A. reinforced brick, cement or pyramid shaped roof with slopes of no less than 35 degrees from horizontal and no overhangs of any kind --
- wrong for considering pyramid shaped roof or overhangs as construction material D. reinforced brick, cement, if the structures have pyramid shaped roof with slopes of no less than 35 degrees from horizontal, and no overhangs of any kind ---
the roof item is a clause different from the other nouns; un//. E. reinforced brick, cement, pyramid shaped roof with slopes of no less than 35 degrees from horizontal, or no overhangs of any kind --
takes all the five materials as construction materials B. reinforced brick, or cement, or if the structures have pyramid shaped roof with slopes of no less than 35 degrees from horizontal and no overhangs of any kind --
see below C. reinforced brick, and cement, or if the structures have pyramid shaped roof with slopes of no less than 35 degrees from horizontal or no overhangs of any kind ---
see below
The difference between B and C is that B by the use of ‘or’ says that if structure uses any one of the four construction materials such as solid concrete or steel, or reinforced brick or cement, then that structure will be called hurricane resistant
On the contrary C by using ‘and’ implies that all the four materials are needed for a structure to be termed ‘hurricane resistant.
The logical question is whether one can build a structure with just concrete, or steel or reinforced bricks or cement. We require all of them to build a structure, don’t we?
Let’s also see the second part. They correct parsing of the second part is:
or if the structures have ( 1.‘pyramid shaped roof with slopes of no less than 35 degrees from horizontal’ and / or ‘no overhangs of any kind’)
Now, B, by using ‘and’ means that both the features are necessary, whereas C by using ‘or’ indicates that any one is sufficient. I feel anyone feature is sufficient for the structure to be classified as ‘HR’
Logically, I feel C should be the correct answer.