Last visit was: 24 Apr 2024, 01:37 It is currently 24 Apr 2024, 01:37

Close
GMAT Club Daily Prep
Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Close
Request Expert Reply
Confirm Cancel
SORT BY:
Date
Tags:
Difficulty: Sub 505 Levelx   Work/Rate Problemsx                     
Show Tags
Hide Tags
User avatar
Manager
Manager
Joined: 02 Dec 2012
Posts: 172
Own Kudos [?]: 23844 [44]
Given Kudos: 23
Send PM
Most Helpful Reply
Math Expert
Joined: 02 Sep 2009
Posts: 92900
Own Kudos [?]: 618671 [21]
Given Kudos: 81586
Send PM
General Discussion
Manager
Manager
Joined: 30 Mar 2013
Posts: 80
Own Kudos [?]: 180 [0]
Given Kudos: 197
Location: United States
GMAT 1: 760 Q50 V44
Send PM
Senior Manager
Senior Manager
Joined: 09 Sep 2013
Status:Alum
Posts: 412
Own Kudos [?]: 394 [0]
Given Kudos: 155
Location: United States
GMAT 1: 730 Q52 V37
Send PM
Re: Machine A produces bolts at a uniform rate of 120 [#permalink]
Machine A produces 120 bolts every 40 seconds.
How many bolts does Machine A produce every second?
Machine A produces 120/40 = 3 bolts every second.

Machine B produces 100 bolts every 20 seconds.
How many bolts does Machine B produce every second?
Machine B produces 100/20 = 5 bolts every second.

Together, Machine A and Machine B produces 3+5 = 8 bolts every second.

8 bolts / 1 sec = 200 bolts / x sec

Cross multiply, and get 200 = 8x; so, 25 = x.
So it takes 25 seconds to produce 200 bolts, when Machine A and Machine B work together.




Quote:
why cant i do it this way:
take 1/time taken for each machine to produce 20 bolts: thats (1/60) for A plus (1/100) for B. Then I add them up and take the reciprocal to get total time taken. thats 37.45. so its 37.45 bolts every 20 secs. so that 106.8 seconds for 200 bolts.


Unfortunately, I'm having trouble following your logic. It looks like you try to find how much time it takes to produce 20 bolts, but then later try to figure out how many bolts are produced every 20 seconds?
Manager
Manager
Joined: 30 Mar 2013
Posts: 80
Own Kudos [?]: 180 [0]
Given Kudos: 197
Location: United States
GMAT 1: 760 Q50 V44
Send PM
Re: Machine A produces bolts at a uniform rate of 120 [#permalink]
I apply the simple formula: 1/(time taken by machine A) + 1/(time taken by machine B) = 1/(total time taken by both machines, together. this is now the rate (together). to get total time taken, inverse it. but i see what i did. i started adding the total bolts, thinking thats the time. i see my error, thank you. but the formula mentioned above (in my post) is correct, right?
avatar
Manager
Manager
Joined: 07 Apr 2014
Posts: 68
Own Kudos [?]: 112 [1]
Given Kudos: 81
Send PM
Machine A produces bolts at a uniform rate of 120 every 40 [#permalink]
1
Kudos
Walkabout wrote:
Machine A produces bolts at a uniform rate of 120 every 40 seconds, and Machine B produces bolts at a uniform rate of 100 every 20 seconds. If the two machines run simultaneously, how many seconds will it take for them to produce a total of 200 bolts?

(A) 22
(B) 25
(C) 28
(D) 32
(E) 56


Machine A .. 120 in 40 seconds then 3 /sec
machine B .. 100 in 20 seconds then 5/sec

in one sec both can produce 8.

so for 200 , 200/8 = 25
avatar
SVP
SVP
Joined: 27 Dec 2012
Status:The Best Or Nothing
Posts: 1562
Own Kudos [?]: 7207 [3]
Given Kudos: 193
Location: India
Concentration: General Management, Technology
WE:Information Technology (Computer Software)
Send PM
Machine A produces bolts at a uniform rate of 120 every 40 [#permalink]
3
Kudos
Time required = \(\frac{200}{\frac{120}{40} + \frac{100}{20}} = \frac{200}{8} = 25\)

