Last visit was: 23 Apr 2024, 17:42 It is currently 23 Apr 2024, 17:42

Close
GMAT Club Daily Prep
Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Close
Request Expert Reply
Confirm Cancel
SORT BY:
Kudos
Tags:
Show Tags
Hide Tags
Math Expert
Joined: 02 Sep 2009
Posts: 92883
Own Kudos [?]: 618596 [1]
Given Kudos: 81563
Send PM
e-GMAT Representative
Joined: 04 Jan 2015
Posts: 3726
Own Kudos [?]: 16831 [1]
Given Kudos: 165
Send PM
avatar
Intern
Intern
Joined: 14 Mar 2018
Posts: 9
Own Kudos [?]: 11 [0]
Given Kudos: 2
Send PM
examPAL Representative
Joined: 07 Dec 2017
Posts: 1050
Own Kudos [?]: 1777 [1]
Given Kudos: 26
Send PM
A painter was paid $800 as labor cost for painting the exterior of the [#permalink]
1
Bookmarks
Bunuel wrote:
A painter was paid $800 as labor cost for painting the exterior of the front of a house. This amount was the painter’s estimated labor cost based on a regular rate of R, in dollars per hour, for an estimated time T, in hours. However, the actual time it took for the painter to do the job was 4 hours longer than the estimated time, thereby reducing the hourly rate for the job by $10 per hour. What is R, the painter’s regular rate, in dollars per hour?

(A) 20
(B) 30
(C) 40
(D) 50
(E) 60


Instead of writing equations, we'll use the answers.
This is an Alternative approach and is especially useful if long word problems tend to confuse you.

Starting with the median - C.
If the regular rate is 40 then the regular time is 800/40 = 20. In this case the new rate was 40-10=30 and the new time was 800/30 = 80/3. Since 20 + 4 does not equal 80/3, this answer is incorrect.
Let's try the next largest answer, (D).
If the regular rate is 50 then the regular time is 800/50 = 16. In this case the new rate was 50-10=40 and the new time was 800/40 = 20. Since 16 + 4 = 20 then all our calculations work out and our answer is (D).

Note that you don't actually need to write down any equations with variables to use this approach.
Senior SC Moderator
Joined: 22 May 2016
Posts: 5330
Own Kudos [?]: 35483 [1]
Given Kudos: 9464
Send PM
Re: A painter was paid $800 as labor cost for painting the exterior of the [#permalink]
1
Bookmarks
Expert Reply
Bunuel wrote:
A painter was paid $800 as labor cost for painting the exterior of the front of a house. This amount was the painter’s estimated labor cost based on a regular rate of R, in dollars per hour, for an estimated time T, in hours. However, the actual time it took for the painter to do the job was 4 hours longer than the estimated time, thereby reducing the hourly rate for the job by $10 per hour. What is R, the painter’s regular rate, in dollars per hour?

(A) 20
(B) 30
(C) 40
(D) 50
(E) 60

Answer choices

For each answer's rate and decreased rate, find time taken.
The difference in hours should be 4.

Rate * Time = Pay, P
Thus, Time, \(T = \frac{P}{R}\)

Start with C) $40 per hour (estimated). $30 per hour (actual)

Time at $40: \(\frac{$800}{$40per.hr}= 20\) hours
Time at $30: \(\frac{$800}{$30per.hr}=\frac{80}{3}= 26.xx\) hours

800/30 is not an integer. I calculated to find out
whether $40 per hour = too high or too low

6.xx extra hours. Too great. Needs to decrease.

R and T are inversely proportional
(one increases, the other decreases)
T needs to come down. R must go up.
$40 per hour is too low

Try D) $50 per hour (estimated). $40 per hour (actual)

Time at $50: \(\frac{800}{50} = 16\) hours
Time at $40, from above = \(20\) hours

Difference? 4 hours. That's correct.

Answer D

Algebra

(Hourly pay rate) * (# hours worked) = Total pay in dollars
Same basis as \(RT = W\)
\(RT = W\), so \(T = \frac{W}{R}\)

W = 800
Estimated rate = \(r\)
Actual rate = \(r-10\)
Estimated time = \(\frac{800}{r}\)
Actual time = \(\frac{800}{r-10}\)

To find rate, \(r\), use time, which is defined in terms of \(r\)
(Actual time) - (estimated time) = \(4\) hours

\(\frac{800}{r-10} - \frac{800}{r} = 4\)

\(\frac{800r - 800(r-10)}{r(r-10)} = 4\)

\(800r - 800r + 8000 = 4* r(r-10)\)

\(8000 = 4 * r(r-10)\)

\(2000 = r^2 - 10r\)

\(r^2 - 10r - 2000 = 0\)

\((r - 50)(r + 40) = 0\)

\(r = 50\)

Answer D
Target Test Prep Representative
Joined: 04 Mar 2011
Status:Head GMAT Instructor
Affiliations: Target Test Prep
Posts: 3043
Own Kudos [?]: 6270 [0]
Given Kudos: 1646
Send PM
Re: A painter was paid $800 as labor cost for painting the exterior of the [#permalink]
Expert Reply
Bunuel wrote:
A painter was paid $800 as labor cost for painting the exterior of the front of a house. This amount was the painter’s estimated labor cost based on a regular rate of R, in dollars per hour, for an estimated time T, in hours. However, the actual time it took for the painter to do the job was 4 hours longer than the estimated time, thereby reducing the hourly rate for the job by $10 per hour. What is R, the painter’s regular rate, in dollars per hour?

(A) 20
(B) 30
(C) 40
(D) 50
(E) 60


We can create the equation:

RT = 800

T = 800/R

and

(T + 4)(R - 10) = 800

RT + 4R - 10T - 40 = 800

RT + 4R - 10T = 840

Substituting, we have:

R(800/R) + 4R - 10(800/R) = 840

800 + 4R - 8000/R = 840

4R - 8000/R = 40

Multiplying by R, we have:

4R^2 - 8000 = 40R

4R^2 - 40R - 8000 = 0

Dividing by 4, we have:

R^2 - 10R - 2000 = 0

(R - 50)(R + 40) = 0

R = 50 or R = -40

Since R can’t be negative, R = 50.

Answer: D
Manager
Manager
Joined: 10 Jun 2016
Posts: 74
Own Kudos [?]: 87 [0]
Given Kudos: 589
Location: India
Concentration: Operations, Strategy
GMAT 1: 710 Q49 V37
GPA: 3.3
WE:Project Management (Energy and Utilities)
Send PM
Re: A painter was paid $800 as labor cost for painting the exterior of the [#permalink]
Wasted my time trying to go for an algebraic solution but such questions could best be solved using options.
We know that - R*T=800.
Let C be the correct answer.
Then, R=40; T=20.

Now, T is increased by 4 hours and R is reduced by $10.
R(new) = 30; T(new) = 24. -> RT(New) = 720.

So we know that R cannot be 20 and 30 either because the decrease in number is by 10 while the increase is by 4 only. Thus, the product will get smaller.

Therefore, for easier calculations, let R=50, then T=16.
When R is reduced by $10 and T is increased by 4 hours, then R=40 and T=20.

Thus, both remain the same.

So the correct answer is 50.
GMAT Club Bot
Re: A painter was paid $800 as labor cost for painting the exterior of the [#permalink]
Moderators:
Math Expert
92883 posts
Senior Moderator - Masters Forum
3137 posts

Powered by phpBB © phpBB Group | Emoji artwork provided by EmojiOne