GMAT Question of the Day - Daily to your Mailbox; hard ones only

It is currently 22 Oct 2019, 07:33

Close

GMAT Club Daily Prep

Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History

Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.

Close

Request Expert Reply

Confirm Cancel

To complete buildings that are similar in size, design, and complexity

  new topic post reply Question banks Downloads My Bookmarks Reviews Important topics  
Author Message
TAGS:

Hide Tags

Find Similar Topics 
Manager
Manager
avatar
Joined: 08 May 2015
Posts: 90
GMAT 1: 630 Q39 V38
GMAT 2: 670 Q44 V38
GMAT 3: 750 Q49 V44
To complete buildings that are similar in size, design, and complexity  [#permalink]

Show Tags

New post 13 Aug 2015, 18:47
6
00:00
A
B
C
D
E

Difficulty:

  75% (hard)

Question Stats:

56% (01:56) correct 44% (02:08) wrong based on 302 sessions

HideShow timer Statistics

To complete buildings that are similar in size, design, and complexity, construction companies working in Zone A usually take longer than those in Zone B. The equipment used by construction companies in Zone A is more sophisticated than that available to such companies operating in Zone B. It can be said that construction companies in Zone A are far less proficient than those operating in Zone B.

To evaluate the argument, it would be most useful to form a comparison between


A) the amount of time construction companies in each of the zones need to form a presentation aiming at earning participation in a new building project

B) the perception and expertise utilized by the manufacturers of the building equipment used by construction companies in the respective zones

C) the cost of the materials used in the construction of a standard building intended for housing purposes in each zone

D) the efficiency of the offices of the respective zones involved in processing the bureaucratic paperwork required for a construction project

E) the style of architecture implemented in the creation of a typical building constructed in each of the zones
Senior Manager
Senior Manager
avatar
B
Joined: 04 May 2013
Posts: 268
Location: India
Concentration: Operations, Human Resources
Schools: XLRI GM"18
GPA: 4
WE: Human Resources (Human Resources)
Re: To complete buildings that are similar in size, design, and complexity  [#permalink]

Show Tags

New post 13 Aug 2015, 20:16
Mascarfi wrote:
To complete buildings that are similar in size, design, and complexity, construction companies working in Zone A usually take longer than those in Zone B. The equipment used by construction companies in Zone A is more sophisticated than that available to such companies operating in Zone B. It can be said that construction companies in Zone A are far less proficient than those operating in Zone B.

To evaluate the argument, it would be most useful to form a comparison between

A) the amount of time construction companies in each of the zones need to form a presentation aiming at earning participation in a new building project.... PRESENTATION NOT BEING DISCUSSED HERE....proficiency of construction companies is.... INCORRECT
B) the perception and expertise utilized by the manufacturers of the building equipment used by construction companies in the respective zones....BOTH USING SAME EQUIPMENT SO expertise utilized by the manufacturers of the building equipment COMMON TO BOTH..... INCORRECT
C) the cost of the materials used in the construction of a standard building intended for housing purposes in each zone....COST NOT DISCUSSED HERE.... INCORRECT
D) the efficiency of the offices of the respective zones involved in processing the bureaucratic paperwork required for a construction project..... YA ... IF THAT BE SO ..THE REASON FOR THE DIFFERENT CONSTRUCTION TIMINGS COULD BE UNDERSTOOD... CORRECT
E) the style of architecture implemented in the creation of a typical building constructed in each of the zones
BOTH HAVE SAME STYLE HENCE IRRELEVANT ... INCORRECT .
Retired Moderator
avatar
Joined: 29 Apr 2015
Posts: 822
Location: Switzerland
Concentration: Economics, Finance
Schools: LBS MIF '19
WE: Asset Management (Investment Banking)
GMAT ToolKit User
Re: To complete buildings that are similar in size, design, and complexity  [#permalink]

Show Tags

New post 02 Sep 2015, 12:51
To solve this Investigation question, first break down the argument. The first two sentences are premises, citing facts. The last sentence uses the conclusion phrase It can be said that, letting us know that it's the conclusion:

Premise A: to build a given building, companies in Zone A take longer than those in Zone B
+
Premise B: the building equipment in Zone A is better than that in Zone B
=
Conclusion: Zone A construction companies are not as good as those in Zone B

Vital factor: ?

You are required to find the factor which is most crucial to the author's conclusion. The correct answer is an unknown factor which could support or weaken the conclusion depending on its outcome.



Answer D

This answer choice introduces a factor that can affect time and, therefore, is relevant to the conclusion. If the offices on Zone A are just as efficient as those in Zone B, then it is more likely that the lengthy building process in Zone A is related to the actual construction management and workers.

However, if Zone A has terrible bureaucracy and more red-tape than Zone B, then their construction companies are probably less to blame for taking a long time to finish projects.
_________________
Saving was yesterday, heat up the gmatclub.forum's sentiment by spending KUDOS!

PS Please send me PM if I do not respond to your question within 24 hours.
Non-Human User
User avatar
Joined: 01 Oct 2013
Posts: 5943
Re: To complete buildings that are similar in size, design, and complexity  [#permalink]

Show Tags

New post 17 Oct 2018, 05:51
Hello from the GMAT Club VerbalBot!

Thanks to another GMAT Club member, I have just discovered this valuable topic, yet it had no discussion for over a year. I am now bumping it up - doing my job. I think you may find it valuable (esp those replies with Kudos).

Want to see all other topics I dig out? Follow me (click follow button on profile). You will receive a summary of all topics I bump in your profile area as well as via email.
_________________
GMAT Club Bot
Re: To complete buildings that are similar in size, design, and complexity   [#permalink] 17 Oct 2018, 05:51
Display posts from previous: Sort by

To complete buildings that are similar in size, design, and complexity