Last visit was: 25 Apr 2024, 14:27 It is currently 25 Apr 2024, 14:27

Close
GMAT Club Daily Prep
Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Close
Request Expert Reply
Confirm Cancel
SORT BY:
Date
Tags:
Show Tags
Hide Tags
Math Expert
Joined: 02 Sep 2009
Posts: 92915
Own Kudos [?]: 619014 [3]
Given Kudos: 81595
Send PM
GMAT Club Legend
GMAT Club Legend
Joined: 03 Oct 2013
Affiliations: CrackVerbal
Posts: 4946
Own Kudos [?]: 7627 [1]
Given Kudos: 215
Location: India
Send PM
SVP
SVP
Joined: 27 May 2012
Posts: 1680
Own Kudos [?]: 1424 [0]
Given Kudos: 632
Send PM
GMAT Club Legend
GMAT Club Legend
Joined: 03 Jun 2019
Posts: 5344
Own Kudos [?]: 3964 [0]
Given Kudos: 160
Location: India
GMAT 1: 690 Q50 V34
WE:Engineering (Transportation)
Send PM
Re: A factory produces nuts and bolts. A machine in it produces only nuts [#permalink]
Given: A factory produces nuts and bolts. A machine in it produces only nuts while another produces only bolts. The machine producing only nuts produces 400 nuts per minute and need to be cleared for 15 minutes after production of 2000 nuts. The machine producing only bolts produces 300 bolts per minute and needs to be cleared for 15 minutes after production of 3000 bolts.
Asked: Find the minimum time required to produce 12000 pairs of bolts and nuts if both machines are operated simultaneously.

Time required by machine A to produce 2000 nuts = 5 mins + 15 mins rest
Time required by machine B to produce 3000 bolts = 10 mins + 15 mins rest

Time required by machine A to produce 12000 nuts = 5 + 15 + 5 + 15 + 5 + 15 + 5 + 15 + 5 + 15 + 5 = 30 + 75 = 105 mins
Time required by machine B to produce 12000 bolts = 10 + 15 + 10 + 15 + 10 + 15 + 10 = 40 + 45 = 85 mins

The minimum time required to produce 12000 pairs of bolts and nuts if both machines are operated simultaneously = max(105,85) = 105 mins


IMO C
User avatar
Non-Human User
Joined: 09 Sep 2013
Posts: 32679
Own Kudos [?]: 822 [0]
Given Kudos: 0
Send PM
Re: A factory produces nuts and bolts. A machine in it produces only nuts [#permalink]
Hello from the GMAT Club BumpBot!

Thanks to another GMAT Club member, I have just discovered this valuable topic, yet it had no discussion for over a year. I am now bumping it up - doing my job. I think you may find it valuable (esp those replies with Kudos).

Want to see all other topics I dig out? Follow me (click follow button on profile). You will receive a summary of all topics I bump in your profile area as well as via email.
GMAT Club Bot
Re: A factory produces nuts and bolts. A machine in it produces only nuts [#permalink]
Moderators:
Math Expert
92915 posts
Senior Moderator - Masters Forum
3137 posts

Powered by phpBB © phpBB Group | Emoji artwork provided by EmojiOne