Last visit was: 26 Apr 2024, 05:22 It is currently 26 Apr 2024, 05:22

Close
GMAT Club Daily Prep
Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Close
Request Expert Reply
Confirm Cancel
SORT BY:
Date
Tags:
Difficulty: Sub 505 Levelx   Work/Rate Problemsx                     
Show Tags
Hide Tags
Math Expert
Joined: 02 Sep 2009
Posts: 92930
Own Kudos [?]: 619154 [14]
Given Kudos: 81609
Send PM
Math Expert
Joined: 02 Sep 2009
Posts: 92930
Own Kudos [?]: 619154 [3]
Given Kudos: 81609
Send PM
User avatar
Manager
Manager
Joined: 04 Oct 2013
Posts: 130
Own Kudos [?]: 298 [1]
Given Kudos: 55
Location: India
GMAT Date: 05-23-2015
GPA: 3.45
Send PM
Senior Manager
Senior Manager
Joined: 24 Nov 2015
Posts: 408
Own Kudos [?]: 125 [0]
Given Kudos: 231
Location: United States (LA)
Send PM
Re: Machine X runs at a constant rate and produces a lot consist [#permalink]
from statement 1 , we get to know both the rates of X and Y. so sufficient
from statement 2 , we know that x and y will take 1 hour combined as rate of x is given 2 hours which is double the combined rate. so sufficient
correct answer - D
Intern
Intern
Joined: 05 Jun 2016
Posts: 17
Own Kudos [?]: 4 [0]
Given Kudos: 125
Send PM
Re: Machine X runs at a constant rate and produces a lot consist [#permalink]
Bunuel wrote:
[b]SOLUTION[/b]

Machine X runs at a constant rate and produces a lot consisting of 100 cans in 2 hours. How much less time would it take to produce the lot of cans if both Machines X and Y were run simultaneously?

Machine X produces 100 cans in 2 hours --> the rate of X is (rate) = (job)/(time) = 100/2 = 50 cans per hour.

(1) Both Machines X and Y produce the same number of cans per hour --> so we know both the rates of X and Y. Sufficient.

(2) It takes Machine X twice as long to produce the lot of cans as it takes Machines X and Y running simultaneously to produce the lot. Since Machine X takes 2 hours to produce the lot, then both Machines X and Y would take 1 hour to produce the lot. Sufficient.

Answer: D.


Hi Brunei ,

For option 2 : Why Ta = 1 and Tb = 1 . Why not Ta=1.5 and Tb = 0.5 . Could you please explain by equations.
Math Expert
Joined: 02 Sep 2009
Posts: 92930
Own Kudos [?]: 619154 [1]
Given Kudos: 81609
Send PM
Re: Machine X runs at a constant rate and produces a lot consist [#permalink]
1
Kudos
Expert Reply
Bobbyvg wrote:
Bunuel wrote:
[b]SOLUTION[/b]

Machine X runs at a constant rate and produces a lot consisting of 100 cans in 2 hours. How much less time would it take to produce the lot of cans if both Machines X and Y were run simultaneously?

Machine X produces 100 cans in 2 hours --> the rate of X is (rate) = (job)/(time) = 100/2 = 50 cans per hour.

(1) Both Machines X and Y produce the same number of cans per hour --> so we know both the rates of X and Y. Sufficient.

(2) It takes Machine X twice as long to produce the lot of cans as it takes Machines X and Y running simultaneously to produce the lot. Since Machine X takes 2 hours to produce the lot, then both Machines X and Y would take 1 hour to produce the lot. Sufficient.

Answer: D.


Hi Brunei ,

For option 2 : Why Ta = 1 and Tb = 1 . Why not Ta=1.5 and Tb = 0.5 . Could you please explain by equations.


We are told that Machine X produces 100 cans in 2 hours.

(2) says that "It takes Machine X twice as long to produce the lot of cans as it takes Machines X and Y running simultaneously to produce the lot".

Since Machine X takes 2 hours to produce the lot, then both Machines X and Y would take 1 hour to produce the lot.
Senior Manager
Senior Manager
Joined: 09 Aug 2020
Posts: 338
Own Kudos [?]: 289 [0]
Given Kudos: 494
Location: India
Concentration: Marketing, General Management
Send PM
Re: Machine X runs at a constant rate and produces a lot consist [#permalink]
Can someone help solving option 1. I know the rates become same. How to solve further?
GMAT Club Bot
Re: Machine X runs at a constant rate and produces a lot consist [#permalink]
Moderator:
Math Expert
92929 posts

Powered by phpBB © phpBB Group | Emoji artwork provided by EmojiOne