kudos here: gmat-data-sufficiency-ds-141/
To find PS questions by Kudos, sort by Kudos here: gmat-problem-solving-ps-140/



Hi Bunuel

Please help !!

Together they will finish the work in 60/7 days

Husband left 5 days before the completion. Therefore, he left 5/20 = 1/4 of the work for his wife.

Wife will complete 1/4 of the work in 15/4 days

Total days needed to complete the work = 60/7 + 15/4 = 345/28 days


HI,
the way you have calculated the last 5 days work is ' in the scenario where ONLY the husband was working and he left 5 days before he would have finished the work alone..
Remember both are working..and last 5 days only the wife works to finish the job..
in 5 days she would do 5/15 of the work.. so 2/3rd work was finished by BOTH with a speed of 7/60th of work per hour
Target Test Prep Representative
Joined: 14 Oct 2015
Status:Founder & CEO
Affiliations: Target Test Prep
Posts: 18754
Own Kudos [?]: 22046 [0]
Given Kudos: 283
Location: United States (CA)
Send PM
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
Expert Reply
johnnybravo86 wrote:
A husband and wife, started painting their house, but husband left painting 5 days before the completion of the work. How many days will it take to complete the work, which the husband alone would have completed in 20 days and wife in 15 days?

A. 40/7
B. 50/7
C. 75/7
D. 55/7


We are given that a husband can complete a job in 20 days by himself and a wife can complete the same job in 15 days by herself. Since the completed job = 1, and rate = work/time, the rate of the husband is 1/20 and the rate of the wife is 1/15.

We are also given that the husband and wife started painting the house and the husband left 5 days before the job was complete. If we let t = the total number of days to complete the job (or the number of days the wife worked), we can let t - 5 = the number of days that the husband worked.

Since work = rate x time:

work of husband = (1/20)(t - 5) = (t - 5)/20

work of wife = (1/15)t = t/15

We can sum the two work values and set the sum equal to 1:

(t - 5)/20 + t/15 = 1

Multiplying the entire equation by 60 gives us:

3(t - 5) + 4t = 60

3t - 15 + 4t = 60

7t = 75

t = 75/7

Answer: C
GMAT Club Bot
Re: A husband and wife, started painting their house, but husband left pai [#permalink]
 1   2   
Moderators:
Math Expert
92902 posts
Senior Moderator - Masters Forum
3137 posts

Powered by phpBB © phpBB Group | Emoji artwork provided by EmojiOne