Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.
Customized for You
we will pick new questions that match your level based on your Timer History
Track Your Progress
every week, we’ll send you an estimated GMAT score based on your performance
Practice Pays
we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Thank you for using the timer!
We noticed you are actually not timing your practice. Click the START button first next time you use the timer.
There are many benefits to timing your practice, including:
Learn how Kamakshi achieved a GMAT 675 with an impressive 96th %ile in Data Insights. Discover the unique methods and exam strategies that helped her excel in DI along with other sections for a balanced and high score.
At one point, she believed GMAT wasn’t for her. After scoring 595, self-doubt crept in and she questioned her potential. But instead of quitting, she made the right strategic changes. The result? A remarkable comeback to 695. Check out how Saakshi did it.
Verbal trouble on GMAT? Fix it NOW! Join Sunita Singhvi for a focused webinar on actionable strategies to boost your Verbal score and take your performance to the next level.
Be sure to select an answer first to save it in the Error Log before revealing the correct answer (OA)!
Difficulty:
(N/A)
Question Stats:
0%
(00:00)
correct 0%
(00:00)
wrong
based on 0
sessions
History
Date
Time
Result
Not Attempted Yet
A machine begins pouring corn into an open silo at a constant rate of 3 cubic meters per minute. At the same time, a painter begins painting the outside wall of the silo. If the silo has the shape of a right circular cylinder with an inner wall radius of 5 meters and an outer wall radius of 6 meters, will the silo be filled to capacity with corn before the surface of the outside wall is completely painted?
(1) The painter paints at a constant rate of 1 square meter per minute.
(2) The height of the silo is 18 meters.
Archived Topic
Hi there,
This topic has been closed and archived due to inactivity or violation of community quality standards. No more replies are possible here.
Still interested in this question? Check out the "Best Topics" block below for a better discussion on this exact question, as well as several more related questions.
A machine begins pouring corn into an open silo at a constant rate of 3 cubic meters per minute. At the same time, a painter begins painting the outside wall of the silo. If the silo has the shape of a right circular cylinder with an inner wall radius of 5 meters and an outer wall radius of 6 meters, will the silo be filled to capacity with corn before the surface of the outside wall is completely painted?
(1) The painter paints at a constant rate of 1 square meter per minute.
(2) The height of the silo is 18 meters.
Show more
hs = height corn filled in a minute
w*l*hs =3 --> hs = 3/(5*6) = 1/10
(1) The painter paints at a constant rate of 1 square meter per minute.
hp = height painter paints in a minute
2(w*hp+l*hp) = 1 --> ( 2(5*hp+6*hp)=1 hp= 1/22
will the silo be filled to capacity with corn before the surface of the outside wall is completely painted? Yes .. hs > hp
Sufficient
(2) The height of the silo is 18 meters Insuffcient.. We don't the rate at which painting..
A What is OA.
Archived Topic
Hi there,
This topic has been closed and archived due to inactivity or violation of community quality standards. No more replies are possible here.
Still interested in this question? Check out the "Best Topics" block above for a better discussion on this exact question, as well as several more related questions.