Official Solution: Bunuel
From the information in the three tabs, which of the following conclusions is best supported?
• Stage 1 is directed by the Operations Department. Incorrect. Tab 2 shows that Stage 1 is handled by Curation, not Operations.
• The final stage before an exhibition opens is overseen by the Administration Department. Incorrect. Tab 2 indicates Stage 6 is managed by Operations, not Administration.
• Stage 3 generally requires at least 4 days to complete. Incorrect. Tab 1 states that no stage can exceed 3 days, so Stage 3 cannot require 4 or more days.
• Stage 3, on average, requires the longest time to be completed. Correct. Supported. From Tab 3, Stage 3 requires 5 days for
Ancient Coins, 2 days for
Modern Sculpture, 2 days for
Medieval Tapestries, and 2 days for
Impressionist Paintings. This totals 11 days across 4 exhibitions, or an average of about 2.75 days. Since this is longer than the averages for other stages, Stage 3 is the stage that, on average, requires the most time to complete.
• An exhibition that is discontinued always stops during Stage 2. Incorrect. Tab 1 explains that discontinuation (Stage 0) can occur after any stage, not only Stage 2.
Correct answer: From the information in the three tabs, which of the following conclusions is best supported?
"Stage 3, on average, requires the longest time to be completed."