Last visit was: 23 Apr 2024, 13:00 It is currently 23 Apr 2024, 13:00

Close
GMAT Club Daily Prep
Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Close
Request Expert Reply
Confirm Cancel
SORT BY:
Date
Tags:
Show Tags
Hide Tags
avatar
Intern
Intern
Joined: 21 Mar 2017
Posts: 15
Own Kudos [?]: 22 [8]
Given Kudos: 6
Send PM
Retired Moderator
Joined: 22 Aug 2013
Posts: 1186
Own Kudos [?]: 2498 [2]
Given Kudos: 459
Location: India
Send PM
Target Test Prep Representative
Joined: 04 Mar 2011
Status:Head GMAT Instructor
Affiliations: Target Test Prep
Posts: 3043
Own Kudos [?]: 6270 [0]
Given Kudos: 1646
Send PM
SVP
SVP
Joined: 27 May 2012
Posts: 1680
Own Kudos [?]: 1420 [0]
Given Kudos: 632
Send PM
Re: Of the 2,500 tons of ore mined daily at a quarry, 0.4 percent results [#permalink]
michaelkalend wrote:
Of the 2,500 tons of ore mined daily at a quarry, 0.4 percent results in a certain pure metal. In how many days of mining will the total amount of pure metal produced at the quarry be equal to the daily amount of ore mined?

A 10
B 100
C 250
D 400
E 1,000


Dear Moderator,
Found this PS question, while going through the DS section of Arithmetic , hope we can move it to the proper place, Thank you.
Math Expert
Joined: 02 Sep 2009
Posts: 92882
Own Kudos [?]: 618579 [0]
Given Kudos: 81562
Send PM
Re: Of the 2,500 tons of ore mined daily at a quarry, 0.4 percent results [#permalink]
Expert Reply
stne wrote:
michaelkalend wrote:
Of the 2,500 tons of ore mined daily at a quarry, 0.4 percent results in a certain pure metal. In how many days of mining will the total amount of pure metal produced at the quarry be equal to the daily amount of ore mined?

A 10
B 100
C 250
D 400
E 1,000


Dear Moderator,
Found this PS question, while going through the DS section of Arithmetic , hope we can move it to the proper place, Thank you.

___________________
Moved to PS. Thank you.
GMAT Tutor
Joined: 24 Jun 2008
Posts: 4128
Own Kudos [?]: 9238 [0]
Given Kudos: 91
 Q51  V47
Send PM
Re: Of the 2,500 tons of ore mined daily at a quarry, 0.4 percent results [#permalink]
Expert Reply
0.4% = 4/1000 = 1/250, and if we're getting 1/250th of what we want each day, it will take 250 days.

The "2500 tons" in the question is irrelevant and there's no need to use it here.
GMAT Club Bot
Re: Of the 2,500 tons of ore mined daily at a quarry, 0.4 percent results [#permalink]
Moderators:
Math Expert
92882 posts
Senior Moderator - Masters Forum
3137 posts

Powered by phpBB © phpBB Group | Emoji artwork provided by EmojiOne