Last visit was: 25 Apr 2024, 19:27 It is currently 25 Apr 2024, 19:27

Close
GMAT Club Daily Prep
Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Close
Request Expert Reply
Confirm Cancel
SORT BY:
Date
Tags:
Show Tags
Hide Tags
avatar
Intern
Intern
Joined: 23 Oct 2011
Posts: 34
Own Kudos [?]: 262 [88]
Given Kudos: 7
Location: Ukraine
Schools: LBS '14 (M)
GMAT 1: 650 Q44 V35
WE:Corporate Finance (Mutual Funds and Brokerage)
Send PM
Most Helpful Reply
Math Expert
Joined: 02 Sep 2009
Posts: 92915
Own Kudos [?]: 619038 [43]
Given Kudos: 81595
Send PM
Tutor
Joined: 16 Oct 2010
Posts: 14823
Own Kudos [?]: 64923 [14]
Given Kudos: 426
Location: Pune, India
Send PM
General Discussion
avatar
Intern
Intern
Joined: 27 Oct 2011
Posts: 10
Own Kudos [?]: 37 [7]
Given Kudos: 5
Schools: Cambridge
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
4
Kudos
3
Bookmarks
JubtaGubar wrote:
Randy can rebuild an automobile engine in a hours. Alvin can rebuild the same engine in b hours. If Randy and Alvin work together at their respective rates to rebuild the engine, which of the following represents the portion of the job that Randy will not have to complete?
A) ab/(a+b)
B) (a-b)/(a+b)
C) b/(b-a)
D) a/(a+b)
E) b/(a+b)


Let total work completion be denoted as 1.
Randy and Alvin can together complete work in ab/a+b hours.
Randy's 1hr work is 1/a.
Alvin's 1 hr work is 1/b.

Alvin's portion of total work = Alvin's 1hr work /total 1 hr work.
=(1/b)/((a+b)/ab)
=a/(a+b)
That's the portion of work Randy need not do.

D.

Hope that helps.
User avatar
Current Student
Joined: 23 Oct 2010
Posts: 235
Own Kudos [?]: 1111 [3]
Given Kudos: 73
Location: Azerbaijan
Concentration: Finance
Schools: HEC '15 (A)
GMAT 1: 690 Q47 V38
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
2
Kudos
1
Bookmarks
Rate of Randy - 1/a
Rate of Alvin 1/b

sum of their rates =1/a+1/b=(a+b)/ab

the job that Randy will not have to complete = 1 - (rate of randy/total rate)=
=1- (1/a)/(a+b)/ab=a/(a+b)

d is the answ
Math Expert
Joined: 02 Sep 2009
Posts: 92915
Own Kudos [?]: 619038 [6]
Given Kudos: 81595
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
2
Kudos
3
Bookmarks
Expert Reply
JubtaGubar wrote:
Randy can rebuild an automobile engine in a hours. Alvin can rebuild the same engine in b hours. If Randy and Alvin work together at their respective rates to rebuild the engine, which of the following represents the portion of the job that Randy will not have to complete?

A. ab/(a+b)
B. (a-b)/(a+b)
C. b/(b-a)
D. a/(a+b)
E. b/(a+b)


Similar questions to practice:
machine-a-can-complete-a-certain-job-in-x-hours-machine-b-126639.html
baker-s-dozen-128782-20.html#p1057508
avatar
Intern
Intern
Joined: 23 Oct 2011
Posts: 34
Own Kudos [?]: 262 [1]
Given Kudos: 7
Location: Ukraine
Schools: LBS '14 (M)
GMAT 1: 650 Q44 V35
WE:Corporate Finance (Mutual Funds and Brokerage)
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
1
Bookmarks
Thank you for explanation, but I still cannot understand what is asked in a question:
which of the following represents the portion of the job that Randy will not have to complete

could you please explain the task clearer?
User avatar
Manager
Manager
Joined: 28 Dec 2010
Posts: 216
Own Kudos [?]: 774 [0]
Given Kudos: 33
Location: India
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
thanks Bunuel. its clear now!
User avatar
Senior Manager
Senior Manager
Joined: 13 Aug 2012
Posts: 336
Own Kudos [?]: 1821 [1]
Given Kudos: 11
Concentration: Marketing, Finance
GPA: 3.23
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
1
Kudos
\(R-rate=\frac{1}{ahrs}\)
\(A-rate=\frac{1}{bhrs}\)