Answer = B
Board of Directors
Joined: 11 Jun 2011
Status:QA & VA Forum Moderator
Posts: 6072
Own Kudos [?]: 4689 [0]
Given Kudos: 463
Location: India
GPA: 3.5
WE:Business Development (Commercial Banking)
Send PM
Re: Machine A produces bolts at a uniform rate of 120 every 40 [#permalink]
Walkabout wrote:
Machine A produces bolts at a uniform rate of 120 every 40 seconds, and Machine B produces bolts at a uniform rate of 100 every 20 seconds. If the two machines run simultaneously, how many seconds will it take for them to produce a total of 200 bolts?

(A) 22
(B) 25
(C) 28
(D) 32
(E) 56


Efficiency of machine A = 3 bolts/sec
Efficiency of machine B = 5 bolts/sec

Combined efficiency of the 8 bolts/sec

So, Time required to produce 200 bolts will be \(\frac{200}{8}\) = 25 seconds...

Answer will be (B) 25
Target Test Prep Representative
Joined: 14 Oct 2015
Status:Founder & CEO
Affiliations: Target Test Prep
Posts: 18753
Own Kudos [?]: 22042 [2]
Given Kudos: 283
Location: United States (CA)
Send PM
Re: Machine A produces bolts at a uniform rate of 120 every 40 [#permalink]
1
Kudos
1
Bookmarks
Expert Reply
Walkabout wrote:
Machine A produces bolts at a uniform rate of 120 every 40 seconds, and Machine B produces bolts at a uniform rate of 100 every 20 seconds. If the two machines run simultaneously, how many seconds will it take for them to produce a total of 200 bolts?

(A) 22
(B) 25
(C) 28
(D) 32
(E) 56


We are given that machine A produces bolts at a uniform rate of 120 every 40 seconds. Thus, the rate of Machine A is 120/40 = 3 bolts/second.

We are also given that Machine B produces bolts at a uniform rate of 100 every 20 seconds. Thus, the rate of Machine B is 100/20 = 5 bolts/second.

We need to determine the time it will take to produce 200 bolts when the two machines run simultaneously.

To determine the time to produce 200 bolts, we can use the combined work formula:

Work by Machine A + Work by Machine B = 200 bolts (the total work completed).

Because both machines are working simultaneously, we can say that they both work together for t seconds. We now can express the individual work done by Machine A and by Machine B. We must remember that work = rate x time.

Work done by Machine A = 3t

Work done by Machine B = 5t

3t + 5t = 200

8t = 200

t = 200/8 = 25

Answer: B
Manager
Manager
Joined: 08 Dec 2021
Posts: 65
Own Kudos [?]: 11 [0]
Given Kudos: 31
Location: India
Concentration: Operations, Leadership
WE:Design (Manufacturing)
Send PM
Re: Machine A produces bolts at a uniform rate of 120 every 40 [#permalink]
machine A = 120/40 SECONDS = 3/sec
machine B = 100/20 seconds = 5/sec
A+B = 8/SEC
FOR 200 = 200/8 = 25SEC
User avatar
Non-Human User
Joined: 09 Sep 2013
Posts: 32639
Own Kudos [?]: 821 [0]
Given Kudos: 0
Send PM
Re: Machine A produces bolts at a uniform rate of 120 every 40 [#permalink]
Hello from the GMAT Club BumpBot!

Thanks to another GMAT Club member, I have just discovered this valuable topic, yet it had no discussion for over a year. I am now bumping it up - doing my job. I think you may find it valuable (esp those replies with Kudos).

Want to see all other topics I dig out? Follow me (click follow button on profile). You will receive a summary of all topics I bump in your profile area as well as via email.
GMAT Club Bot
Re: Machine A produces bolts at a uniform rate of 120 every 40 [#permalink]
Moderators:
Math Expert
92893 posts
Senior Moderator - Masters Forum
3137 posts

Powered by phpBB © phpBB Group | Emoji artwork provided by EmojiOne