John takes 15 hours to complete a certain job, while Bill takes only 6 hours to complete the same job. If Steve is faster than John but slower than Bill at completing the same job, then which of the following could be the time it takes the three men together, working at their constant, individual rates, to complete the job?
A. 2 hours, 30 minutes
B. 2 hours, 45 minutes
C. 3 hours, 20 minutes
D. 3 hours, 45 minutes
E. 4 hours, 10 minutes
Kudos for a correct solution.John takes 15 hrs while Bill takes 6 hrs.
If Steve took 6 hrs too, Bill and Steve together would take 3 hrs. Then all three together would take 1/3 + 1/15 = 6/15 i.e. 15/6 hrs = 2 hrs 30 min
If Steve took 15 hrs too, John an dSteve together would take 15/2 hrs. Then all three together would take 1/6 + 2/15 = 9/30 i.e. 30/9 hrs = 3 hrs 20 mins
Since Steve takes more than 6 hrs but less than 15 hrs, all three will take time lying within this range.
Answer (B)