Rate of working together
\(\frac{1}{a}+\frac{1}{b}=\frac{a+b}{ab}\)

Time=reciprocal of rate together
\(t=\frac{ab}{a+b}\)

Work done by Alvin
\(W=\frac{1}{b}(ab/a+b)=\frac{a}{a+B}\)

Answer:D
User avatar
Director
Director
Joined: 03 Aug 2012
Posts: 587
Own Kudos [?]: 3156 [1]
Given Kudos: 322
Concentration: General Management, General Management
GMAT 1: 630 Q47 V29
GMAT 2: 680 Q50 V32
GPA: 3.7
WE:Information Technology (Investment Banking)
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
1
Kudos
a=2
b=3

1/a + 1/b = 5/6 Rate

Rate * Time = Work
5/6 * Time = 1

Time = 6/5

Hence both of them work for 6/5 hours

Work done by b in 6/5 hours is

1/3 * 6/5 = 2/5

Check the options for work done = 2/5 for above given values of a and b
User avatar
Manager
Manager
Joined: 26 Sep 2013
Posts: 151
Own Kudos [?]: 598 [0]
Given Kudos: 40
Concentration: Finance, Economics
GMAT 1: 670 Q39 V41
GMAT 2: 730 Q49 V41
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
I solved by plugging smart numbers. I don't get it conceptually though, how can the amount of work someone DOESN'T have to do be their time to do the job, divided by the total time each would take to do the job. Seems like that would give you the amount of time it took Randy to do the work, not the portion he DIDN'T have to do.
Tutor
Joined: 16 Oct 2010
Posts: 14823
Own Kudos [?]: 64923 [6]
Given Kudos: 426
Location: Pune, India
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
6
Kudos
Expert Reply
AccipiterQ wrote:
I solved by plugging smart numbers. I don't get it conceptually though, how can the amount of work someone DOESN'T have to do be their time to do the job, divided by the total time each would take to do the job. Seems like that would give you the amount of time it took Randy to do the work, not the portion he DIDN'T have to do.


When the question asks you: which of the following represents the portion of the job that Randy will not have to complete?
it is just another way of saying: which of the following represents the portion of the job that Alvin will do?

If I and you are working on something, you will not have to do the work that I am completing. So look at it from Alvin's perspective.

Work done by Alvin = (Rate of Alvin)*(Time taken to complete the job together) = (1/b)*(ab/(a+b)) = a/(a+b)
User avatar
Manager
Manager
Joined: 26 Sep 2013
Posts: 151
Own Kudos [?]: 598 [0]
Given Kudos: 40
Concentration: Finance, Economics
GMAT 1: 670 Q39 V41
GMAT 2: 730 Q49 V41
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
VeritasPrepKarishma wrote:
AccipiterQ wrote:
I solved by plugging smart numbers. I don't get it conceptually though, how can the amount of work someone DOESN'T have to do be their time to do the job, divided by the total time each would take to do the job. Seems like that would give you the amount of time it took Randy to do the work, not the portion he DIDN'T have to do.


When the question asks you: which of the following represents the portion of the job that Randy will not have to complete?
it is just another way of saying: which of the following represents the portion of the job that Alvin will do?

If I and you are working on something, you will not have to do the work that I am completing. So look at it from Alvin's perspective.

Work done by Alvin = (Rate of Alvin)*(Time taken to complete the job together) = (1/b)*(ab/(a+b)) = a/(a+b)



ah, when you word it that way it makes perfect sense!
Manager
Manager
Joined: 28 Jan 2018
Posts: 113
Own Kudos [?]: 77 [0]
Given Kudos: 273
Location: Taiwan
GMAT 1: 690 Q47 V38
GPA: 3.34
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
VeritasKarishma
Can you help me with this problem?

