Last visit was: 25 Apr 2024, 07:52 It is currently 25 Apr 2024, 07:52

Close
GMAT Club Daily Prep
Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Close
Request Expert Reply
Confirm Cancel
SORT BY:
Date
Tags:
Show Tags
Hide Tags
Math Expert
Joined: 02 Sep 2009
Posts: 92915
Own Kudos [?]: 618952 [1]
Given Kudos: 81595
Send PM
GMATWhiz Representative
Joined: 07 May 2019
Posts: 3409
Own Kudos [?]: 1800 [2]
Given Kudos: 68
Location: India
GMAT 1: 740 Q50 V41
GMAT 2: 760 Q51 V40
Send PM
Tutor
Joined: 17 Sep 2014
Posts: 1251
Own Kudos [?]: 938 [1]
Given Kudos: 6
Location: United States
GMAT 1: 780 Q51 V45
GRE 1: Q170 V167
Send PM
Math Revolution GMAT Instructor
Joined: 16 Aug 2015
Posts: 10161
Own Kudos [?]: 16597 [2]
Given Kudos: 4
GMAT 1: 760 Q51 V42
GPA: 3.82
Send PM
Re: Working independently at their respective constant rates, machines X [#permalink]
2
Kudos
Expert Reply
Bunuel wrote:
Working independently at their respective constant rates, machines X and Y took 15 minutes to fill an order. What fraction of the order was filled by machine X?

(1) Working alone at its constant rate, machine X would have taken 60 minutes to fill the order.
(2) Working alone at its constant rate, machine Y would have taken 20 minutes to fill the order.



Forget conventional ways of solving math questions. For DS problems, the VA (Variable Approach) method is the quickest and easiest way to find the answer without actually solving the problem. Remember that equal numbers of variables and independent equations ensure a solution.
Visit https://www.mathrevolution.com/gmat/lesson for details.

The first step of the VA (Variable Approach) method is to modify the original condition and the question. We then recheck the question. We should simplify conditions if necessary.

Assume x and y are numbers of minutes that machines X and Y take to fill the order, respectively.
Then we have \(\frac{1}{15} = \frac{1}{x} + \frac{1}{y}\).

Since we have 2 variable and 1 equations, D is most likely to be the answer. So, we should consider each condition on its own first.

Condition 1)
We have \(\frac{1}{15} = \frac{1}{60} + \frac{1}{y}\) or \(\frac{1}{15} - \frac{1}{60} = \frac{1}{20} = \frac{1}{y}\).
Then we have \(y = 20\).
Thus, \(\frac{1}{x+y}/\frac{1}{x}= \frac{1}{80}/\frac{1}{20} = \frac{1}{4}\).


Since condition 1) yields a unique solution, it is sufficient.

Condition 2)
We have \(\frac{1}{15} = \frac{1}{x} + \frac{1}{20}\) or \(\frac{1}{15} - \frac{1}{20} = \frac{1}{x}\).
Then we have \(x = 60\).
Thus, \(\frac{1}{x+y}/\frac{1}{x}= \frac{1}{80}/\frac{1}{20} = \frac{1}{4}\).

Since condition 2) yields a unique solution, it is sufficient.

Therefore, D is the answer.

If the original condition includes “1 variable”, or “2 variables and 1 equation”, or “3 variables and 2 equations” etc., one more equation is required to answer the question. If each of conditions 1) and 2) provide an additional equation, there is a 59% chance that D is the answer, a 38% chance that A or B is the answer, and a 3% chance that the answer is C or E. Thus, answer D (conditions 1) and 2), when applied separately, are sufficient to answer the question) is most likely, but there may be cases where the answer is A,B,C or E.
Intern
Intern
Joined: 30 Dec 2020
Posts: 9
Own Kudos [?]: 2 [0]
Given Kudos: 21
Send PM
Re: Working independently at their respective constant rates, machines X [#permalink]
MathRevolution wrote:
Bunuel wrote:
Working independently at their respective constant rates, machines X and Y took 15 minutes to fill an order. What fraction of the order was filled by machine X?

(1) Working alone at its constant rate, machine X would have taken 60 minutes to fill the order.
(2) Working alone at its constant rate, machine Y would have taken 20 minutes to fill the order.



Forget conventional ways of solving math questions. For DS problems, the VA (Variable Approach) method is the quickest and easiest way to find the answer without actually solving the problem. Remember that equal numbers of variables and independent equations ensure a solution.
Visit https://www.mathrevolution.com/gmat/lesson for details.

The first step of the VA (Variable Approach) method is to modify the original condition and the question. We then recheck the question. We should simplify conditions if necessary.

Assume x and y are numbers of minutes that machines X and Y take to fill the order, respectively.
Then we have \(\frac{1}{15} = \frac{1}{x} + \frac{1}{y}\).

Since we have 2 variable and 1 equations, D is most likely to be the answer. So, we should consider each condition on its own first.

Condition 1)
We have \(\frac{1}{15} = \frac{1}{60} + \frac{1}{y}\) or \(\frac{1}{15} - \frac{1}{60} = \frac{1}{20} = \frac{1}{y}\).
Then we have \(y = 20\).
Thus, \(\frac{1}{x+y}/\frac{1}{x}= \frac{1}{80}/\frac{1}{20} = \frac{1}{4}\).


Since condition 1) yields a unique solution, it is sufficient.

Condition 2)
We have \(\frac{1}{15} = \frac{1}{x} + \frac{1}{20}\) or \(\frac{1}{15} - \frac{1}{20} = \frac{1}{x}\).
Then we have \(x = 60\).
Thus, \(\frac{1}{x+y}/\frac{1}{x}= \frac{1}{80}/\frac{1}{20} = \frac{1}{4}\).

Since condition 2) yields a unique solution, it is sufficient.

Therefore, D is the answer.

If the original condition includes “1 variable”, or “2 variables and 1 equation”, or “3 variables and 2 equations” etc., one more equation is required to answer the question. If each of conditions 1) and 2) provide an additional equation, there is a 59% chance that D is the answer, a 38% chance that A or B is the answer, and a 3% chance that the answer is C or E. Thus, answer D (conditions 1) and 2), when applied separately, are sufficient to answer the question) is most likely, but there may be cases where the answer is A,B,C or E.



Can you please explain that whilst you have put the formula as 1/X+Y / 1/X why have you used value of X as 20 min when the value of X is 60 min
MBA House Admissions Consultant
Joined: 26 May 2022
Posts: 343
Own Kudos [?]: 70 [0]
Given Kudos: 0
Send PM
Re: Working independently at their respective constant rates, machines X [#permalink]
Expert Reply
Work problems can be solved by the rate - work/time concept.
Attachments

9AE361B7-4F53-4850-B2B2-688883AB67FF.jpeg
9AE361B7-4F53-4850-B2B2-688883AB67FF.jpeg [ 904.59 KiB | Viewed 1617 times ]

GMAT Club Bot
Re: Working independently at their respective constant rates, machines X [#permalink]
Moderator:
Math Expert
92914 posts

Powered by phpBB © phpBB Group | Emoji artwork provided by EmojiOne