Last visit was: 24 Sep 2026, 04:46 It is currently 24 Sep 2026, 04:46
Close
GMAT Club Daily Prep
Thank you for using the timer - this advanced tool can estimate your performance and suggest more practice questions. We have subscribed you to Daily Prep Questions via email.

Customized
for You

we will pick new questions that match your level based on your Timer History

Track
Your Progress

every week, we’ll send you an estimated GMAT score based on your performance

Practice
Pays

we will pick new questions that match your level based on your Timer History
Not interested in getting valuable practice questions and articles delivered to your email? No problem, unsubscribe here.
Close
Request Expert Reply
Confirm Cancel
User avatar
Bunuel
User avatar
Math Expert
Joined: 02 Sep 2009
Last visit: 24 Sep 2026
Posts: 113,851
Own Kudos:
843,308
 [1]
Given Kudos: 111,801
Products:
Expert
Expert reply
Active GMAT Club Expert! Tag them with @ followed by their username for a faster response.
Posts: 113,851
Kudos: 843,308
 [1]
Kudos
Add Kudos
1
Bookmarks
Bookmark this Post
User avatar
kb26
Joined: 14 Aug 2026
Last visit: 24 Sep 2026
Posts: 123
Own Kudos:
73
 [1]
Given Kudos: 22
Status:Applying
Affiliations: None
Location: India
K: B
Concentration: General Management, Strategy
GPA: 75%
WE:Management Consulting (Consulting)
Posts: 123
Kudos: 73
 [1]
1
Kudos
Add Kudos
Bookmarks
Bookmark this Post
User avatar
SwethaReddyL
Joined: 28 Nov 2023
Last visit: 24 Sep 2026
Posts: 201
Own Kudos:
47
 [1]
Given Kudos: 271
Location: India
Posts: 201
Kudos: 47
 [1]
1
Kudos
Add Kudos
Bookmarks
Bookmark this Post
User avatar
Vivek1707
Joined: 22 May 2020
Last visit: 24 Sep 2026
Posts: 372
Own Kudos:
220
 [1]
Given Kudos: 151
Products:
Posts: 372
Kudos: 220
 [1]
1
Kudos
Add Kudos
Bookmarks
Bookmark this Post
A. Incorrect — This shows the machine is much faster, so forcing manual prototypes could actually reduce efficiency.
B. Incorrect — Malfunctions and repair costs are relevant, but they don't show that the new rule will improve the design process.
C. Incorrect — Knowing how to build prototypes manually helps, but doesn't show that doing so will make the process more efficient.
D. Incorrect — This actually argues against the plan because the final prototype needs the machine for accuracy.
E. Correct — If designers currently rush sketches to the machine because it's easy, making them build the first three manually forces them to check and refine their designs before using the overloaded machine. This reduces unnecessary machine workload and makes better use of its capacity.
User avatar
counterclash1
Joined: 06 Oct 2021
Last visit: 24 Sep 2026
Posts: 201
Own Kudos:
97
 [1]
Given Kudos: 14
Location: India
Products:
Posts: 201
Kudos: 97
 [1]
1
Kudos
Add Kudos
Bookmarks
Bookmark this Post
Correct Answer (E)

It proves that effortless machine access caused hasty, wasteful designs. Imposing manual effort forces designers to check their work, directly increasing workflow efficiency.
Bunuel
The design department of a cardboard factory has a computer-operated machine that makes cuts and prepares fold lines from a standard flat piece of cardboard so that a full-size prototype can be folded and built into three dimensions. Designers constantly use the machine, which is overloaded with pending cut-outs to create, to test their sketches and, as a rule, need to build at least 5 prototypes before having a design authorized for production. To increase the department's efficiency, the factory manager is planning to introduce a rule demanding that the designers build the first three prototypes manually with pens, rulers, and cutter knives.

Which of the following, if true, most strengthens the reason to expect that the factory manager's plan will succeed?

(A) The computer-operated prototype builder needs to be manually fed a new piece of cardboard for every prototype that it prepares although with this help it can make 40 times more prototypes than a designer can in the same amount of time.

(B) The constant workload placed on the machine leads to an increase in the number of malfunctions it experiences, and repairing it is very expensive.

(C) Because the factory only purchased the computer-operated machine one year ago, all the designers know how to convert two-dimensional sketches into accurate three-dimensional prototypes manually.

(D) Since the last prototype is the most critical in the process, the authorization of the product depending upon it, building it manually would not be as accurate as allowing the machine to prepare the cut-out.

(E) Instead of checking thoroughly for mistakes, the designers are often hasty in sending their sketches to be created by the machine since doing so requires none of the effort entailed in building a prototype by hand.

Moderators:
GMAT Club Verbal Expert
7399 posts
Verbal Forum Moderator
705 posts