Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.
Customized for You
we will pick new questions that match your level based on your Timer History
Track Your Progress
every week, we’ll send you an estimated GMAT score based on your performance
Practice Pays
we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Thank you for using the timer!
We noticed you are actually not timing your practice. Click the START button first next time you use the timer.
There are many benefits to timing your practice, including:
Master the GMAT with expert live instruction, a personalized study plan, and real-time support. Includes 40 hours of online classes plus 6 months of access to the TTP GMAT OnDemand video course. Class date: Mon/Wed June 22, 2026 →August 26, 2026
Be sure to select an answer first to save it in the Error Log before revealing the correct answer (OA)!
Difficulty:
(N/A)
Question Stats:
0%
(00:00)
correct 100%
(03:03)
wrong
based on 2
sessions
History
Date
Time
Result
Not Attempted Yet
Am confused by the question. Please explain the logic in solving this question.
To do a certain work C alone takes twice as long as A and B together; A would take 3 times as long as B and C together. All three together complete the work in 5 days. How long would each take separately?
Answer is A in 20, B in 12 and C in 15 days.
Archived Topic
Hi there,
This topic has been closed and archived due to inactivity or violation of community quality standards. No more replies are possible here.
Still interested in this question? Check out the "Best Topics" block below for a better discussion on this exact question, as well as several more related questions.
Could be too long winded as I am weaker at work rate problems but:
C alone takes twice as long as A and B together = 2AB A and B together take 1 AB The total time taken is 5 days so: 2AB+1AB =5 days 1/rate = 1/3AB 1/1AB = (1/3AB) / 3 1/1AB = (1/5)* 1/3 1/1AB = 1/15 1AB = 15 days as 1AB = C C takes 15 days
A: 3BC+BC = 5 days 1/rate = 1/4BC 1/1BC = (1/4BC) / 4 1/1 BC = (1/5) * 1/4 1BC = 20 days A takes 20 days
Could be too long winded as I am weaker at work rate problems but:
C alone takes twice as long as A and B together = 2AB A and B together take 1 AB The total time taken is 5 days so: 2AB+1AB =5 days 1/rate = 1/3AB 1/1AB = (1/3AB) / 3 1/1AB = (1/5)* 1/3 1/1AB = 1/15 1AB = 15 days as 1AB = C C takes 15 days
Show more
My Doubt is that the question says C= 2A+2B So 2A+2B+A+B = 3(A+B) = Total Work = 1/5. There for A+B = 1/5*1/3=1/15 So C = 1/5 -1/15 =2/15 or 7.5 days. But the answer is C did the work in 15 days.
Could be too long winded as I am weaker at work rate problems but:
C alone takes twice as long as A and B together = 2AB A and B together take 1 AB The total time taken is 5 days so: 2AB+1AB =5 days 1/rate = 1/3AB 1/1AB = (1/3AB) / 3 1/1AB = (1/5)* 1/3 1/1AB = 1/15 1AB = 15 days as 1AB = C C takes 15 days
My Doubt is that the question says C= 2A+2B So 2A+2B+A+B = 3(A+B) = Total Work = 1/5. There for A+B = 1/5*1/3=1/15 So C = 1/5 -1/15 =2/15 or 7.5 days. But the answer is C did the work in 15 days.
Where did i go wrong
Show more
This is where the error occurs:
C= 2A+2B C actually works at half the rate, so is the equivalent of half of AB working alone, while A and B working together do the work at a rate of AB. So it is: C=1/2(A+B)
1.5(A+B) = 1/5 <- this is the total time of A,B and C together A+B = 1/5*2/3 = 2/15 <- the answer has now changed to show the rate of AB's work rate A+B = 7.5 <- this is A and B working together So double the rate becomes: 2*7.5 = 15 days
My first explanation did not make this inference clear. Hope this is better
Thanks for the great help Here is how i finally got it. This is easy infact and i made it look worse. My approach was wrong at first and that made my answer wrong.
C takes twice the time take by A and B together. So C takes half the the time of A+B. That is C = A+B/2 ; 2C = A+B So adding one more C to the right and left we get 3C = A+B+C. A+B+C completes the work in 5 days.
So 3C = 1/5 and C = 1/5*3 = 1/15. C alone take 15 days.
Now A alone take thrice the time by B and C together. Use the above strategy to find A's work rate and finally find B by adding A and C and subtracting it from total work i.e., 1/5
So A=20 B = 12 and C = 15 BINGO!!
Archived Topic
Hi there,
This topic has been closed and archived due to inactivity or violation of community quality standards. No more replies are possible here.
Still interested in this question? Check out the "Best Topics" block above for a better discussion on this exact question, as well as several more related questions.