Last visit was: 20 Nov 2025, 02:19 It is currently 20 Nov 2025, 02:19
Close
GMAT Club Daily Prep
Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Close
Request Expert Reply
Confirm Cancel
User avatar
Bunuel
User avatar
Math Expert
Joined: 02 Sep 2009
Last visit: 20 Nov 2025
Posts: 105,408
Own Kudos:
778,448
 [3]
Given Kudos: 99,987
Products:
Expert
Expert reply
Active GMAT Club Expert! Tag them with @ followed by their username for a faster response.
Posts: 105,408
Kudos: 778,448
 [3]
2
Kudos
Add Kudos
1
Bookmarks
Bookmark this Post
User avatar
DangerPenguin
Joined: 10 Sep 2014
Last visit: 22 Dec 2014
Posts: 90
Own Kudos:
Given Kudos: 25
Posts: 90
Kudos: 118
Kudos
Add Kudos
Bookmarks
Bookmark this Post
avatar
gillesalex07
Joined: 29 Sep 2014
Last visit: 02 Apr 2015
Posts: 15
Own Kudos:
18
 [1]
Given Kudos: 11
Posts: 15
Kudos: 18
 [1]
1
Kudos
Add Kudos
Bookmarks
Bookmark this Post
avatar
devmillenium2k
Joined: 20 Jan 2013
Last visit: 25 Dec 2014
Posts: 32
Own Kudos:
Posts: 32
Kudos: 231
Kudos
Add Kudos
Bookmarks
Bookmark this Post
Statement 1:
Rate is given as 32 wrenches per second. We can easily calculate minutes required to make the 30,720 wrenches.

Sufficient . Option B,C,E are out

Statement 2:
Let's assume it takes L minutes to load wrenches into trucks and C minutes for the factory to create the wrenches.
From the given statement - C = 4*L, and C + L = 20
We can get minutes required to make the wrenches.

Sufficient

Each statement is sufficient, hence D.
avatar
kinghyts
Joined: 22 Sep 2012
Last visit: 26 Apr 2015
Posts: 106
Own Kudos:
Given Kudos: 49
Concentration: Strategy, Technology
WE:Information Technology (Computer Software)
Posts: 106
Kudos: 151
Kudos
Add Kudos
Bookmarks
Bookmark this Post
From Statement 1, we can say that :
Time taken to create wrenches= 30,720/ 32*60 = 16 mins. Sufficient

From Statement 2, we can that :
4x+ x =20 [where x is the rate of loading the wrenches to load them to the truck]
Time taken to create wrenches= 4x = 20/5*4 = 16 mins. Sufficient

D) should be the answer
User avatar
Bunuel
User avatar
Math Expert
Joined: 02 Sep 2009
Last visit: 20 Nov 2025
Posts: 105,408
Own Kudos:
Given Kudos: 99,987
Products:
Expert
Expert reply
Active GMAT Club Expert! Tag them with @ followed by their username for a faster response.
Posts: 105,408
Kudos: 778,448
Kudos
Add Kudos
Bookmarks
Bookmark this Post
Bunuel

Tough and Tricky questions: Word Problems.



If a certain factory makes a total of 30,720 wrenches, how many minutes does the factory take to make the wrenches?

(1) The factory creates the wrenches without interruption at a rate of 32 wrenches per second.

(2) It takes 4 times as long for the factory to create the wrenches as it does to load them into trucks, and it takes the factory a total of 20 minutes to do both.

Kudos for a correct solution.

Official Solution:

If a certain factory makes a total of 30,720 wrenches, how many minutes does the factory take to make the wrenches?

We must determine the number of minutes required for a factory to produce 30,720 wrenches. Call this quantity \(x\). Recall the formula for work: \(\text{work} = \text{rate} \times \text{time}\). We can rearrange this equation to solve for time: \(\text{time} = \text{work} \div \text{rate}\). The problem gives us the amount of work (30,720 wrenches), so if the rate can be determined, the time can also be determined.