I set up numbers and got this question wrong.
I supposed
Total work is 60 units
Randy produces 3 units / hour
Alvin produces 2 units / hour
Together they produce 5 units / hour
60 / 5 = 12 hours
Randy did 36 units, Alvin did 24 units
The part Randy did not produce is 24 units, so I arrived at 24/60 = 2/5 = 2/(3+2)
What did I do wrong?
Tutor
Joined: 16 Oct 2010
Posts: 14823
Own Kudos [?]: 64923 [0]
Given Kudos: 426
Location: Pune, India
Send PM
Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
Expert Reply
lary301254M7 wrote:
VeritasKarishma
Can you help me with this problem?

I set up numbers and got this question wrong.
I supposed
Total work is 60 units
Randy produces 3 units / hour
Alvin produces 2 units / hour
Together they produce 5 units / hour
60 / 5 = 12 hours
Randy did 36 units, Alvin did 24 units
The part Randy did not produce is 24 units, so I arrived at 24/60 = 2/5 = 2/(3+2)
What did I do wrong?


You did nothing wrong here. But what are a and b here?
a - Time taken by Randy to do the work = 60/3 = 20 hrs
b - Time taken by Alvin to do the work = 60/2 = 30 hrs

When you put a = 20 and b = 30 in option (D), you get 2/5 (which is expected).

P.S. - For a quicker turn around, just drop in a message on my PS Expert thread too
https://gmatclub.com/forum/veritas-prep ... 78042.html
Senior Manager
Senior Manager
Joined: 02 Jan 2016
Status:Studying 4Gmat
Posts: 366
Own Kudos [?]: 96 [0]
Given Kudos: 314
Location: India
Concentration: Strategy, Entrepreneurship
GMAT 1: 590 Q37 V33
GPA: 4
WE:Law (Manufacturing)
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
@E-gmat I tried using your LCM method but doesnt seem to work.

Bunuel can we do this without by number picking ? I tried but kept getting wrong answer.
Math Expert
Joined: 02 Sep 2009
Posts: 92915
Own Kudos [?]: 619038 [0]
Given Kudos: 81595
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
Expert Reply
hero_with_1000_faces wrote:
@E-gmat I tried using your LCM method but doesnt seem to work.

Bunuel can we do this without by number picking ? I tried but kept getting wrong answer.


Have you checked THIS POST?
Senior Manager
Senior Manager
Joined: 02 Jan 2016
Status:Studying 4Gmat
Posts: 366
Own Kudos [?]: 96 [0]
Given Kudos: 314
Location: India
Concentration: Strategy, Entrepreneurship
GMAT 1: 590 Q37 V33
GPA: 4
WE:Law (Manufacturing)
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
Yes Bunuel,
However, I tried doing this by Number Picking and than taking LCM of the Number:
So, this is How i tried doing:

Randy "a" hours = 3 (assumed) and Alvin "b" hours = 2 (assumed) .

So, work (LCM) = 6, thus Randy does "2 units" in 1 hour and Alvin does "3 units" in 1 hour. So 5 units in 1 hour.

therefore they do 6/5 = 1.2 hours of work
and Alvin only does 3.6 unit of work. "replacing this in correct answer Choice we get"

3/5 = so not matching ? I dont get it, usually this method works like a charm, but here this doesnt seem to work, is it because "Number Picking" doesn't always work ?
User avatar
Non-Human User
Joined: 09 Sep 2013
Posts: 32680
Own Kudos [?]: 822 [0]
Given Kudos: 0
Send PM
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
Hello from the GMAT Club BumpBot!

Thanks to another GMAT Club member, I have just discovered this valuable topic, yet it had no discussion for over a year. I am now bumping it up - doing my job. I think you may find it valuable (esp those replies with Kudos).

Want to see all other topics I dig out? Follow me (click follow button on profile). You will receive a summary of all topics I bump in your profile area as well as via email.
GMAT Club Bot
Re: Randy can rebuild an automobile engine in a hours. Alvin can [#permalink]
Moderators:
Math Expert
92915 posts
Senior Moderator - Masters Forum
3137 posts

Powered by phpBB © phpBB Group | Emoji artwork provided by EmojiOne