Statement 1 says that the factory works at the rate of 32 wrenches per second. This can be converted to wrenches-per-minute (by using the equation 60 seconds = 1 minute). However, we do not need to go any further. Since we CAN find the rate in wrenches per minute, and since we already have the amount of work (i.e. the number of wrenches), we can solve for the time in minutes. Statement 1 alone is sufficient to answer the question. Eliminate answer choices B, C, and E. The correct answer choice is either A or D.

Statement 2 introduces a new quantity: the time necessary to load the wrenches into trucks. Call this quantity \(y\). We want to translate all this information very carefully. Notice that there are actually two equations given. The first is from the fact that it takes 4 times as long to produce the wrenches as it takes to load them into trucks: \(4y = x\), or \(y = 0.25x\). The second equation is from the fact that the time required both to produce the wrenches and to load them is 20 minutes: \(x + y = 20\). This system of equations can be solved by substitution. Substitute \(0.25x\) for \(y\) in the second equation: \(x + 0.25x = 20\). This is a single variable equation and so can be solved for \(x\), the quantity that the prompt asks for. So, Statement 2 is also sufficient.

Answer: D.
User avatar
sandaki
Joined: 12 Jan 2017
Last visit: 28 Nov 2017
Posts: 29
Own Kudos:
Given Kudos: 83
Location: India
Concentration: Operations, Leadership
Posts: 29
Kudos: 36
Kudos
Add Kudos
Bookmarks
Bookmark this Post
Bunuel
Bunuel

Tough and Tricky questions: Word Problems.



If a certain factory makes a total of 30,720 wrenches, how many minutes does the factory take to make the wrenches?

(1) The factory creates the wrenches without interruption at a rate of 32 wrenches per second.

(2) It takes 4 times as long for the factory to create the wrenches as it does to load them into trucks, and it takes the factory a total of 20 minutes to do both.

Kudos for a correct solution.

Official Solution:

If a certain factory makes a total of 30,720 wrenches, how many minutes does the factory take to make the wrenches?

We must determine the number of minutes required for a factory to produce 30,720 wrenches. Call this quantity \(x\). Recall the formula for work: \(\text{work} = \text{rate} \times \text{time}\). We can rearrange this equation to solve for time: \(\text{time} = \text{work} \div \text{rate}\). The problem gives us the amount of work (30,720 wrenches), so if the rate can be determined, the time can also be determined.

Statement 1 says that the factory works at the rate of 32 wrenches per second. This can be converted to wrenches-per-minute (by using the equation 60 seconds = 1 minute). However, we do not need to go any further. Since we CAN find the rate in wrenches per minute, and since we already have the amount of work (i.e. the number of wrenches), we can solve for the time in minutes. Statement 1 alone is sufficient to answer the question. Eliminate answer choices B, C, and E. The correct answer choice is either A or D.

Statement 2 introduces a new quantity: the time necessary to load the wrenches into trucks. Call this quantity \(y\). We want to translate all this information very carefully. Notice that there are actually two equations given. The first is from the fact that it takes 4 times as long to produce the wrenches as it takes to load them into trucks: \(4y = x\), or \(y = 0.25x\). The second equation is from the fact that the time required both to produce the wrenches and to load them is 20 minutes: \(x + y = 20\). This system of equations can be solved by substitution. Substitute \(0.25x\) for \(y\) in the second equation: \(x + 0.25x = 20\). This is a single variable equation and so can be solved for \(x\), the quantity that the prompt asks for. So, Statement 2 is also sufficient.

Answer: D.



From statement 2,we can get value of X=16min,but we dont know the count of wrenches produced in 16mins,so D should be insufficient right?
User avatar
bumpbot
User avatar
Non-Human User
Joined: 09 Sep 2013
Last visit: 04 Jan 2021
Posts: 38,595
Own Kudos:
Posts: 38,595
Kudos: 1,079
Kudos
Add Kudos
Bookmarks
Bookmark this Post
Hello from the GMAT Club BumpBot!

Thanks to another GMAT Club member, I have just discovered this valuable topic, yet it had no discussion for over a year. I am now bumping it up - doing my job. I think you may find it valuable (esp those replies with Kudos).

Want to see all other topics I dig out? Follow me (click follow button on profile). You will receive a summary of all topics I bump in your profile area as well as via email.
Moderators:
Math Expert
105408 posts
496 posts